The walkthrough is the case study. Public sites can only show so much, here's what we send when you request access.
Hyperscale brief, target Tier rating, IT load and PUE targets, redundancy strategy (N+1, 2N), and how the coordination scope was framed around the operator's standards.
How cooling, electrical distribution, fire, BMS and containment were coordinated in dense data halls and plantrooms, cable tray density resolved, redundant paths kept independent, and Tier-compliance verified in 3D before pour.
Federated model, LOD 400 plantrooms, BMS-integrated services model, cable containment shop drawings, clash reports tagged by redundancy path, and the data-hall handover package. With sample frames.
Quantified outcomes where we have them, site clashes avoided, redundancy violations caught pre-pour, programme weeks saved, and commissioning defects avoided. Honest numbers.