Federated BIM model, mixed-use development

Systematized BIM services in Australia.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Issue a package at close of business. Review the coordinated result next morning.

Your close of business is mid-morning in Jebel Ali, so a package issued at 5pm reaches a floor with a full working day ahead of it. 260+ engineers produce, check and return the work before your next morning. No one on your side works a night shift to make that happen.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

The complete scope, one offshore floor

Eight capabilities from one team, working through your nights, so scope additions never add a second supplier or a second standard.

  • 3D BIM modelling

    Revit, Civil 3D and Navisworks production across all major disciplines, held to one authoring standard per project.

  • Revit family creation

    Custom Revit content built to your office standard and parameter framework, growing into a reusable library.

  • 4D, 5D and 6D simulation

    4D programme, 5D cost and 6D performance data linked to the model, answering planner, estimator and operator from one source.

  • Shop drawings & detailing

    Shop drawings detailed to fabrication tolerance overnight, coordinated against the federation before issue.

  • Scan to BIM

    Scan data converted into accurate as-built models for refurbishment, extension and asset records.

  • CAD to BIM conversion

    Existing 2D documentation rebuilt as coordinated 3D models, so legacy assets stop living outside the information environment.

  • BIM for facility management

    COBie-aligned asset data structured during delivery, giving operations a dataset instead of a document dump.

  • Quantity take-off & BOQ

    Quantities extracted from the coordinated model against your measurement standards, one number from estimate to claim.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without the gate, the cycle works against you: an unchecked error waits a full day for correction, coordination debt compounds across packages, and handover data arrives thinner than the EIR asked for. JES closes that loop with three-stage review before issue, evidenced on every file.

Proven on Gulf programmes

Metro systems, airport packages and resort programmes delivered in the Gulf under compressed schedules. A selection from the record.

View all

Common questions about BIM in Australia

Both. We produce the models, federation and drawings and we govern the standards behind them: the BEP, the CDE and the Author-Checker-Approver gate on every file. One accountable team owns both, not a consultancy that advises alongside a shop that draws. You get coordinated output and the rulebook it was built against from a single source.

Yes. You issue a package at 5pm and it reaches a floor with a full working day ahead, where 260+ engineers produce, check and return it before your next morning. One delivery lead owns the programme, and capacity scales up or down against the work. Nobody on your side works a night shift to keep the model moving.

Yes. Our BIM consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650, with one named lead accountable across the programme. They produce and check the packages through your off-hours and return them before your morning review. Your standards govern how it is done, not ours.

Yes. We process laser scans into a registered point cloud and then a coordinated record model that matches what actually stands on site. That verified base becomes the reference every discipline coordinates against, so refurbishment, extension and asset-record work starts from measured reality. It suits Australia's long-lived assets, where accurate existing conditions are often the missing piece.

Architectural, structural and MEP, authored in Revit and federated in Navisworks on one model. We run regular clash cycles and hold every file through Author-Checker-Approver review against your BEP before issue, to construction tolerance for Australian mornings. You receive a coordinated federation with clashes resolved in the model, not a set of drawings that collide on site.

Cost follows scope, the disciplines involved, the LOD you specify and the programme length, so a metro package carries more than a single resort block. We scope each engagement to the actual work rather than a flat day rate. The clearest way to test it is a zero-cost pilot on one package, where you see the output and the QA before committing.