Federated BIM model, mixed-use development

Systematized BIM services in Perth.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Remote assets need drawings that match the site. Scan-verified models close the gap.

When the facility sits a four-hour flight from Perth, rework means remobilisation. JES processes point clouds into verified record models and runs production from the same baseline. Decisions made in the office hold on site.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Eight capabilities, capture to asset data

From point cloud to handover dataset, one team covers it, so remote and brownfield projects stop juggling specialist suppliers.

  • 3D BIM modelling

    Revit, Civil 3D and Navisworks production across disciplines, to a single standard from city towers to site facilities.

  • Revit family creation

    Custom Revit families including industrial plant and equipment content, built to your parameters and LOD spec.

  • 4D, 5D and 6D simulation

    4D sequencing, 5D cost and 6D performance data from one coordinated model, decision-grade across the project's life.

  • Shop drawings & detailing

    Construction-tolerance shop drawings coordinated before issue, because remote-site rework is the most expensive kind.

  • Scan to BIM

    Point clouds from terrestrial and mobile capture processed into accurate as-built models, the core capability behind WA's brownfield estate.

  • CAD to BIM conversion

    Decades of legacy 2D drawings rebuilt into coordinated models, recovering a usable record for ageing assets.

  • BIM for facility management

    Asset data structured for operations during delivery, so maintenance systems load real information from day one.

  • Quantity take-off & BOQ

    Quantities generated from the model against your cost codes, keeping estimates honest from feasibility to closeout.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without the gate, distance multiplies every error: uncoordinated drawings reach sites that cost days to revisit, record models drift from reality, and asset data gaps surface years into operation. JES verifies before issue, with an Author-Checker-Approver trail on every file.

Verified in the field

Airports, metro systems and resort programmes in the Gulf, delivered and documented through this same system. A selection below.

View all

Common questions about BIM in Perth

Both. We produce the coordinated models, drawings and federation and we govern the standards behind them: the BEP, the CDE and the Author-Checker-Approver gate on every file. One accountable team owns both, not a consultancy that advises alongside a shop that draws. When rework means remobilisation, a single source of production and governance is what keeps the drawings matching the site.

Yes. We work as a dedicated, outsourced BIM team producing from a single verified baseline, so rework on a facility a four-hour flight away no longer means remobilisation. One delivery lead owns the programme and capacity scales against it, with no permanent bench to carry. Decisions made in the Perth office hold on site because everyone works to the same model.

Yes. Our BIM consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650, with one named lead accountable across the programme. They process point clouds into verified record models and run production from that base, so office decisions hold when the site is a remote industrial facility. The standard stays consistent across distributed teams.

Yes. We process terrestrial and mobile scan capture into a registered point cloud and then an accurate as-built model, the definitive answer to what is actually out there. That verified base is what every discipline coordinates against, which is the core capability behind WA's brownfield estate. Remote assets nobody holds accurate drawings for get a measured record to build from.

Architectural, structural and MEP, authored in Revit and federated in Navisworks on one model. We run regular clash cycles and hold every file through Author-Checker-Approver review against your BEP before issue, to construction tolerance. On services-heavy industrial builds the clashes are resolved in the model before mobilisation to remote sites, where a wasted trip costs days rather than hours.

Cost follows scope, the disciplines involved, the LOD you specify and the programme length, so a remote industrial build carries more than a single commercial fit-out. We scope each engagement to the actual work, not a flat day rate. The lowest-risk way to see it is a zero-cost pilot on one package, where you judge the output and the verification trail first.