Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Documentation and model production to your office standard, absorbing the volume of major health and education jobs while design stays in-house.
Explore Build-sideCoordination, services modelling and shop drawings for complex builds, clash-resolved in the federation before site teams inherit the problem.
Explore Owner-sideConsistent information delivery across projects and partners, with asset data structured for operations on every handover.
ExploreDocumentation volume pulls designers off design. JES carries the production load.
Health, education and rail projects generate drawing sets at a volume few studios staff for. JES absorbs that volume overnight while your designers keep their design hours. Your office standards and your BEP stay in charge of how the work is done.




























Production, analysis and governance all pass the same QA gates and ERP audit trail, shaped by your BEP rather than our habits.

Full-discipline modelling and documentation at the LOD major public projects specify, issued ready for review on Melbourne mornings.
Explore service
4D staging and 5D cost analysis in the model, valuable on hospital and rail work where sequencing mistakes are measured in months.
Explore service
ISO 19650 information management across CDE, naming and exchanges, keeping consultant teams and builders on one structure.
Explore
Asset models built for operators of long-life public buildings, with structured data delivered at handover, not reconstructed later.
Explore
Quantity extraction from the coordinated model, mapped to your cost plan so commercial decisions trace back to geometry.
Explore
Scan-to-BIM record modelling that verifies built work against documentation, for closeout and for the next intervention.
ExploreEight services from one floor, set up around your conventions instead of forcing ours on you.
Revit production across architecture, structure and MEP with Navisworks federation, matched to your graphic and data standards.
Custom Revit families built into your library conventions, from architectural components to mechanical plant.
4D sequences for staging, 5D for cost and 6D for performance, generated from the same coordinated model.
Shop drawings at construction tolerance, checked against the federation before fabricators and site offices receive them.
Point-cloud surveys modelled into accurate existing-condition records for Melbourne's refurbishment workload.
Legacy drawing sets converted to coordinated 3D models, so established campuses and estates gain a live information base.
Operational data structured through the project and delivered CAFM-ready, closing the gap between completion and operation.
Model-derived quantities aligned to your measurement conventions, holding one number across the commercial lifecycle.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without the gate, deadline pressure shows in the drawings: documentation quality slips at issue, coordination problems surface in commissioning, and the operator inherits a model nobody maintained. Every JES file carries its Author-Checker-Approver history, so the standard is demonstrated, not asserted.
Cultural landmarks, terminals and metro packages delivered in the Gulf through this production system. A selection follows.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseDrawings and models issue from a coordinated federation, so design review stays a design activity.
ERP dashboards track every deliverable from author to approval, readable from Melbourne whenever you need them.
ISO 19650 from day one of the appointment, so information management is part of delivery rather than a compliance scramble.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models and documentation and we govern the standards behind them: the BEP, the CDE and the Author-Checker-Approver gate on every file. One accountable team owns both, not a consultancy that advises beside a shop that draws. Your office standards and your BEP stay in charge of how the work is done, whoever holds the pen.
Yes. We work as a dedicated, outsourced BIM team that absorbs drawing volume overnight, so health, education and rail sets no longer pull your designers off design. One delivery lead owns the programme and capacity scales against it, with no permanent hire to carry. Your designers keep their design hours while the production load runs on our floor.
Yes. Our BIM consultants embed in your delivery, work to your office standards and your BEP and hold everything to ISO 19650, with one named lead accountable across the programme. On hospital and rail work, where sequencing errors are measured in months, they carry the documentation weight to your rules. The standard stays yours; the production capacity is ours.
Yes. We process laser scans into a registered point cloud and then an existing-condition record model that matches what actually stands. That verified base is what every discipline coordinates against, which serves Melbourne's refurbishment workload where accurate as-built records are usually missing. You get record models that support closeout and the next intervention alike, from one reliable reference.
Architectural, structural and MEP, authored in Revit and federated in Navisworks on one model. We run regular clash cycles and hold every file through Author-Checker-Approver review against your BEP before issue, at the LOD major public projects specify. On complex health and rail builds the clashes are resolved in the federation before site teams inherit them, not discovered in commissioning.
Cost follows scope, the disciplines involved, the LOD you specify and the programme length, so a rail package carries more than a single education block. We scope each engagement to the actual work rather than a flat day rate. The clearest test is a zero-cost pilot on one package, where you see the documentation quality and the QA gate before committing further.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.