Topgolf Abu Dhabi. Range, bays, and F&B.

Construction BIM for M4 Contracting on Topgolf Abu Dhabi, a multi-tier driving range with bays, ball-tracking systems, and multi-tenant F&B coordinated through a single federated model.

Client M4 Contracting (main contractor)
Engagement Construction BIM coordination
Sector Entertainment · Sports
Disciplines Architecture · Structure · MEP · Specialist systems · F&B fit-out
Duration ~16 months
What's in the walkthrough

What you actually get

The walkthrough is the case study. Public sites can only show so much, here's what we send when you request access.

  1. 01

    Project setup.

    Brief, programme, and the entertainment-venue constraints we walked into, multi-tier bay geometry, a public-facing soft-opening date, and a main contractor running parallel trade packages on a live site.

  2. 02

    Coordination through phases.

    How we federated structure, MEP, and specialist ball-tracking systems across three tiers of bays, and held the multi-tenant F&B fit-out clear of service routes feeding the range deck above.

  3. 03

    What we shipped.

    Federated models, bay-level shop drawings, clash reports against the ball-tracking and netting trades, F&B tenant coordination views, and the soft-opening readiness package. With sample frames.

  4. 04

    What it produced.

    Quantified outcomes where we have them, bay clashes resolved before the trade arrived, commissioning sequence weeks saved, and a soft-opening punchlist short enough to swing the doors. Honest numbers.