Federated BIM model, mixed-use development

Systematized BIM services in Saudi Arabia.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Vision 2030 created more BIM demand than the market can hire for.

Every giga-project needs modellers, coordinators and information managers faster than the labour market can supply them. JES delivers that capacity as a working team: Qiddiya, Rua Al Madinah, Six Senses Red Sea and the Red Sea Marine Life Institute already run through our system. Your project joins it instead of waiting on recruitment.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Capability at giga-project volume

The eight disciplines a giga-project consumes, delivered by one team already working at this volume.

  • 3D BIM modelling

    High-volume Revit and Navisworks production across disciplines, with consistency controls built for thousand-file programmes.

  • Revit family creation

    Component libraries authored once and deployed across phases, keeping a multi-year programme on one standard.

  • 4D, 5D and 6D simulation

    Sequencing, cost and performance simulation for programmes where a week of slip carries through every following package.

  • Shop drawings & detailing

    Shop drawings detailed and coordinated at the throughput large construction joint ventures require.

  • Scan to BIM

    Point clouds turned into verified models for phased handovers and progress verification across large sites.

  • CAD to BIM conversion

    Legacy 2D information rebuilt into coordinated BIM so earlier projects can join current data environments.

  • BIM for facility management

    FM-ready data structured for destination operators, with asset registers that work from the first day of operations.

  • Quantity take-off & BOQ

    Model-based BOQ production at masterplan volume, keeping estimates anchored to coordinated geometry.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Remove the gate and volume becomes the risk: a recurring modelling error multiplies across thousands of files, programme slip compounds at every interface, and audit findings surface at stage gate. JES files carry a named Author-Checker-Approver trail, so quality holds as the file count grows.

At work across the Kingdom

Qiddiya packages with Voltas, Rua Al Madinah production, Six Senses Red Sea and the Red Sea Marine Life Institute with Alec Fitout. Selected work below.

View all

Common questions about BIM in Saudi Arabia

Both. JES is a BIM services company in Saudi Arabia that produces the models, drawings and coordination at giga-project volume and governs the standards they run to. We author the BEP, run the CDE and hold the Author-Checker-Approver gate on every file, so you get the production capacity and the information governance from one accountable team rather than a consultancy that advises and a shop that draws separately.

Yes, and at giga-project scale that is the point. We embed as a dedicated, outsourced BIM team under one delivery lead, backed by 260+ engineers, so your project joins a working system instead of waiting on a recruitment cycle the market cannot match. Qiddiya, Rua Al Madinah, Six Senses Red Sea and the Red Sea Marine Life Institute have run through that floor, and capacity scales to the package as the programme moves.

Yes. Our BIM consultants embed in your delivery and hold it to ISO 19650, setting the BEP, LOD schedule and naming standards at the start and checking every file against them before issue. One named lead stays accountable across the programme, so a stadium district and a villa cluster carry the same discipline as your file count climbs into the thousands.

Yes. We laser-scan the works, register the point cloud and model it into a scan-verified record model that reconciles built work to the model at each stage. That keeps the record continuous from early works onward, which matters on a giga-project where phases hand over to each other and every stage has to close with evidence rather than assumption.

We model architectural, structural and MEP in Revit and coordinate them on one federated model at giga-project volume, running regular clash cycles so the same checks land on the thousandth file as the first. Every discipline is authored, checked and approved against your BEP. A recurring error never multiplies unseen across thousands of deliverables.

Cost follows scope, the disciplines involved, the LOD you need and the programme length, so a stadium district carries far more than a villa cluster. We scope each engagement to the actual work rather than a flat giga-project rate. The zero-cost pilot on one package lets you see the volume discipline and QA on a real deliverable before committing.