Industries · Landmarks

Nothing repeats. Nothing has margin for error.

Every element is one-off. Every connection is custom. Your design team is coordinating in 2D what can only be verified in 3D, and fabrication is already on the critical path. We model every bespoke element to fabrication tolerance, verify it in the model, and issue shop drawings the factory can actually build from.

Landmark coordination — complex geometry, bespoke facade panels and one-off steel connections resolved to fabrication tolerance
Prestige OneDeveloper
AL-FUTTAIMDeveloper
AECOMConsultant
DARConsultant
ArupConsultant
INNOVOMain Contractor
M4Main Contractor
AFEMain Contractor
ALEMCOMEP Specialist
ALEC FITOUTJoinery / Fit-out
Al-Tayer StocksJoinery / Fit-out
DEPAJoinery / Fit-out
Prestige OneDeveloper
AL-FUTTAIMDeveloper
AECOMConsultant
DARConsultant
ArupConsultant
INNOVOMain Contractor
M4Main Contractor
AFEMain Contractor
ALEMCOMEP Specialist
ALEC FITOUTJoinery / Fit-out
Al-Tayer StocksJoinery / Fit-out
DEPAJoinery / Fit-out
Bespoke coordination

Verify every connection before it leaves the factory

Four coordination layers for projects where no standard detail exists and every element is bespoke.

What it is
What it delivers
Complex Geometry

Non-standard structural forms, curved facades, and bespoke architectural elements modelled to fabrication-level detail. Every connection is unique. A 5mm tolerance error on a curved facade panel means a panel that doesn't fit and a fabrication run that starts over.

Your team identifies fabrication conflicts in the model, not on site. Steel connections and facade panel geometry validated against tolerances before purchase orders are placed.

Bespoke Fabrication

Custom structural steel, specialist cladding, and one-off MEP configurations that cannot rely on standard details. Without model-generated shop drawings, fabricators work from 2D details that don't account for adjacent trades.

Your fabricators receive shop drawings tied directly to an error-free coordinated model. Fabrication packages are issued with installation tolerances and sequence constraints embedded, eliminating rework.

Non-Repetitive Sequencing

No typical floor, no repeating bay. Every construction zone has its own erection logic, access constraints, and trade sequence. 4D planning resolves conflicts before they reach site.

Your team validates crane reaches, temporary works, and installation windows against the programme in advance. You avoid costly on-site sequencing decisions and schedule delays.

Multi-Discipline Integration

Structure, facade, MEP, and specialist systems converging in confined and geometrically complex zones. In landmark buildings, these zones are tighter and more irregular than standard projects. Clash detection at LOD 400 across all disciplines simultaneously.

Your design team routes services through non-standard structural zones without compromising architectural intent. All clashes surface during design, not during construction.

What we deliver

From concept geometry to as-built
One team.

Three stages. Click any to expand the deliverables and BIM requirements at that stage.

Bespoke geometry, custom steel, and specialist facade modelled to fabrication detail. Every connection validated in 3D before design approval. Multi-discipline clash detection at LOD 400 so conflicts surface during design, not during construction.

Key Processes

Complex geometry modelling

Your design team models non-standard forms to fabrication detail. Every connection and panel is validated in 3D before design approval.

Multi-discipline clash detection

Structure, facade, MEP, and specialist systems coordinated simultaneously. Clashes resolve during design, not during construction.

Fabrication package prep

Shop drawings and installation data generated directly from the coordinated model. Fabricators receive error-free specifications.

Deliverables

  • Complex geometry models validated to fabrication tolerances
  • Fabrication-ready structural models with connection details
  • Facade panel coordination models with panel geometry
  • Multi-discipline clash detection reports confirming conflicts resolved
  • GA and tender drawings derived from coordinated model

BIM Requirements

BEP with fabrication protocols

Execution plan includes tolerance standards, material-specific modelling rules, and fabricator coordination gates for every bespoke element.

CDE for specialist trades

File structure accounts for facade contractors, structural steel fabricators, and specialist MEP, each with distinct access and review gates.

LOD by manufacture stage

Level of detail mapped to design development, shop drawing approval, and factory sign-off, not generic project stages.

Shop drawings, 4D models, and trade packages with tolerances and sequencing constraints embedded. Crane reaches, temporary works, and installation windows validated against the programme before mobilisation. Clashes resolved in the model, not on site.

Key Processes

4D sequence planning

Your construction team validates non-repetitive erection logic against crane reaches and temporary works. You prove the sequence works before you order materials.

Specialist trade packages

Bespoke fabrication, cladding, and structural steel packages issued with tolerances embedded. Fabricators have explicit installation constraints.

Installation validation

Panel geometry and connection details verified against site conditions before manufacture. Costly rework on one-off elements is eliminated.

Deliverables

  • Bespoke fabrication shop drawings tied to coordinated model
  • 4D construction sequence models proving the sequence works
  • Specialist trade packages with installation constraints
  • Installation tolerance verification eliminating rework
  • Temporary works coordination models with access and crane validation

BIM Requirements

Clash Cycle

Weekly federation reviews with issues tracked in BIM Track to closure. Every bespoke connection signed off before fabrication release.

LOD 400 Audit

Custom steel, facade panels and specialist MEP validated against fabrication tolerances. Tolerance breaches flagged against panel manifests.

Synchro Linking

Model objects mapped to programme activities. Steel erection, facade installation and services routing sequenced through complex geometry.

As-built models verified against installed conditions for every bespoke element and custom connection. Asset data linked to fabrication records and specialist installations. Nothing assumed from design intent. EIR sign-off discipline-by-discipline before handover.

Key Processes

Bespoke as-built verification

Models validated against installed conditions for every bespoke element and custom connection. Nothing assumed from design intent.

Fabrication-linked asset data

COBie data with fabrication records, specialist installations, and one-off system data. Your FM team inherits complete asset records.

Custom element handover

Documentation verified against EIR requirements with fabrication records linked to as-built models. Every custom element traceable.

Deliverables

  • As-built models verified against installed conditions including bespoke elements
  • COBie asset data schedules complete for all specialist and one-off systems
  • Specialist system documentation linked to as-built models
  • FM-ready handover documentation with full traceability
  • EIR compliance reports confirming all requirements met

BIM Requirements

COBie Validation

Asset data audited against the EIR information requirement schedule. Specialist systems and one-off installations captured at element level.

IFC Final Drop

IFC 4.0 federation deposited in CDE with EIR sign-off attached. Bespoke geometry preserved through the export.

FM System Handshake

Asset data mapped to client CAFM / EAM schema before transfer. Fabrication records cross-referenced to as-built model objects.

Landmark work

Landmarks we've coordinated

From national museums to destination resorts. Where every connection is custom, every panel is one-off.

View all →