Trade · Architecture

Designers design. We model.

GA plans, sections, elevations, and detail sheets from schematic through IFC. Coordinated against structure and MEP at every stage gate.

Architecture coordination, GA plans, sections, elevations, and detail sheets coordinated against structure and MEP
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Your architects stay on design. We run production

Production capacity without hiring

Modellers, detailers, and documentation teams scaled from a 250-person studio. No recruitment cycle. No bench risk. Capacity matched to your project load.

Same standard, every engineer

Author-Checker-Approver gates on every drawing set. ERP-tracked progress. Whether it is engineer 3 or engineer 50, documentation quality stays constant.

Single point of accountability

One team from schematic through IFC. No split between your design office and a separate modelling vendor. One point of contact. One responsibility matrix.

260+ BIM professionals
100+ Projects delivered
ISO 19650 Every project, every time

Architecture in production

Six views from live architecture packages, federated models, GA plans, facade sections, detail extracts, 4D phasing, clash visualisations.

Get the architecture drawing pack.

Real architecture drawings from completed projects: general arrangement plans, coordinated floor plans, cladding and joinery details and wall sections. The drawings we actually issue, not a brochure, so you can judge the standard before you brief anyone.

Contents
4 documents · PDF + Revit / Navisworks samples
Drawn from
Completed architecture packages, redacted
Audience
BIM Coordinators · Design Leads · Main Consultants
Architecture drawing pack, floor setting-out shop drawing plan

From schematic to as-built. One team

Three phases. Click any to expand the key processes, deliverables, and BIM requirements at that stage.

Models, plans, sections, and elevations from schematic through IFC. Coordinated against structure and MEP at every stage gate, so your documentation is design-verified before it leaves the office.

Key processes

Model setup from BEP

Grids, levels, worksets, and shared coordinates established from your BEP, so every discipline works from the same baseline.

Federated reviews at each stage

Multi-discipline clash detection at every stage gate, so conflicts are resolved in the model, not on site.

Design freeze protocol

Snapshots, revision tracking, and formal sign-off before stage progression. Nothing moves forward without a locked baseline.

Deliverables

  • Schematic design models (LOD 200)
  • Design development models (LOD 300)
  • GA plans, sections & elevations
  • Detail sheets & wall sections
  • Area & room schedules
  • Tender drawing packages

BIM requirements

Naming Convention

All elements follow project naming standard per BEP. Uniclass 2015 classification applied to every family type.

QA & LOD Verification

LOD 200 at concept, LOD 300 at developed design. Automated QA at Stage 2/3 gates. Geometry, parameters, and clash status verified per element.

Information Exchange

IFC 4.0 exports validated through Solibri before each data drop to the CDE.

LOD 400 models with manufacturer-specific detail. Facade packages, clash resolution, and construction-issue documentation, coordinated across every discipline so nothing gets resolved on site that should have been resolved in the model.

Key processes

Facade package coordination

Curtain walls, cladding, and weatherproofing detailed and clash-resolved, so your envelope package is construction-ready as a single coordinated set.

Bi-weekly clash detection

Architecture versus structure and MEP at 0mm hard, 25-50mm soft tolerance. Every clash categorised, assigned, and tracked to closure.

4D construction sequencing

Model linked to the construction programme for phased handover, so your site team knows exactly what's coming and when.

Deliverables

  • Construction-issue model (LOD 400)
  • Coordinated facade & envelope package
  • Clash detection reports (Navisworks)
  • Finish & door hardware schedules
  • RFI resolution tracking
  • Subcontractor coordination models

BIM requirements

Clash & Coordination

Hard clashes 0mm, soft clashes 25-50mm. Weekly model updates to CDE per coordination schedule. All resolved before release to site.

Data Embedding

Fire ratings, acoustic ratings, thermal performance values, and manufacturer references embedded in every architectural element.

Drawing Extraction

All construction drawings extracted directly from model. No detached 2D drafting. Sheet sets, revisions, and title blocks model-linked.

Verified LOD 500 model with asset tags, COBie data sheets, and FM-ready exports. Your facilities team inherits a model that's accurate, complete, and ready to plug into their CAFM system.

Key processes

As-built verification

Model checked against red-line markups and site surveys, so what's in the model matches what's on the floor.

COBie population

Asset tags, serial numbers, warranty dates, and maintenance intervals embedded per element. Your FM team gets structured data, not a PDF to re-enter.

Model strip-down

Construction-stage detail removed, FM-relevant data retained. The handover model is clean and sized for operations, not a bloated construction file.

Deliverables

  • Verified as-built model (LOD 500)
  • COBie data sheets (UK 2012)
  • FM platform-ready IFC export
  • Asset register & maintenance schedules
  • O&M documentation package
  • Model handover audit report

BIM requirements

Asset Data & COBie

Every asset tagged with unique ID and location code. 100% COBie fields populated. Linked to building management zone and handover dataset.

Spatial Accuracy

As-built model verified within 15mm tolerance against point cloud or total station survey data.

Handover Format

Native Revit model + IFC 4.0 + COBie spreadsheet delivered per employer's information requirements and project BEP.

Virtual Design & Construction

Test design and validate before you build

4D construction sequencing, 5D cost impacts, and design option analysis tied to the coordinated model. Decisions validated before work begins on site. Reduces RFIs, rework, and field surprises.

Watch · Architecture VDC walkthrough
1:00
0:00

4D Scheduling

Model linked to the programme. Visualise the build sequence phase by phase and flag trade access conflicts before mobilisation. Catches coordination issues early.

OutputProgramme-linked sequence animation · conflict report

5D Cost Modelling

Quantities extracted from the model and linked to cost plans. See the budget impact of design changes in real time. Decisions backed by numbers, not intuition.

OutputModel-linked QTO · cost impact report

Design Option Testing

Material and layout variations tested before commitment. Compare cost, programme, and constructability side by side. Reduce value engineering at tender.

OutputOption comparison matrix · recommendation report

Architecture work we've coordinated

Architecture packages from schematic through IFC, across hospitality, residential, civic and commercial. Our architects in the federated set, working alongside structure and MEP.

View all