Solutions · For Consultants

BIM capacity without the hiring.

BIM production and coordination across all project stages, embedded in your team, governed to your BEP. Your engineers focus on design. We handle everything else.

For Consultants — embedded BIM team across schematic, detail, tender and construction supervision
DARConsultant
AECOMConsultant
ArupConsultant
WA InternationalConsultant
SCDAConsultant
DezigntechnicConsultant
H2RConsultant
Prestige OneDeveloper
AL-FUTTAIMDeveloper
INNOVOMain Contractor
M4Main Contractor
AFEMain Contractor
MNG ESMASMain Contractor
ALEMCOMEP Specialist
VoltasMEP Specialist
ALEC FITOUTJoinery / Fit-out
DEPAJoinery / Fit-out
Al-Tayer StocksJoinery / Fit-out
Abaad Wood IndustriesJoinery / Fit-out
DARConsultant
AECOMConsultant
ArupConsultant
WA InternationalConsultant
SCDAConsultant
DezigntechnicConsultant
H2RConsultant
Prestige OneDeveloper
AL-FUTTAIMDeveloper
INNOVOMain Contractor
M4Main Contractor
AFEMain Contractor
MNG ESMASMain Contractor
ALEMCOMEP Specialist
VoltasMEP Specialist
ALEC FITOUTJoinery / Fit-out
DEPAJoinery / Fit-out
Al-Tayer StocksJoinery / Fit-out
Abaad Wood IndustriesJoinery / Fit-out
The Problem

Your BIM demand is variable. Your headcount isn't

Projects spike. Teams don't.

You need 12 modellers for 6 months. Hiring takes 3. By the time you're resourced, the programme has moved and your senior engineers have already absorbed the pain.

Every new hire resets your baseline.

Different modellers, different standards. Your BIM Manager spends the week checking work and rewriting templates instead of governing information.

Your outsourcing needs managing too.

Most BIM providers add capacity but not structure. You still chase deliverables and sign off everything yourself. The overhead just moves.

How we solve it

From schematic to handover. One team

BIM production for every design stage, so your engineers stay on design and your models stay consistent from concept through construction.

LOD 100–200

Schematic Design.

Massing, spatial coordination and concept models. Test options and set direction inside your CDE from day one. BEP locked before production.

Deliverables

  • Concept massing models (LOD 100 to 200)
  • Multi-discipline spatial coordination
  • Design option studies
  • Client presentation models
  • BEP development (pre-contract)
  • CDE setup & folder structure
LOD 200–350

Detail Design.

Coordinated models and drawing extraction. Full discipline models at LOD 200 to 350. Clashes resolved in the model, not discovered during tender.

Deliverables

  • Design models (LOD 200 to 350)
  • Clash detection and resolution
  • Plans, sections, construction details
  • LOIN framework definitions
LOD 350

Tender & IFC.

Tender-grade packages. IFC deliverables and final coordination. Stage gate sign-off before tender goes out.

Deliverables

  • Tender drawing packages
  • IFC 4.0 validated
  • Clash reports with resolution tracking
  • Stage gate sign-off records
LOD 400–500

Site Supervision.

Site-phase BIM support and as-built documentation. Handover-ready deliverables at practical completion.

Deliverables

  • Construction-phase model updates
  • Site coordination support
  • As-built records
  • Handover-ready deliverables
Quality gate Every phase, every deliverable. ISO 19650-2 · Clause 5.6
Author
Engineer produces
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Checker
Senior reviews against BEP
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Approver
BIM manager signs off
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
What our method gets you

Scale your BIM. Hold your risk

Five things consultants tell us they actually feel after running with JES on a live package.

01 · Cost

Cost avoided.

No permanent headcount added for temporary demand. Peak loads covered, baseline unchanged.

How BIM Resourcing with named engineers. Scale up during tender sprints, scale down after.
02 · Speed

Speed.

IFC deadlines hit without overtime. JES engineers are productive from day one, not day seven.

How Pre-established ACA gates and CDE so onboarding is one hour, not one week.
03 · Risk

Risk reduced.

No onboarding debt. JES engineers already work to ISO 19650 with auditable QA records.

How Every engineer carries a unique ID with QA trail back to project 1.
04 · Quality

Quality.

Every deliverable triple-checked before it leaves. No single-reviewer bottleneck.

How Author-Checker-Approver with signed deviation reports, not a single sign-off.
05 · Predictability

Predictability.

Deliverable dates you can commit to your client.

How MIDP-linked task cards, ERP visibility, fixed weekly cadence for data drops.
By request

The consultant ISO 19650 pack.

A working set we issue to consultant teams running embedded JES capacity: BEP template, LOIN framework, coordination protocol and stage-gate checklist. Aligned to ISO 19650-2 and adapted for design-stage workflow.

Contents
4 documents · PDF + editable XLSX
Aligned
ISO 19650-2 · UK BIM Framework · LOIN
Audience
BIM Managers · Design Directors · Project Directors
Share contact details · Issued within one working day
Jesbim · 01 / 04
BEP · Template & Guide
ISO 19650-2 · pre/post-appointment · v1.2

Work we've delivered

40+ projects delivered across high-rise, hospitality, infrastructure and mixed-use. Here are a few.

View all →

How consultant BIM
actually runs

  • 01

    A UAE PM owns your programme

    Onsite, accountable, one name on the contract. Available in your meetings, your time zone, your studio walks.

  • 02

    A 260-person studio delivers the work

    Scaled to your programme, ramped up and down as packages move. You pay for capacity, not for a bench.

  • 03

    ISO 19650 is baked in, not bolted on

    Author-Checker-Approver on every deliverable. BEP, LOIN and CDE governed from concept through handover.

Get in touch

Got a tender package that needs to land coordinated?

Book 30 minutes. Your live programme, your BEP, the right embedded team.