Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Production behind your office: models authored to your standard and exchanged as validated IFC, so your tools and checkers read them cleanly.
Explore Build-sideConstruction coordination and shop drawings inside openBIM workflows, with clash management documented in the formats your project runs on.
Explore Owner-sideInformation governance with machine-checkable handover data, structured for owners who validate deliverables as standard practice.
ExploreYour market specified IFC first. We deliver it validated.
Statsbygg-era requirements made clean IFC, model checking and data discipline the baseline you work to. We deliver IFC-first and validate before issue, with production depth a small labour market cannot supply on demand.




























Native models where you want them, IFC where your project requires it, and the same QA gates and ERP traceability behind both.

Discipline modelling with parallel native and IFC deliverables, checked for geometry and data quality before either leaves the floor.
Explore service
4D and 5D built on the federated model, supporting the early, data-led decisions your clients expect projects to make.
Explore service
ISO 19650 information management in an openBIM environment: exchange requirements honoured, status codes meaningful, audit trail complete.
Explore
Asset models with open, structured data at handover, built for public and private owners who operate from their models.
Explore
Quantities from the model with element-level traceability, consistent whether your QS reads native files or IFC.
Explore
Scan to BIM for existing assets, delivered in open formats so the record model outlives any single software choice.
ExploreThe full scope delivered native or open as your project demands, from one team with one QA regime.
Revit and Civil 3D production with disciplined IFC export, federated and clash-managed across all disciplines.
Content built with clean parameter mapping, so families carry their data through IFC instead of losing it at export.
4D sequencing and 5D cost on the coordinated model, with 6D data structured to open standards where required.
Shop drawings coordinated against the federated model, issued at installation tolerance with their checking record.
Point clouds processed into as-built models delivered in native and IFC formats, for renewal and documentation work.
Legacy 2D documentation rebuilt as data-rich models that pass the same validation gates as new work.
Open-format handover data validated against your requirements, ready for your FM environment on day one.
Model-based take-off with provenance per element, so quantities hold up in any review.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
The capacity risk in a mature market is specific: suppliers who claim openBIM fluency and deliver IFC exports that fail validation. Every JES deliverable is checked before issue, and the three-signature record names who checked it.
Airports, metros and cultural buildings coordinated to ISO 19650 across the Gulf. The pilot costs nothing, and your own checkers give the verdict.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseDeliverables issued to programme and validated against the exchange requirements first, so your model checker confirms rather than corrects.
Status, authorship and approval visible per file in ERP dashboards, so your project team reads facts instead of trading emails.
ISO 19650 alignment from day one, mapped to your openBIM requirements rather than bolted alongside them.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the discipline models, drawings and coordination, and we govern the standards behind them: the BEP, the CDE and the gate every file clears. That means one accountable team delivering validated IFC and native models to the Statsbygg-era baseline you work to, not a consultancy that advises alongside a shop that draws.
Yes. You get a dedicated outsourced BIM team under one named delivery lead, with production depth a small labour market cannot supply on demand. Capacity scales up for a busy programme and back down after, so you carry no permanent bench. Every deliverable is checked before issue and named against three signatures.
Yes. Our consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650 in an openBIM environment. One named lead stays accountable across the programme, so exchange requirements are honoured and every IFC export reads cleanly through your own validation tools before you accept it.
Yes. We run laser scan to registered point cloud to a coordinated record model, delivered in native and open formats so it outlives any single software choice. That verified base is what architectural, structural and MEP all coordinate against. It suits renewal and documentation work where the existing asset was never modelled to a current standard.
Architectural, structural and MEP, authored in Revit and federated in Navisworks with regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, and delivered as parallel native and validated IFC. You receive a resolved set your checkers can read in whichever format your project requires.
Cost follows scope, the disciplines involved, the LOD you need and the programme length, so we scope each engagement to the actual work rather than a flat rate. An IFC-validated infrastructure package carries more than a single building. The zero-cost pilot on one package lets your own checkers judge the output and the validation first.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.