Federated BIM model, mixed-use development

Systematized BIM services in Zurich.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Design wins your commissions. Production is what we carry.

Strong practices keep their best people on design, then run out of hours when documentation peaks. The drafting load moves to a floor of 260+ engineers; the design authority stays at your desk. Packages return checked, coordinated and to your standard.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

The full scope, to your office standard

Eight capabilities delivered under your standards, so your clients see one consistent practice whatever the workload behind it.

  • 3D BIM modelling

    Multidiscipline Revit production to your graphic and data standards, federated in Navisworks and kept clash-managed.

  • Revit family creation

    Bespoke Revit families matching your detail library, so outsourced packages stay visually and dimensionally yours.

  • 4D, 5D and 6D simulation

    4D sequencing for tight urban logistics, 5D cost from the model, and 6D operational data when your owner asks for it.

  • Shop drawings & detailing

    Shop drawings developed from the coordinated model at installation tolerance, checked before they reach your contractor.

  • Scan to BIM

    Existing buildings scanned and rebuilt as accurate models for conversion and densification projects.

  • CAD to BIM conversion

    Practice archives in 2D translated into coordinated 3D models without losing the drawing craft they contain.

  • BIM for facility management

    Operational data structured and validated at handover, ready for the facility teams of long-hold owners.

  • Quantity take-off & BOQ

    Model-based take-off aligned to your cost planner's structure, re-measured as the design moves.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without that capacity, production erodes the practice: senior designers drafting, packages slipping, quality varying with whoever was available. The system exists so capacity is never the reason quality drops.

Delivered for design-led clients

Hotels, cultural buildings and metro infrastructure coordinated to ISO 19650 across the Gulf portfolio, produced behind consultants who kept full design authorship.

View all

What changes when delivery runs to a system

  • Construction-ready output

    Drawing packages delivered to your deadline from a coordinated model, in your templates, matching your in-house output in everything but volume.

  • Your team stops chasing deliverables

    Live ERP dashboards show every deliverable's author, checker and approver, so your project leads direct the work instead of auditing it.

  • Runs to standard

    ISO 19650 structure from the first exchange, so the information side of your project is as ordered as the architecture.

Common questions about BIM in Zurich

Both. We produce the models, drawings and coordination, and we govern the information through the BEP, the CDE and the ISO 19650 gate. One accountable team owns both, not a consultancy advising beside a shop that draws. When your studio keeps design authorship and hands off production, that single ownership keeps the intent intact into the construction set.

Yes. A delivery lead owns your programme and embeds in your coordination, backed by a floor of 260+ engineers. When documentation peaks, the drafting load moves to us while the design authority stays at your desk. Capacity scales for the peak and back down after, so your best people stay on design and you carry no permanent production bench.

Yes. Our consultants embed in your delivery, work to your office standard, author the BEP and hold your LOD to ISO 19650. The design intent that won the project survives into the construction documentation, because we produce underneath your authorship rather than beside it. One named lead is accountable across the programme, so packages return checked and coordinated to your standard.

Yes. We scan the existing structure, register the point cloud and build a coordinated record model that matches what stands, which suits refurbishment on dense city-centre sites. Every discipline then coordinates against that verified base rather than old drawings. On staging-tight urban plots where neighbours leave no room for surprises, the scan gives your team a reliable existing condition to design into.

Architecture, structure and MEP, authored in Revit and federated in Navisworks for regular clash cycles on one model. For dense urban sites the staging plan and the neighbours leave no room for surprises, so coordination is resolved before mobilisation. Every file clears the Author-Checker-Approver gate against your BEP, so each package returns at construction tolerance to your office standard.

Scope, disciplines, LOD and programme length set it. A full documentation package to a high LOD carries more hours than a coordination-only scope, so we price to the actual work rather than a day rate. If the need is peak-time drafting cover, the lowest-risk way to test it is a zero-cost pilot on one package before you commit.