Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design-stage production and coordination support, so Midlands practices hold their fee margins while carrying infrastructure-era workloads.
Explore Build-sideMulti-trade coordination, construction modelling and shop drawing throughput for contractors, resolved in the federation before steel is cut.
Explore Owner-sideConsistent information requirements enforced across your delivery chain, with asset data arriving structured at handover rather than salvaged from it.
ExploreThe Midlands' biggest programmes hire first. Your projects don't have to wait.
When a region's infrastructure programmes recruit at scale, every firm downstream inherits the shortage. A delivered team takes your packages out of that queue. They run on a stable offshore floor, to your BEP, with the same engineers from the first month to the last.




























BIM, VDC, information management and the rest all clear the same Author-Checker-Approver review and carry the same ERP audit trail.

Discipline modelling, federation and drawing production to your LOD specification, issued in a state a Birmingham site can build from.
Explore service
4D sequences that pressure-test the construction programme and 5D quantities that price the model, before either becomes a commitment.
Explore service
EIR, BEP and CDE administration to ISO 19650-2, the governance layer infrastructure clients now expect their whole supply chain to evidence.
Explore
Digital asset models with operational data structured through delivery, built for owners who will run the building for decades.
Explore
Take-off from the coordinated model aligned to your cost codes, one quantity set from tender through final account.
Explore
Scan-verified record models that capture the built condition, closing the gap between design intent and what stands on site.
ExploreEverything from families to FM data delivered by one team, so scope growth never adds another interface to manage.
Production in Revit, Civil 3D and Navisworks spanning architecture, structure and MEP, held to a single authoring standard.
Families built to your office template, parameter set and LOD requirement, ready for reuse across the portfolio.
4D for the programme, 5D for the money, 6D where the employer's requirements ask for it, all driven from one model.
Shop drawings at construction tolerance, coordinated in the federation before fabrication or the site office sees them.
Existing structures scanned and rebuilt as accurate models, supporting the Midlands' retrofit and adaptive-reuse work.
Decades of 2D archives translated into coordinated models, so legacy assets join the current information environment.
Asset data assembled to COBie as the project runs, handing operations a working dataset from the start.
Quantity take-off generated from the model against your measurement conventions, from early estimates to final account.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without the gate, infrastructure-scale work compounds its errors: coordination debt builds package by package, claims grow out of drawing errors, and information audits arrive before the evidence does. JES files carry their Author-Checker-Approver history with them, so the proof exists the day anyone asks for it.
Metro packages, airport work and large-scale developments in the Gulf, coordinated and completed to ISO 19650. A selection below.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseIssued drawings come from a clash-resolved federation, so what reaches a Midlands site has survived coordination first.
ERP dashboards report each deliverable's stage in real time, replacing the weekly where-is-it call.
ISO 19650 established at appointment, with the EIR answered properly and the BEP written before production begins.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadYes, discipline modelling and federation is the bulk of what we deliver. We author in Revit, Civil 3D and Navisworks to your LOD specification and issue packages in a state a Midlands site can build from. With 260+ engineers on a stable offshore floor, you get the modelling volume a large programme needs without joining the regional queue for senior staff that infrastructure recruitment creates.
Both. JES is a BIM modelling company in Birmingham that produces the models and drawings and governs the standards they run to. We author the BEP, run the CDE and hold the Author-Checker-Approver gate on every file, so you get production hours and information governance from one accountable team rather than a consultancy that advises and a shop that draws separately.
Yes. We hold multi-trade BIM coordination in the federation and run regular clash cycles to resolve it before steel is cut, which is where Midlands infrastructure packages tend to fail. One named lead owns the coordination across the programme, tracking each conflict to closure against your BEP, so the interfaces are settled in the model before they reach a live site.
Yes. We laser-scan the existing structure, register the point cloud and rebuild it as an accurate record model for the Midlands' retrofit and adaptive-reuse work. That verified base becomes what every discipline coordinates against, so a reuse scheme designs against what actually stands rather than around geometry the old drawings got wrong.
Yes. BIM outsourcing to us runs on a stable offshore floor under one delivery lead, so your packages come out of the recruitment queue and a regional staff shortage never sets the pace of your delivery. You keep the same engineers on the work from the first month to the last, scaled up for the big programme and back down afterward, without a local hire.
Cost follows scope, the disciplines involved, the LOD you need and the programme length, so a large-scale development carries far more modelling than a single package. We scope each engagement to the actual work rather than a day rate. The zero-cost pilot on one package lets you test the modelling standard and QA on a real deliverable before committing.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.