Federated BIM model, mixed-use development

Systematized BIM services in Melbourne.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Documentation volume pulls designers off design. JES carries the production load.

Health, education and rail projects generate drawing sets at a volume few studios staff for. JES absorbs that volume overnight while your designers keep their design hours. Your office standards and your BEP stay in charge of how the work is done.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Every capability, configured to your templates

Eight services from one floor, set up around your conventions instead of forcing ours on you.

  • 3D BIM modelling

    Revit production across architecture, structure and MEP with Navisworks federation, matched to your graphic and data standards.

  • Revit family creation

    Custom Revit families built into your library conventions, from architectural components to mechanical plant.

  • 4D, 5D and 6D simulation

    4D sequences for staging, 5D for cost and 6D for performance, generated from the same coordinated model.

  • Shop drawings & detailing

    Shop drawings at construction tolerance, checked against the federation before fabricators and site offices receive them.

  • Scan to BIM

    Point-cloud surveys modelled into accurate existing-condition records for Melbourne's refurbishment workload.

  • CAD to BIM conversion

    Legacy drawing sets converted to coordinated 3D models, so established campuses and estates gain a live information base.

  • BIM for facility management

    Operational data structured through the project and delivered CAFM-ready, closing the gap between completion and operation.

  • Quantity take-off & BOQ

    Model-derived quantities aligned to your measurement conventions, holding one number across the commercial lifecycle.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without the gate, deadline pressure shows in the drawings: documentation quality slips at issue, coordination problems surface in commissioning, and the operator inherits a model nobody maintained. Every JES file carries its Author-Checker-Approver history, so the standard is demonstrated, not asserted.

Proven on museum and metro work

Cultural landmarks, terminals and metro packages delivered in the Gulf through this production system. A selection follows.

View all

Common questions about BIM in Melbourne

Both. We produce the models and documentation and we govern the standards behind them: the BEP, the CDE and the Author-Checker-Approver gate on every file. One accountable team owns both, not a consultancy that advises beside a shop that draws. Your office standards and your BEP stay in charge of how the work is done, whoever holds the pen.

Yes. We work as a dedicated, outsourced BIM team that absorbs drawing volume overnight, so health, education and rail sets no longer pull your designers off design. One delivery lead owns the programme and capacity scales against it, with no permanent hire to carry. Your designers keep their design hours while the production load runs on our floor.

Yes. Our BIM consultants embed in your delivery, work to your office standards and your BEP and hold everything to ISO 19650, with one named lead accountable across the programme. On hospital and rail work, where sequencing errors are measured in months, they carry the documentation weight to your rules. The standard stays yours; the production capacity is ours.

Yes. We process laser scans into a registered point cloud and then an existing-condition record model that matches what actually stands. That verified base is what every discipline coordinates against, which serves Melbourne's refurbishment workload where accurate as-built records are usually missing. You get record models that support closeout and the next intervention alike, from one reliable reference.

Architectural, structural and MEP, authored in Revit and federated in Navisworks on one model. We run regular clash cycles and hold every file through Author-Checker-Approver review against your BEP before issue, at the LOD major public projects specify. On complex health and rail builds the clashes are resolved in the federation before site teams inherit them, not discovered in commissioning.

Cost follows scope, the disciplines involved, the LOD you specify and the programme length, so a rail package carries more than a single education block. We scope each engagement to the actual work rather than a flat day rate. The clearest test is a zero-cost pilot on one package, where you see the documentation quality and the QA gate before committing further.