Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design production run against your BEP through your off-hours, so documentation deadlines stop competing with design time.
Explore Build-sideCoordination and shop drawings turned around between your working days, with clashes resolved in the model before they reach site.
Explore Owner-sideA single information standard across states and delivery partners, with structured asset data at every handover in the portfolio.
ExploreIssue a package at close of business. Review the coordinated result next morning.
Your close of business is mid-morning in Jebel Ali, so a package issued at 5pm reaches a floor with a full working day ahead of it. 260+ engineers produce, check and return the work before your next morning. No one on your side works a night shift to make that happen.




























Every service clears the same Author-Checker-Approver gates and ERP tracking, timed so output lands inside Australian mornings.

Multidiscipline modelling, federation and drawing production to your LOD specification, issued to construction tolerance for Australian review.
Explore service
4D sequencing and 5D cost analysis on the model, surfacing programme and budget risk while it is still a desktop problem.
Explore service
CDE, naming and exchange governance to ISO 19650, the framework Australian government and institutional clients increasingly call for.
Explore
Asset models with structured operational data, handed over ready for the FM platforms that run Australian portfolios.
Explore
Model-based quantity take-off mapped to your cost plan, so estimating and procurement read from the same coordinated geometry.
Explore
Point clouds processed into verified record models, documenting the built condition across long-lived assets.
ExploreEight capabilities from one team, working through your nights, so scope additions never add a second supplier or a second standard.
Revit, Civil 3D and Navisworks production across all major disciplines, held to one authoring standard per project.
Custom Revit content built to your office standard and parameter framework, growing into a reusable library.
4D programme, 5D cost and 6D performance data linked to the model, answering planner, estimator and operator from one source.
Shop drawings detailed to fabrication tolerance overnight, coordinated against the federation before issue.
Scan data converted into accurate as-built models for refurbishment, extension and asset records.
Existing 2D documentation rebuilt as coordinated 3D models, so legacy assets stop living outside the information environment.
COBie-aligned asset data structured during delivery, giving operations a dataset instead of a document dump.
Quantities extracted from the coordinated model against your measurement standards, one number from estimate to claim.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without the gate, the cycle works against you: an unchecked error waits a full day for correction, coordination debt compounds across packages, and handover data arrives thinner than the EIR asked for. JES closes that loop with three-stage review before issue, evidenced on every file.
Metro systems, airport packages and resort programmes delivered in the Gulf under compressed schedules. A selection from the record.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseCoordinated, clash-checked packages waiting in the CDE at the start of your day, ready for engineering review.
ERP dashboards carry live deliverable status, so the question of where the work is never has to cross a time zone.
ISO 19650 implemented at project setup, with EIR, BEP and CDE structure agreed before production starts.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, federation and drawings and we govern the standards behind them: the BEP, the CDE and the Author-Checker-Approver gate on every file. One accountable team owns both, not a consultancy that advises alongside a shop that draws. You get coordinated output and the rulebook it was built against from a single source.
Yes. You issue a package at 5pm and it reaches a floor with a full working day ahead, where 260+ engineers produce, check and return it before your next morning. One delivery lead owns the programme, and capacity scales up or down against the work. Nobody on your side works a night shift to keep the model moving.
Yes. Our BIM consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650, with one named lead accountable across the programme. They produce and check the packages through your off-hours and return them before your morning review. Your standards govern how it is done, not ours.
Yes. We process laser scans into a registered point cloud and then a coordinated record model that matches what actually stands on site. That verified base becomes the reference every discipline coordinates against, so refurbishment, extension and asset-record work starts from measured reality. It suits Australia's long-lived assets, where accurate existing conditions are often the missing piece.
Architectural, structural and MEP, authored in Revit and federated in Navisworks on one model. We run regular clash cycles and hold every file through Author-Checker-Approver review against your BEP before issue, to construction tolerance for Australian mornings. You receive a coordinated federation with clashes resolved in the model, not a set of drawings that collide on site.
Cost follows scope, the disciplines involved, the LOD you specify and the programme length, so a metro package carries more than a single resort block. We scope each engagement to the actual work rather than a flat day rate. The clearest way to test it is a zero-cost pilot on one package, where you see the output and the QA before committing.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.