Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design packages from schematic through construction supervision, produced to your BEP. Your Dubai studio stays on design while we carry production.
Explore Build-sideConstruction BIM from tender through as-built across every trade. Clashes resolved in the model before they cost a day on a Dubai site.
Explore Owner-sideInformation governance across your consultant and contractor teams. Your standards enforced on every plot in the portfolio, not just referenced.
ExploreDubai builds faster than teams can hire. The system keeps up.
Fast-track towers, metro lines and resort programmes don't pause for recruitment. 260+ engineers, one delivery system. The same quality on your first package and your fiftieth, scaled to the pace of a Dubai programme.




























Every service runs through the same QA gates, the same ERP traceability and the same ISO 19650 baseline, an hour from any site in Dubai.

Models, coordination and shop drawings across every discipline, issued to construction tolerance. What reaches a Dubai site has already been built once, in the model.
Explore service
Sequence it in the model before the cranes move. 4D programme and 5D cost analysis catch the delay and the overrun while they are still cheap to fix.
Explore service
We run the CDE, the naming and the exchanges so your EIR and BEP hold on site, not just on file. Your BIM manager governs instead of chasing suppliers.
Explore
An asset model your FM team can run a Dubai tower with from day one. CAFM-ready operational data at handover, not a model that dies at completion.
Explore
Quantities pulled straight from the coordinated model, so BOQs, procurement and variations argue from one number across the whole programme.
Explore
Laser scan to record model: verify what was actually built, catch deviation early and hand over a record that matches the building.
ExploreThe full BIM scope delivered from one delivery floor, so a Dubai programme never waits on a second supplier.
Revit, Civil 3D and Navisworks production across architecture, structure and MEP. One modelling standard on every Dubai package.
Custom Revit families built to your office standard and LOD specification, from joinery profiles to plant-room equipment.
Programme on the model with 4D sequencing, cost with 5D and performance analysis where the project calls for it.
Shop drawings issued to construction tolerance, coordinated against the federated model before they reach the site office.
Point clouds processed into accurate as-built models for renovation, retrofit and record across existing Dubai assets.
Legacy 2D drawings rebuilt as coordinated 3D models, so older Dubai projects inherit a single source of truth.
CAFM-ready asset data structured at handover, so your FM team runs the building from the model on day one.
Model-based quantity take-off aligned to your cost codes. BOQs, procurement and variations argue from one number.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without that gate, packages miss programme, shop drawings clash on site, ISO non-compliance surfaces at audit, and asset data gaps appear at handover. On fast-track Dubai programmes those costs compound weekly. They don't land on JES projects, because every file carries an Author-Checker-Approver trail you can put in front of the client and your PI insurer.
Metro lines, airport terminals, towers and waterfront resorts, coordinated and handed over to ISO 19650. A few from the portfolio.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseDrawings issued to the construction programme from a federated, clash-free model. What lands on a Dubai site has already passed coordination.
Author-Checker-Approver on every file before it leaves JES, with ERP dashboards showing where each deliverable sits. Your team reads status, it doesn't chase it.
ISO 19650 from project setup, not retrofitted at audit. EIR, BEP and CDE in place from day one, so auditors see structure instead of promises.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth, and the distinction matters less than it looks. JES is a BIM services company in Dubai that produces the models, drawings and coordination and governs the standards they run to. We author the BEP, run the CDE and hold the Author-Checker-Approver gate on every file, so you get the production hours and the governance from one accountable team rather than paying a consultancy to advise and a separate shop to draw.
Yes, and for most clients that is exactly the engagement. We embed as a dedicated, outsourced BIM team led by one delivery lead who owns your programme, backed by 260+ engineers an hour from any Dubai site. Capacity scales up when a tower package peaks and back down when it settles, so you carry the output of a full BIM department against fast-track deadlines without a permanent bench on the payroll.
Yes. Our BIM consultants embed inside your delivery rather than reporting from the outside, setting the BEP, the LOD schedule and the CDE structure at the start and holding the work to ISO 19650 from schematic design through to handover. One named lead stays accountable across the programme, so your own BIM manager governs the project instead of chasing suppliers for drawings that were never checked before issue.
Yes. We laser-scan the existing asset, register the survey into a single point cloud, then model it into a coordinated record model that matches what actually stands on the Dubai site rather than what the old drawings claim. That verified model becomes the base every discipline coordinates against, which is what keeps a refurbishment or a fit-out from designing around geometry that moved years ago.
We model architectural, structural and MEP in Revit and coordinate them on one federated model in Navisworks, running regular clash cycles to resolve conflicts before a package reaches a Dubai site. Every discipline is authored, checked and approved against your BEP and issued to construction tolerance. What your contractor builds from has already been reconciled across trades in the model.
Cost follows scope, the disciplines in play, the LOD you need and how long the programme runs, so a fast-track tower carries far more than a single fit-out package. We scope each engagement to the actual work rather than a flat rate. The zero-cost pilot on one package lets you see the output and the QA on a real deliverable before you commit budget to the full programme.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.