Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Peak-load and full-package production for Irish design firms, modelled to your BEP so capacity stops dictating which jobs you bid.
Explore Build-sideDense MEP coordination and shop drawing volume for industrial and technology builds, resolved in the model before the site programme feels it.
Explore Owner-sideInformation governance across multi-vendor delivery chains, so every facility hands over with structured, usable asset data.
ExplorePharma and data-centre programmes outpace Irish hiring. JES supplies the team ready-made.
Cleanroom MEP, hyperscale data halls and campus expansions all draw on the same small pool of senior technicians. JES puts a 260+ engineer production floor behind that volume. Your office keeps the client relationship and the design authority.




























Whatever mix an Irish project needs, every file passes the same three-stage review and lands in the CDE with its ERP trail attached.

High-density modelling and coordination across disciplines, to the LOD and tolerance industrial clients specify, issued construction-ready.
Explore service
4D and 5D analysis run on the model, catching sequence clashes and cost drift while the remedy is a meeting rather than a claim.
Explore service
CDE structure, naming and exchange management to ISO 19650, holding a fast-moving industrial programme to its own information plan.
Explore
Asset models carrying the structured data a validated facility demands, delivered at handover instead of promised after it.
Explore
Model-derived quantities aligned to your cost plan, giving estimating, procurement and variations a common baseline.
Explore
Laser scanning processed into verified record models, documenting the installed condition before the building closes up.
ExploreOne team covers the full BIM scope, so an Irish programme shortens its supplier list instead of lengthening it.
Multidiscipline Revit production federated in Navisworks, with the model density industrial and technology projects require.
Equipment and component families authored to your standard, including the plant-heavy content data-centre and pharma models live on.
Programme simulation, cost extraction and performance data tied to geometry, one model feeding three conversations.
Shop and installation drawings at fabrication tolerance, coordinated before they reach a contractor's site cabin.
Existing facilities captured by point cloud and rebuilt as accurate models for expansion and retrofit planning.
Historic 2D documentation converted into coordinated 3D, giving long-lived industrial estates a current model.
Handover data structured for the owner's CAFM system, so operations begin with information instead of archaeology.
Take-off generated from the coordinated model and mapped to your cost structure, consistent from tender through closeout.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without that gate, a stretched market shows the strain: coordination gaps surface during commissioning, drawing rework eats the programme float, and handover data arrives incomplete on facilities that depend on it. JES files clear Author-Checker-Approver review before issue, and the record of that review stays with every deliverable.
Airport, metro and resort packages delivered in the Gulf at high services density. A look at the portfolio below.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseDeliverables issue from a coordinated federation, so review effort in Dublin or Cork goes to engineering judgement, not error hunting.
ERP tracking shows the live status of every file, replacing status meetings with a dashboard your team checks in passing.
ISO 19650 from the first exchange: EIR reviewed, BEP authored, CDE configured before modelling begins.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadYes, high-density BIM modelling across disciplines is what our floor is built for. We author to the LOD and tolerance validated pharma and data-centre work specifies, coordinate on one federated model and issue construction-ready packages. With 260+ engineers behind the volume, you get the modelling capacity cleanroom MEP and hyperscale halls demand without competing for Ireland's small pool of senior technicians.
Both. JES is a BIM modelling company in Ireland that produces the models and drawings and governs the standards they run to. We author the BEP, run the CDE and hold the Author-Checker-Approver gate on every file, so you get production hours and information governance from one accountable team, while your office keeps the client relationship and the design authority.
Yes. We carry dense MEP BIM coordination for cleanroom and hyperscale work and run regular clash cycles to resolve it in the model before the site programme feels it. One named lead owns the coordination across the campus, tracking each conflict to closure against your BEP, so a services-dense build mobilises on information that has already been reconciled across trades.
Yes. We laser-scan the existing facility, register the point cloud and model it into a verified record documenting the installed condition before the building closes up. That verified base becomes what every discipline works from, so expansion and retrofit planning starts from what actually stands rather than from drawings that no longer match the plant.
Yes. BIM outsourcing to us puts a 260-plus engineer production floor behind your volume under one delivery lead, while your office keeps the client relationship and the design authority. Capacity scales with the programme, so a cleanroom or data-hall surge never forces you to compete for the same senior technicians every firm in the sector is chasing.
Cost follows scope, the disciplines involved, the LOD you need and the programme length, so a hyperscale data hall carries far more modelling than a single campus block. We scope each engagement to the actual work rather than a day rate. The zero-cost pilot on one package lets you test the high-density modelling and QA on a real deliverable before committing.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.