Case study · Aviation

DWC Airport. Next-generation terminal.

Consultant-side BIM production for Dar Al-Handasah on Dubai World Central's next-generation passenger terminal, terminal-scale coordination at consultant pace.

Client Dar Al-Handasah (lead consultant)
Engagement Consultant-side BIM production
Sector Aviation · Passenger terminal
Disciplines Architecture · Structure · MEP · Baggage · Specialist airport systems
Duration ~30 months
What's in the walkthrough

What you actually get

The walkthrough is the case study. Public sites can only show so much, here's what we send when you request access.

  1. 01

    Project setup.

    Dar Al-Handasah's design brief, terminal programme, and how a consultant-side BIM production scope was structured around a long-span aviation envelope, the conditions we walked into.

  2. 02

    Coordination through phases.

    Long-span roof structure coordinated against zoned MEP, baggage handling routed against passenger flow, and specialist aviation systems interfaced into the federated model, what was hard, what got resolved upstream of issued-for-construction.

  3. 03

    What we shipped.

    Federated discipline models, design-stage drawings, interface registers, baggage and specialist-systems coordination views, and the consultant deliverable rhythm that kept stage gates on time. With sample frames.

  4. 04

    What it produced.

    Quantified outcomes where we have them, interface clashes resolved at design, stages issued on schedule, and the model handed across to the contractor team. Honest numbers.