Federated BIM model, mixed-use development

Systematized BIM services in Los Angeles.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

LA programmes demand documentation that survives review. JES checks every file before issue.

Entertainment campuses, hotels and a growing transit programme all demand drawing sets that stand up to rigorous structural review. Every JES sheet is checked and approved before it leaves the floor, and the Pacific time gap means work issued tonight is coordinated by tomorrow's stand-up.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Eight capabilities, one accountable team

The complete BIM scope from a single supplier, so an LA programme never loses a week to a vendor interface.

  • 3D BIM modelling

    Revit production across disciplines, one modelling standard from hotel towers to maintenance facilities.

  • Revit family creation

    Custom Revit families to your template and LOD spec, from custom joinery to rooftop plant.

  • 4D, 5D and 6D simulation

    4D phasing and 5D cost on the model, with performance simulation where the project demands it.

  • Shop drawings & detailing

    Shop drawings coordinated against the federated model and issued to fabrication tolerance, so installation crews build once.

  • Scan to BIM

    Point clouds processed into trustworthy as-builts for the retrofit and seismic-upgrade work older LA stock requires.

  • CAD to BIM conversion

    Legacy 2D drawings rebuilt as coordinated models, so existing assets enter their next phase with a single source of truth.

  • BIM for facility management

    CAFM-ready asset data structured at handover, so operations teams inherit a working model, not an archive.

  • Quantity take-off & BOQ

    Model-based quantity take-off mapped to your cost codes, holding one number across estimating and change management.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without that gate, review cycles stretch, resubmittals stack up, field clashes eat the schedule and the closeout set diverges from the building. On an LA programme those failures cost programme time as well as fees. They stay off JES work because every file carries its Author-Checker-Approver record.

Delivered from resorts to metro lines

Entertainment and hospitality work including Topgolf Abu Dhabi, alongside metro MEP packages and resort towers across the Gulf. All to ISO 19650.

View all

Common questions about BIM in Los Angeles

Both. We produce the models and drawing sets, and we govern the BEP, CDE and the Author-Checker-Approver gate on one programme. A single delivery lead owns both, so you are not hiring a consultancy to advise and a shop to draw. Accountability never blurs between suppliers, and one ISO 19650 standard holds across every package.

Yes. A named lead runs your work as an outsourced BIM team across the Pacific time gap, backed by 260+ engineers who pick up your evening markups. Work issued tonight is coordinated by tomorrow's stand-up, and capacity scales with the programme, so an entertainment-campus schedule keeps moving while your office is closed.

Yes. Our BIM consultants embed in your delivery, author the BEP and hold the work to ISO 19650. Every sheet is checked and approved before it leaves the floor, ready for the rigorous structural review demanding jurisdictions expect. One named lead stays accountable across the programme, so review cycles stop stretching into resubmittals.

Yes. We run laser scan to registered point cloud to a coordinated record model for the retrofit and seismic-upgrade work older LA stock requires. Every discipline coordinates against that verified base, so upgrade work starts from what actually stands rather than from drawings that no longer match the building.

Architectural, structural and MEP, authored in Revit and federated in Navisworks with regular clash cycles. We coordinate drawing sets for entertainment-campus and hotel work that must stand up to rigorous structural review, checked and approved against the BEP. Clashes resolve in the model before they reach a Los Angeles site.

Cost follows scope, disciplines, the LOD you set and programme length, so we scope each engagement to the work rather than a flat day rate. An entertainment campus carries far more than a single hotel. A zero-cost pilot on one package is the risk-free way to see the output and QA first.