Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Production for entertainment, hospitality and mixed-use packages, built on your standards while your team stays on design and agency coordination.
Explore Build-sideTrade coordination and shop drawings sequenced to your schedule, with clashes resolved in the model before they reach a Los Angeles site.
Explore Owner-sideConsistent information standards across your consultants, so every asset from hotel to studio lot hands over with usable operational data.
ExploreLA programmes demand documentation that survives review. JES checks every file before issue.
Entertainment campuses, hotels and a growing transit programme all demand drawing sets that stand up to rigorous structural review. Every JES sheet is checked and approved before it leaves the floor, and the Pacific time gap means work issued tonight is coordinated by tomorrow's stand-up.




























Each service runs the same QA gates, ERP traceability and ISO 19650 baseline, so accountability never blurs between suppliers.

Architecture, structure and MEP modelled, federated and issued to construction tolerance, with the documentation rigour demanding jurisdictions expect.
Explore service
4D sequencing and 5D cost analysis on the live model, so phasing and budget risk surface in preconstruction rather than in the field.
Explore service
CDE setup, naming and exchange management to ISO 19650, holding one information standard across a long consultant list.
Explore
Asset models structured for operators: hotels and campuses hand over with equipment data their FM teams can run on immediately.
Explore
Quantities from the coordinated model tied to your cost structure, so estimates, buyout and change orders share one source.
Explore
Laser scan to record model for existing buildings and completed work, catching deviation early and keeping the record accurate.
ExploreThe complete BIM scope from a single supplier, so an LA programme never loses a week to a vendor interface.
Revit production across disciplines, one modelling standard from hotel towers to maintenance facilities.
Custom Revit families to your template and LOD spec, from custom joinery to rooftop plant.
4D phasing and 5D cost on the model, with performance simulation where the project demands it.
Shop drawings coordinated against the federated model and issued to fabrication tolerance, so installation crews build once.
Point clouds processed into trustworthy as-builts for the retrofit and seismic-upgrade work older LA stock requires.
Legacy 2D drawings rebuilt as coordinated models, so existing assets enter their next phase with a single source of truth.
CAFM-ready asset data structured at handover, so operations teams inherit a working model, not an archive.
Model-based quantity take-off mapped to your cost codes, holding one number across estimating and change management.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without that gate, review cycles stretch, resubmittals stack up, field clashes eat the schedule and the closeout set diverges from the building. On an LA programme those failures cost programme time as well as fees. They stay off JES work because every file carries its Author-Checker-Approver record.
Entertainment and hospitality work including Topgolf Abu Dhabi, alongside metro MEP packages and resort towers across the Gulf. All to ISO 19650.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseSheets issued from a federated, clash-checked model against your programme, ready for review rather than rework.
Author-Checker-Approver discipline on every deliverable, with ERP dashboards in place of weekly status calls.
ISO 19650 structure from day one, so the information trail is built into the job instead of reconstructed for the audit.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models and drawing sets, and we govern the BEP, CDE and the Author-Checker-Approver gate on one programme. A single delivery lead owns both, so you are not hiring a consultancy to advise and a shop to draw. Accountability never blurs between suppliers, and one ISO 19650 standard holds across every package.
Yes. A named lead runs your work as an outsourced BIM team across the Pacific time gap, backed by 260+ engineers who pick up your evening markups. Work issued tonight is coordinated by tomorrow's stand-up, and capacity scales with the programme, so an entertainment-campus schedule keeps moving while your office is closed.
Yes. Our BIM consultants embed in your delivery, author the BEP and hold the work to ISO 19650. Every sheet is checked and approved before it leaves the floor, ready for the rigorous structural review demanding jurisdictions expect. One named lead stays accountable across the programme, so review cycles stop stretching into resubmittals.
Yes. We run laser scan to registered point cloud to a coordinated record model for the retrofit and seismic-upgrade work older LA stock requires. Every discipline coordinates against that verified base, so upgrade work starts from what actually stands rather than from drawings that no longer match the building.
Architectural, structural and MEP, authored in Revit and federated in Navisworks with regular clash cycles. We coordinate drawing sets for entertainment-campus and hotel work that must stand up to rigorous structural review, checked and approved against the BEP. Clashes resolve in the model before they reach a Los Angeles site.
Cost follows scope, disciplines, the LOD you set and programme length, so we scope each engagement to the work rather than a flat day rate. An entertainment campus carries far more than a single hotel. A zero-cost pilot on one package is the risk-free way to see the output and QA first.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.