Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design packages produced to your BEP across the HOAI phases your appointment covers. Your architects and engineers keep the design decisions; we carry the modelling load.
Explore Build-sideConstruction models, shop drawings and multi-trade coordination from tender to handover. Clashes get resolved in the model, where they cost hours instead of site days.
Explore Owner-sideOne information standard across every consultant and contractor on your portfolio. Your EIR and BEP enforced through the CDE, with audit evidence at every exchange.
ExploreGermany's mandate set the standard. We supply the capacity.
Since the federal mandate, BIM is the working method on infrastructure and, increasingly, on buildings. One office in Ortenberg, 260+ engineers behind it. Your scope is produced at depth and delivered without adding a single role to your payroll.




























Every deliverable passes the same Author-Checker-Approver gates and carries the same ERP record, whichever of the six services your project draws on.

Architecture, structure and MEP modelled and coordinated to your LOD specification, issued as drawing sets your site team can build from without interpretation.
Explore service
4D sequencing and 5D cost built from the federated model, so programme risk and budget drift surface in planning rather than in claims.
Explore service
CDE setup, naming conventions and exchange workflows run to ISO 19650, so your information manager governs the project instead of policing file names.
Explore
Asset models structured for operation from handover day, carrying the data your FM contractor needs rather than everything the authoring tool exports.
Explore
Quantities taken from the coordinated model and mapped to your cost structure, so estimating, procurement and claims reference one source.
Explore
Point cloud to record model for existing stock: retrofit, conversion and documentation of buildings that have outlived their drawings.
ExploreEight capabilities from one team and one QA system, so your project never coordinates across multiple BIM vendors.
Multidiscipline Revit and Civil 3D production with Navisworks federation, run to a single modelling standard across every package.
Parametric Revit families to your LOD and naming specification, from facade components to plant-room equipment.
4D programme simulation and 5D cost on the coordinated model, with 6D performance data where your brief calls for it.
Trade shop drawings coordinated against the federated model and issued at construction tolerance, ready for your site office.
Scan to BIM for the renovation pipeline: point clouds converted into reliable as-built models for retrofit and conversion work.
Archive 2D drawings rebuilt into coordinated 3D models, giving older assets a single current source of truth.
Asset data structured to COBie or your CAFM schema at handover, so operations starts with information instead of a search.
Model-based quantity take-off mapped to your cost codes, keeping tender, procurement and variations on one number.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Skip the gate and the costs arrive late, when they are largest: coordination errors found on site, audit findings against the BEP, asset data rebuilt by hand at handover. Every JES file carries an Author-Checker-Approver record you can put in front of your client or your auditor.
Metro lines, airport terminals and national museums coordinated to ISO 19650 across the Gulf, now delivered into Germany from Ortenberg.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseCoordinated drawing sets issued against the programme from a clash-checked federated model. Site queries drop because the answers are already modelled.
Author-Checker-Approver sign-off on every file, visible in ERP dashboards. You read where each deliverable sits instead of writing chasing emails.
ISO 19650 structure from kick-off: EIR interpreted, BEP written, CDE configured. The audit trail builds as the project runs.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and coordination, and we govern the information: BEP authorship, CDE setup and naming run to ISO 19650. One accountable team owns both halves, not a consultancy that advises alongside a shop that draws. Since the federal mandate made BIM the working method, that single line of accountability keeps your infrastructure and building scope moving.
Yes. A delivery lead in Ortenberg owns your programme and embeds in your coordination, backed by 260+ engineers producing your scope at depth. Capacity scales up for the mandate deadlines and back down after, so you meet the standard without adding a permanent role to your German payroll. You get one accountable name on the contract.
Yes. Our consultants embed in your delivery across the HOAI phases your appointment covers, authoring the BEP, holding your LOD and working to ISO 19650. Your architects and engineers keep the design decisions; we carry the modelling load underneath them. One named lead stays accountable across the programme, so the standard the mandate set is met file by file.
Yes. We laser scan the existing building, register the point cloud and turn it into a coordinated record model that matches what actually stands. That verified base is what architecture, structure and MEP coordinate against, which matters for the retrofit and conversion work on stock that has outlived its drawings. The scan removes the guesswork before your team designs into it.
Architecture, structure and MEP, modelled in Revit and federated in Navisworks for regular clash cycles on one model. Every file passes the Author-Checker-Approver gate against your BEP before issue, so drawing sets reach your site team at construction tolerance. Your people build from the output without reinterpreting it, and the inspection record travels with each package.
Scope, disciplines, LOD and programme length drive it. A full arch-structure-MEP model held to a high LOD across a long programme carries more hours than a single-discipline package, so we scope each engagement to the actual work rather than a flat rate. The clearest way to see the output and the QA gate is a zero-cost pilot on one package before you commit.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.