Federated BIM model, mixed-use development

Systematized BIM services in Eindhoven.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

High-tech buildings are services-dense by nature. We coordinate them before fabrication.

Campuses, cleanrooms and advanced-manufacturing facilities pack more systems into less space than almost any other building type. Engineering-grade coordination across structure, MEP and process services from 260+ engineers, checked before anyone commits to installation.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Eight capabilities, buildings and facilities

One team and one QA standard across campus buildings, industrial facilities and infrastructure, so your scope never splits between vendors.

  • 3D BIM modelling

    Revit, Civil 3D and Navisworks production across buildings and facilities, modelled to the tolerances fabrication requires.

  • Revit family creation

    Custom content for high-tech and building work alike, from process and plant equipment to architectural components, built to your LOD specification.

  • 4D, 5D and 6D simulation

    4D construction logic for phased campuses, 5D quantities for services-heavy budgets, and 6D data for facility operations.

  • Shop drawings & detailing

    Shop and fabrication drawings coordinated against the federated model, at the detail your MEP and steelwork contractors install from.

  • Scan to BIM

    Facility scan to BIM: existing production halls, labs and campus buildings converted into accurate as-built models.

  • CAD to BIM conversion

    Legacy 2D archives rebuilt into coordinated models, recovering asset knowledge that lived only on drawings.

  • BIM for facility management

    Asset data structured for facility FM regimes, where downtime costs make information quality an operational metric.

  • Quantity take-off & BOQ

    Quantity take-off from the model for MEP, structure and equipment, traceable from BOQ line to element.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

On services-heavy work the failure modes are expensive by default: fabrication clashes, rework in installed MEP, record models that contradict the asset. On JES projects every file passes its Author-Checker-Approver gate before installation depends on it, and the record travels with the file.

Delivered on services-heavy scopes

Metro, airport and resort infrastructure coordinated to ISO 19650 in the Gulf, services-dense work at the core of the portfolio. Test the method on a zero-cost pilot and run our files through your own checkers.

View all

Common questions about BIM in Eindhoven

Both. JES produces the multidiscipline models and coordination, and governs the standards: BEP, CDE and the Author-Checker-Approver gate on every file, tracked in ERP. On high-tech facility work you get production and governance from one accountable team, not a consultancy that advises alongside a shop that draws.

Yes. We embed as your outsourced BIM team under one delivery lead on campus and cleanroom builds, delivered to ISO 19650, with 260+ engineers behind the work. Capacity scales with the programme rather than a permanent hire, so the services-dense, tolerance-critical work is caught in the model before anyone commits to installation.

Yes. Our BIM consultants embed in your delivery, coordinate structure, MEP and process services to ISO 19650, and hold facility-scale data through the CDE. One named lead stays accountable across the programme, so the clashes that a cleanroom cannot afford surface in review rather than during fit-out.

Yes. We run scan to point cloud to record model on operational facilities, capturing production halls, labs and campus buildings as a verified base. Every discipline coordinates against that record, so a retrofit or expansion in a live high-tech facility designs against what stands rather than the original intention.

Architectural, structural, MEP and process services. We author them in Revit and federate them in Navisworks on regular clash cycles for services-heavy, tolerance-critical work. Every file is authored, checked and approved against the BEP before installation depends on it, where MEP runs and equipment counts leave no room for a late clash.

Cost follows scope, disciplines, the LOD you need and programme length, and on services-heavy scopes MEP runs and equipment counts drive it, so we price each engagement to the work rather than a flat day rate. A cleanroom facility carries more than a standard campus block. Prove the method first on a zero-cost pilot for one package.