Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design production at the volumes a giga-project masterplan generates, modelled to your BEP without expanding your studio in Riyadh or Jeddah.
Explore Build-sideTrade coordination and shop drawing throughput matched to your package count. When the volume triples, the team behind it already exists.
Explore Owner-sideInformation management across large delivery-partner networks. Your EIR enforced consistently from the first consultant to the last subcontractor.
ExploreVision 2030 created more BIM demand than the market can hire for.
Every giga-project needs modellers, coordinators and information managers faster than the labour market can supply them. JES delivers that capacity as a working team: Qiddiya, Rua Al Madinah, Six Senses Red Sea and the Red Sea Marine Life Institute already run through our system. Your project joins it instead of waiting on recruitment.




























Each one runs through the ACA framework, ERP tracking and an ISO 19650 baseline that holds whether the package is a villa cluster or a stadium district.

Coordinated multidiscipline models and drawings produced at giga-project volume, with the same checks on the thousandth file as the first.
Explore service
4D and 5D analysis that lets your programme test its sequence and cost position before committing plant and people to the ground.
Explore service
CDE operation, naming discipline and exchange management across hundreds of model files, so your information plan holds across the supply chain.
Explore
Asset models prepared for operators who will run these destinations for decades. Structured data at handover, aligned to the client's FM platform.
Explore
Quantities drawn from federated models at masterplan scale, giving commercial teams one defensible measurement basis.
Explore
Scan-based record modelling that verifies construction against design across phases, so each stage closes with evidence.
ExploreThe eight disciplines a giga-project consumes, delivered by one team already working at this volume.
High-volume Revit and Navisworks production across disciplines, with consistency controls built for thousand-file programmes.
Component libraries authored once and deployed across phases, keeping a multi-year programme on one standard.
Sequencing, cost and performance simulation for programmes where a week of slip carries through every following package.
Shop drawings detailed and coordinated at the throughput large construction joint ventures require.
Point clouds turned into verified models for phased handovers and progress verification across large sites.
Legacy 2D information rebuilt into coordinated BIM so earlier projects can join current data environments.
FM-ready data structured for destination operators, with asset registers that work from the first day of operations.
Model-based BOQ production at masterplan volume, keeping estimates anchored to coordinated geometry.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Remove the gate and volume becomes the risk: a recurring modelling error multiplies across thousands of files, programme slip compounds at every interface, and audit findings surface at stage gate. JES files carry a named Author-Checker-Approver trail, so quality holds as the file count grows.
Qiddiya packages with Voltas, Rua Al Madinah production, Six Senses Red Sea and the Red Sea Marine Life Institute with Alec Fitout. Selected work below.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseConstruction-ready deliverables issued at the cadence your programme sets, clash-resolved before they leave JES.
Package status visible in ERP dashboards at any hour. Your team in the Kingdom reads progress instead of requesting it.
ISO 19650 implemented from mobilisation, so the information audit at stage gate finds structure, not improvisation.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. JES is a BIM services company in Saudi Arabia that produces the models, drawings and coordination at giga-project volume and governs the standards they run to. We author the BEP, run the CDE and hold the Author-Checker-Approver gate on every file, so you get the production capacity and the information governance from one accountable team rather than a consultancy that advises and a shop that draws separately.
Yes, and at giga-project scale that is the point. We embed as a dedicated, outsourced BIM team under one delivery lead, backed by 260+ engineers, so your project joins a working system instead of waiting on a recruitment cycle the market cannot match. Qiddiya, Rua Al Madinah, Six Senses Red Sea and the Red Sea Marine Life Institute have run through that floor, and capacity scales to the package as the programme moves.
Yes. Our BIM consultants embed in your delivery and hold it to ISO 19650, setting the BEP, LOD schedule and naming standards at the start and checking every file against them before issue. One named lead stays accountable across the programme, so a stadium district and a villa cluster carry the same discipline as your file count climbs into the thousands.
Yes. We laser-scan the works, register the point cloud and model it into a scan-verified record model that reconciles built work to the model at each stage. That keeps the record continuous from early works onward, which matters on a giga-project where phases hand over to each other and every stage has to close with evidence rather than assumption.
We model architectural, structural and MEP in Revit and coordinate them on one federated model at giga-project volume, running regular clash cycles so the same checks land on the thousandth file as the first. Every discipline is authored, checked and approved against your BEP. A recurring error never multiplies unseen across thousands of deliverables.
Cost follows scope, the disciplines involved, the LOD you need and the programme length, so a stadium district carries far more than a villa cluster. We scope each engagement to the actual work rather than a flat giga-project rate. The zero-cost pilot on one package lets you see the volume discipline and QA on a real deliverable before committing.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.