Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design development through construction documents, produced overnight to your office standard. Your architects and engineers keep the design decisions; the production volume moves to our floor.
Explore Build-sideConstruction modelling, multi-trade coordination and shop drawings across MEP, structure and architecture. Clashes settle in the model before they reach an American jobsite where every lost day is expensive.
Explore Owner-sideOne information standard enforced across every consultant and contractor on your portfolio. Asset data arrives structured at handover instead of being reconstructed afterwards.
ExploreUS firms compete for the same BIM hires. JES delivers the team instead.
A senior Revit modeller in a major US market carries a six-figure cost, and turnover resets the investment every few years. 260+ engineers working your night shift. Issue markups at the end of your day and a coordinated model is waiting the next morning, with nothing added to your payroll.




























Every service passes the same Author-Checker-Approver gates and the same ERP tracking, so a US programme gets one standard across every package.

Multidiscipline Revit production, federation and clash resolution issued to construction tolerance. Documents reach your team already coordinated, not waiting on a redline cycle.
Explore service
4D sequencing and 5D cost analysis run on the live model, so schedule risk and cost drift surface in planning rather than in the field.
Explore service
CDE setup, naming conventions and exchange workflows run to ISO 19650 discipline, so your project information plan holds across every supplier on the job.
Explore
Asset models structured for operations from day one, with the equipment data your facilities team needs already attached when the keys change hands.
Explore
Quantities taken straight off the coordinated model and mapped to your cost codes, so estimating, procurement and change orders read from one number.
Explore
Scan-verified record models that document what was actually installed, so closeout is a checked deliverable instead of a negotiation.
ExploreEight capabilities on one floor, so a US project never has to coordinate between three offshore vendors.
Revit-native production across architecture, structure and MEP, run to one modelling standard whether the package is a clinic or a terminal.
Custom Revit families to your office template and LOD requirement, from casework profiles to air-handling units.
4D schedule simulation, 5D cost loading and 6D performance data where the contract calls for it.
Shop drawings coordinated against the federated model before issue, so the field installs from sheets that already agree with each other.
Point clouds turned into accurate as-built models for renovation and adaptive-reuse work on existing US building stock.
Legacy 2D sets rebuilt as coordinated 3D models, giving older buildings a single source of truth before the next phase.
COBie and CAFM-ready asset data structured at handover, so operations starts with the model instead of a box of PDFs.
Model-based take-offs aligned to your cost structure, keeping estimates, bids and variations on one set of quantities.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Skip that gate and construction documents slip, trades clash in the field, RFI counts climb and closeout data arrives incomplete. On a US programme those costs surface as change orders and schedule claims. They don't surface on JES packages, because every file carries an Author-Checker-Approver record you can hand to the owner.
Metro systems, airport terminals, museums and resort towers across the Gulf, delivered to ISO 19650 and handed over with the data intact. The same system now serves US teams.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseSheets issued against the construction schedule from a federated, clash-checked model. Your team reviews finished work instead of producing it.
Author-Checker-Approver sign-off on every file, with ERP dashboards showing exactly where each deliverable stands. Status is read, never chased.
ISO 19650 structure from project setup: EIR, BEP and CDE in place before modelling starts, so the audit trail builds itself.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and clash resolution, and we govern the BEP, CDE and the Author-Checker-Approver gate on the same programme. One accountable delivery lead owns both sides, so you are not hiring a consultancy to advise and a shop to draw. A US team gets one standard across every package.
Yes. A named delivery lead runs your work as an outsourced BIM team on the night shift, backed by 260+ engineers who pick up your end-of-day markups. A coordinated model is waiting the next morning, and capacity scales with the backlog. A six-figure senior modeller's cost no longer resets with every departure.
Yes. Our BIM consultants embed in your delivery, author the BEP and hold the work to ISO 19650 and your LOD schedule. One named lead stays accountable across the programme, with nothing added to your payroll. You keep the design decisions while the production volume and the governance move to our floor.
Yes. We run laser scan to registered point cloud to a coordinated record model that matches what actually stands, for the renovation and adaptive-reuse work that fills the US existing-stock pipeline. Every discipline then coordinates against that verified base rather than against assumed conditions, so refurbishment starts from fact, not guesswork.
Architectural, structural and MEP, authored in Revit and federated in Navisworks on one model, with regular clash cycles. Every file passes the Author-Checker-Approver gate against the BEP before it issues to construction tolerance. Clashes settle in the model, not on an American jobsite where each lost day bills expensively.
Cost follows scope, disciplines, the LOD you set and programme length, so we price the actual work rather than a flat day rate. A resort tower carries far more than a single fit-out. The clearest way to see the output and QA is a zero-cost pilot on one package before you commit.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.