Sphere Abu Dhabi. No flat surfaces.

BIM production on the first Sphere venue outside the United States, a 20,000-capacity landmark on Yas Island where the geometry gives you nothing to set out from.

Client ALEC (main contractor)
Engagement Confidential
Sector Entertainment · Immersive venue
Disciplines Confidential
Duration Confidential

What the walkthrough covers

The walkthrough is the case study. Public sites can only show so much. On the call, we take you through the project properly.

  1. 01

    The project and the brief.

    A spherical venue seating up to 20,000, wrapped in an LED exosphere and sitting on a public plaza between Yas Mall and SeaWorld. What that geometry does to a BIM scope, and the conditions we walked into.

  2. 02

    How coordination ran.

    Every level is a different diameter, so no riser stacks and no repeating grid. We take you through how services were routed against a curved primary structure, how the envelope and its LED support steelwork were held clear of the bowl, and where the interfaces actually bit.

  3. 03

    What we shipped.

    Federated discipline models, shop drawings, interface registers, and the coordination views the site team worked from. With sample frames.

  4. 04

    What it produced.

    Quantified outcomes where we have them, clashes closed before fabrication, packages released on the contractor's programme, and where the model saved a site instruction. Honest numbers, including what took longer than planned.