Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Tower packages from design development through construction documents, produced on your templates while your architects stay on design and approvals.
Explore Build-sideConstruction modelling, trade coordination and shop drawings for high-rise sites, resolved in the model before forming tops out around the risers.
Explore Owner-sideOne information standard across a multi-tower portfolio, so handover data reads the same on the tenth project as the first.
ExploreToronto's tower pipeline has outgrown consultant capacity. JES carries the overflow.
Residential towers are stacking up faster than studios can staff them, and every practice is recruiting from the same pool. JES adds 260+ engineers with no recruitment on your side. Issue markups at the end of your day; the coordinated package is waiting when the office opens.




























Every service shares the same QA gates, ERP traceability and ISO 19650 baseline, so adding scope never means adding risk.

Multidiscipline tower modelling federated and clash-checked, with documents issued to construction tolerance against your milestone dates.
Explore service
4D sequencing for floor cycles and crane logic, 5D cost analysis that catches drift before it reaches the lender's report.
Explore service
CDE, naming and exchange management to ISO 19650, holding one structure across every consultant on a crowded project.
Explore
Asset models for towers that will be operated for decades: structured data at handover, ready for the condo board's or operator's FM system.
Explore
Quantities pulled from the coordinated model and mapped to your cost plan, so progress draws and change orders share one number.
Explore
Scan-verified record models that document what was built, floor by floor, so closeout records keep pace with construction.
ExploreEight services from one floor, so a multi-tower pipeline runs on one standard instead of five subcontracts.
Revit production across architecture, structure and MEP with one modelling standard from parking levels to penthouse plant.
Custom Revit families to your library standard, from unit kitchens to rooftop mechanical equipment.
4D floor-cycle sequencing and 5D cost loading, with performance data where the project calls for it.
Shop drawings coordinated against the federated model before issue, matched to the repetition of high-rise trades.
Point clouds processed into accurate as-builts for retrofit and recladding work across existing Toronto stock.
2D archives rebuilt as coordinated models, so older buildings enter redevelopment with a single source of truth.
CAFM-ready handover data structured to COBie, so building operators start from the model, not from boxes.
Model-based take-offs aligned to your cost codes, keeping the budget conversation on one set of quantities.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Unchecked, packages miss milestone dates, risers clash after forming, and the record set never catches up to the building. On a Toronto tower those failures ripple through presales commitments and financing covenants. They stay off JES projects because nothing issues unreviewed.
Residential and resort towers for developers including Emaar, metro packages and museum structures across the Gulf, all delivered to ISO 19650.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseDrawings issued from a federated, clash-free model to your construction schedule, so the site builds from coordinated sheets.
Author-Checker-Approver on every file with ERP dashboards showing live status. Your PM reads progress instead of phoning for it.
ISO 19650 from setup, with EIR, BEP and CDE in place before modelling starts.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the tower models and drawings, and we govern the BEP, CDE and the Author-Checker-Approver gate on one programme. A single delivery lead owns both, so adding scope never means adding a consultancy to advise and a shop to draw. One ISO 19650 standard holds across every package on a crowded project.
Yes. A named lead runs your work as an outsourced BIM team you brief with end-of-day markups, backed by 260+ engineers and no recruitment on your side. The coordinated package is waiting when the office opens, and capacity scales with the pipeline, so recruiting from the same pool as every practice is no longer the constraint.
Yes. Our BIM consultants embed in your delivery, author the BEP and LOD and hold the work to ISO 19650. One named lead stays accountable across the programme, returning the coordinated package before the office opens. You get production volume and governance from the same team as the tower pipeline builds.
Yes. We run laser scan to registered point cloud to a coordinated record model for the retrofit and recladding work across existing Toronto stock. Every discipline coordinates against that verified base, floor by floor, so closeout records keep pace with construction rather than lagging years behind the building.
Architectural, structural and MEP, authored in Revit and federated in Navisworks with regular clash cycles. We coordinate high-rise sites, checked and approved against the BEP before issue. Risers settle in the model before forming tops out around them, so packages hold their milestone dates and presales commitments.
Cost follows scope, disciplines, the LOD you set and programme length, so we scope each engagement to the work rather than a flat day rate. A residential tower carries far more than a single fit-out. A zero-cost pilot on one package is the risk-free way to see the output and QA first.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.