Five trades, 300mm void. Design and construction in parallel. We resolve the void once and release packages as construction catches up.




























Three things to resolve before the fast-track programme runs ahead of you.
Services packed into shallow ceiling voids and coordinated before site.
Repeated plots and shared infrastructure coordinated together: a change on one can't break the next.
Compliance validated in 3D and packages released as construction catches up.
Three stages. Click any to expand the deliverables and BIM requirements at that stage.
Clash-free design ready for fast-track release. MEP packed into shallow voids resolved zone-by-zone. Repeating units coordinated through a master model with linked plots. Compliance extracted from verified 3D data before planning submission.
MEP services in tight ceiling voids resolved zone-by-zone. Duct, cable tray, and pipework conflicts eliminated before installation.
Repeating units coordinated through a single master. Design changes propagate automatically across all plots. No duplicated work.
Area schedules, fire strategy, and accessibility extracted from the model. Planning and building control submissions backed by verified 3D data.
BIM Execution Plan structured for repeating unit types and phased release. Fast-track procurement defined from the start.
Level of Development defined per plot, per phase. Groundworks issued at LOD 300 before fit-out reaches LOD 200.
IFC 4.0 validated through Solibri before CDE data drops. Naming via Uniclass 2015 with plot and phase extensions.
Coordinated packages that eliminate site rework. Groundworks, frame, and envelope issued for construction while fit-out design continues. Subcontractor models federated against the master. No surprises on site.
Groundworks, frame, and envelope issued for construction while fit-out design continues. Your contractor starts on schedule without waiting.
Multiple trades sequenced and clash-detected in tight ceiling voids and floor penetrations. Conflicts resolved before installation.
Mechanical, electrical, and structural subcontractor models coordinated against the master. No surprises on site.
Weekly federation reviews per services zone with issues tracked in BIM Track to closure.
Common Data Environment with early-release workflows. Groundworks, frame, and envelope flow out while fit-out continues in.
Model objects mapped to construction programme. Block-by-block sequencing visualised before parallel work starts.
Data-driven handover so FM is ready on day one. As-built models verified against installation. COBie populated during construction, not after. Facilities team inherits documented, validated building information.
Models verified against installed conditions. All MEP zones, unit finishes, and compliance items checked against site reality.
COBie data populated during construction, not after. Maintenance schedules and O&M manuals built progressively. Handover is validation, not scramble.
Facilities management team receives coordinated asset data, maintenance plans, and equipment schedules. Your building is documented the day it operates.
Asset data audited per unit type against the EIR's information requirement schedule.
IFC 4.0 federation deposited in CDE with EIR sign-off attached.
Asset data mapped to client CAFM / EAM schema before transfer.
Every service we apply to a low-rise project runs through the same standard. Shallow-void coordination. Multi-plot replication. Early package release on fast-track procurement. Per-unit handover.

Tight ceiling voids, multi-plot units and fit-out packages coordinated as one system before procurement.
Explore service
Block-by-block 4D sequencing for parallel design and build. 5D quantities per plot, per phase, per trade.
Explore service
Phased CDE with early-release workflows. ISO 19650 enforcement across consultants, contractors and subcontractors.
Explore service
Asset data structured by unit type for FM-ready handover. Per-unit COBie records, not bulk schedules.
Explore service
Quantities extracted per plot, per unit type, per trade. BOQ your QS can actually trust on a fast-track procurement.
Explore service
LiDAR scan-to-BIM. Per-unit as-built verified against installed conditions before handover to FM.
Explore serviceA 30-minute screen-share through the live federated model from our low-rise portfolio. We open the coordinated model, the clash log, the shop drawings and the handover dataset, and you ask what you would on your own project.
From multi-plot residential to fast-track hospitality. Six selected projects.

Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the case
SCDA's branded interiors held to standard from a golden-floor template, interior…
Read the case
A beachfront residential high-rise coordinated core-first, with disciplined floo…
Read the case
Joinery-led architecture, structure and interior detailing across the Grove's ty…
Read the case