Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design and tender packages produced to your BEP, in your templates, on your CDE. Your architects and engineers stay on design while we take the modelling load.
Explore Build-sideTrade coordination, shop drawings and as-built records from tender through handover. Clashes are resolved in the federated model before they reach a Spanish site.
Explore Owner-sideOne information standard across every consultant and contractor on your scheme. The EIR is enforced through the CDE, and asset data arrives structured at handover.
ExploreSpanish practices are winning international work faster than they can staff it. We supply the production.
Infrastructure frameworks, hospitality schemes and cross-border commissions arrive together, and senior modellers take months to recruit. JES mobilises a working BIM team in weeks. Production runs from our 260+ engineer floor, coordination runs on your hours, and every file passes Author-Checker-Approver review before you see it.




























Every package passes the same Author-Checker-Approver review, shows on the same ERP dashboard and meets the same ISO 19650 baseline before it leaves our floor.

Architectural, structural and MEP models with the drawings to match, coordinated before issue so your site team builds from a resolved set.
Explore service
4D sequencing and 5D cost models that test the programme before you commit to it. Delay and overrun show up on screen, where they are still cheap to fix.
Explore service
CDE setup, naming conventions and exchange management run to your EIR. The standard holds across every supplier on the project.
Explore
Asset models structured for the FM team that inherits the building. Handover data that loads into CAFM instead of sitting in a folder.
Explore
BOQs and procurement quantities taken directly from the coordinated model, so your commercial team works from one auditable number.
Explore
Point cloud surveys processed into verified record models, with deviations flagged during the works rather than after them.
ExploreEight capabilities from a single supplier, so your project never stalls waiting for a second subcontractor to mobilise.
Multidiscipline Revit and Civil 3D production to LOD 350 and beyond, run to one modelling standard across architecture, structure and MEP.
Parametric Revit families authored to your naming and LOD specification, from facade components to mechanical plant.
4D programme simulation and 5D cost linkage on the federated model, with 6D performance data where the brief demands it.
Trade shop drawings coordinated against every other discipline before issue, dimensioned for fabrication.
Survey point clouds converted into accurate existing-condition models for refurbishment and extension work.
Archive 2D drawing sets rebuilt as structured 3D models, giving long-running assets a single current record.
Asset registers and COBie data structured during the project, not reverse-engineered after practical completion.
Quantity take-off mapped to your measurement rules, so the BOQ stays aligned with the model as the design moves.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Skip that discipline and the pattern is familiar: late packages, drawings that contradict each other on site, audit findings against the BEP and a handover file nobody can use. JES closes each gap with a named author, a named checker and a named approver on every file, visible in the ERP at any hour.
Metro systems, airports and resort masterplans in the Gulf, delivered to ISO 19650 on deadlines tighter than most European frameworks. A sample below.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseCoordinated packages issued against the programme from a clash-checked federated model. Site queries fall because the answers were resolved at modelling stage.
Status lives on an ERP dashboard your team can open, not in a weekly email. Every file shows its author, checker and approver.
ISO 19650 wired into project setup: EIR review, BEP authorship and CDE structure from the first week.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the architectural, structural and MEP models and drawings, and we govern the standards: the CDE, the naming, the exchange management run to your EIR. One accountable team does both, so adding scope never means adding a vendor. You are not managing a consultancy that advises beside a separate shop that draws.
Yes. You get a dedicated outsourced BIM team under one named lead, producing from our 260+ engineer floor and coordinating on your hours. When infrastructure frameworks and hospitality schemes peak together, capacity scales in weeks rather than waiting on recruitment. Every file passes Author-Checker-Approver review before you see it, visible in the ERP.
Yes. Our consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650 across every supplier on the project. One named lead stays accountable throughout. Your architects and engineers keep authorship of the design while we take the modelling load and pass every deliverable through the gate.
Yes. We process survey point clouds into a coordinated record model, with deviations flagged during the works rather than after them. Architectural, structural and MEP coordinate against that verified base. For the refurbishment and extension work behind much of Spain's pipeline, it gives your team an accurate existing condition to design against.
Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles on one model, authored, checked and approved against the BEP before issue. Trade packages run from tender through handover, and clashes are resolved in the federated model before they reach a Spanish site rather than during construction.
Cost follows scope, the disciplines involved, the LOD you need and the programme length, so we scope each engagement to the actual work rather than a day rate. A resort masterplan carries more than a single hospitality scheme. The zero-cost pilot on one package lets you see the output and the QA before committing.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.