Most BEPs ship as 80 pages of ISO clause references nobody on site reads. This one is structured by deliverable, not by clause. It is the BEP we issue on live engagements, written for the modellers and coordinators it has to govern.




























Open, rename, fill in your project. Nothing you'll need to reverse-engineer from a 200-page standard.
Pre-appointment and post-appointment structure, in editable Word. ISO 19650 throughout, written in the language the trades work in. The deliverable-driven sections are tagged so reviewers reach them in one click.
Excel sheet. Discipline rows, stage columns, geometric and information LOD per cell. The one document that ends the "what level of detail" argument.
Folder taxonomy, naming convention, status codes, suitability codes. ACC / BIM360 ready. Subcontractors know where to upload without asking.
What a model must satisfy before it gets accepted into federation. Geometric, parametric, and information checks. Used by our QA team every week.
The BEP that works at your end of the table is not the BEP that works at the other end. Pick the side you sit on.
Pre-appointment BEP, EIR cross-references, LOIN matrix scoped to client-side audit. Set the standard once across every consultant and contractor.
Post-appointment BEP, federation rules, CDE structure, acceptance criteria. Run BIM across packages with the federation that holds.
Pre and post-appointment BEP, LOIN matrix, naming convention, roles matrix. For information managers writing the spec their appointed parties have to follow.