Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Production and coordination from schematic through construction supervision. Your design team focuses on design.
Explore Build-sideConstruction BIM coordination from tender through as-built handover. Clashes resolved in the model, not on site.
Explore Owner-sideInformation governance and BIM oversight across consultant and contractor teams. Your standards enforced, not just referenced.
ExploreProject teams with built-in QA and coordination, structured to work inside your BEP, your CDE, and your timeline. Full production capacity, without the hiring or the management overhead. Your BIM Manager manages information, not suppliers.
Every service sits inside the same delivery system. Same QA gates, same ERP traceability, same ISO 19650 baseline.
CDE governance, naming conventions, and information exchange. Your EIR and BEP requirements enforced across every project.
Explore
Asset information models that extend beyond handover. Operational data and FM integration for the building lifecycle.
ExploreAccurate quantities from coordinated BIM models. Cost planning, BOQ development and procurement data you can trust.
Explore
Point cloud processing and as-built modelling for renovation, verification and deviation analysis against design intent.
Explore40+ projects delivered across high-rise, hospitality, infrastructure and mixed-use. Here are a few.
MEP and interior coordination across the integrated resort. One federated model, concept to handover.
Read the caseMEP routed inside the museum's feather geometry. Clash-free against the structural curve.
Read the caseMulti-discipline coordination across seven stations. Depot to commissioning.
Read the caseArchitectural and structural BIM delivery. Federation held through three design revisions.
Read the caseNext-generation terminal expansion. MEP and structural coordination, framework engagement.
Read the caseFive disciplines federated into one model. Waterfront mixed-use destination.
Read the caseMEP coordination and landscape modelling. Fast-track residential, repeat engagement.
Read the caseFederated coordination, clash-free models, drawings issued to the construction programme. What lands on site has already passed the model.
Author-Checker-Approver on every file before it leaves JES. ERP dashboards show where every deliverable sits. Your team stops asking for status.
ISO 19650 from day one. EIR, BEP, CDE built in.

UAE-based project managers. 260-person production studio. Your PM stays local, your delivery team scales to match your programme.
How we work
EIR, BEP, CDE and structured information exchange on every project. Not as an add-on. As the baseline. Your auditors see compliance, not promises.
ISO 19650 guide