The EIR leaves the building.
Every consultant interprets it differently. Acknowledged, adjusted, or quietly ignored. No one audits compliance during delivery.
Information governance and BIM oversight across your consultant and contractor teams. One point of accountability for EIR compliance, model quality and handover data, so your portfolio runs to the same standard end to end.
Information governance and BIM oversight across all appointed parties. Standards, deliverables and handover data managed from your side, across the full project lifecycle.
We're your Information Manager under ISO 19650. One standard BIM workflow across all parties, governed from your side.
JES doesn't descope your consultants. JES becomes the standard your consultants deliver against, and the production layer that fills the gap when an appointed party can't reach the bar.
4D programme and 5D cost integration. Decisions move from site to model. Programme risk surfaces in the simulation, not the variation register.
AIM at handover, optional live twin. FM-ready data ingested into your CAFM before practical completion. Operations starts working, not rebuilding.
Five things developers actually feel after running with JES as the information governance layer on a live programme.
AIM built to your AIR throughout the project. Not reconstructed after handover.
Asset data lands in your CAFM at exchange. Operations starts working, not data-gathering.
Standard CDE structure, naming convention and exchange protocol issued with every appointment.
Pre-qualified BEPs at award. Vendors productive on day one.
RAG dashboards across all parties, every week.
Every information exchange logged with formal deviation reports. No email threads.
COBie ingestion tested in your CAFM before handover.
Signed AIM compliance certificate at exchange.
Same governance framework across every project.
Standards, templates and exchange protocols compound across the portfolio. The next project starts where the last one left off.
A working set we issue with every developer engagement: the Exchange Information Requirements template, AIR matrix, vendor pre-qualification criteria and handover validation checklist. Adapted for portfolio-led programmes with multiple appointed parties.
Every service sits inside the same delivery system. Same QA gates, same ERP traceability, same ISO 19650 baseline.

Production, coordination and documentation across every discipline. Construction-ready deliverables, on your timeline.
Explore
Asset information models that extend beyond handover. Operational data and FM integration for the building lifecycle.
ExploreAccurate quantities from coordinated BIM models. Cost planning, BOQ development and procurement data you can trust.
Explore
Point cloud processing and as-built modelling for renovation, verification and deviation analysis against design intent.
Explore40+ projects delivered across high-rise, hospitality, infrastructure and mixed-use. Here are a few.
Five-discipline coordination across the resort. Asset data tested before handover.
Read the caseMEP routed inside the museum's feather geometry. Compliance trail from EIR through commissioning.
Read the caseMulti-discipline coordination across seven stations. Asset register handed to operations on Day 1.
Read the caseArchitectural and structural BIM. Audit trail held through three design revisions.
Read the caseTerminal expansion BIM. Framework-level governance across the appointed parties.
Read the caseFive disciplines federated. Information governance across the contractor stack.
Read the caseMEP coordination and landscape modelling. AIM-compliant at handover.
Read the caseOnsite, accountable, one name on the contract. Available in your meetings, your time zone, your site walks.
Scaled to your programme, ramped up and down as packages move. You pay for capacity, not for a bench.
Author-Checker-Approver on every deliverable. EIR, BEP and CDE governed from project setup through handover.

Onsite project management with a 260-person offshore production team behind it. You get the capacity of a large studio without hiring, onboarding or managing it.
How we work
Every model, drawing and data exchange runs through the same quality gate. Author-Checker-Approver on every deliverable, governed to ISO 19650 from setup through handover.
ISO 19650 guideBook 30 minutes. Bring one live project, one governance concern, one handover worry. We'll show you where the audit trail would have caught it.