Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Conversion and new-build packages documented to your BEP while your studio holds the design. Existing constraints are captured in the model, not found on site.
Explore Build-sideTrade coordination for tight urban sites where the laydown area is a street. Clashes are resolved in the model because there is no room to resolve them on site.
Explore Owner-sideHotel and residential portfolios held to one information standard, so every operator handover arrives in the same structure regardless of which consultants delivered it.
ExploreLisbon's conversion projects demand more documentation than most design teams carry. We produce it to your BEP.
Hospitality conversions and regeneration schemes stretch the city's studios across survey, design and documentation at once. JES puts a 260+ engineer floor behind your project, coordinated on European hours through our German office, with Author-Checker-Approver review on every file.




























From modelling to handover data, every deliverable moves through the same QA gates and the same ERP log, configured to ISO 19650 at setup.

Models and drawings for new-build and conversion alike, federated and clash-checked before they reach your site team.
Explore service
4D logistics and 5D cost studies for constrained city-centre sites, where sequence errors cost more than they would on open ground.
Explore service
EIR, BEP and CDE run as working instruments, with exchanges checked and naming verified through the project.
Explore
Asset models built for hotel and residential operators, with the data layer their FM contracts specify.
Explore
Take-offs from the coordinated model for cost plans and variations, replacing parallel measurement with a single audited source.
Explore
Scan-to-record verification for conversions, documenting the existing structure and the new works in one model.
ExploreEight services under one supplier, so a scheme moves from survey to handover without changing vendor.
Coordinated Revit production across architecture, structure and MEP, with one standard governing every model we touch.
Project and office families authored to specification, including the irregular components conversion work demands.
4D sequencing for constrained sites, 5D cost linkage for tight budgets, 6D performance data where sustainability targets require it.
Coordinated shop drawings at fabrication tolerance, resolved against the federated model before the workshop sees them.
Scan to BIM for existing fabric: point clouds converted into accurate models of buildings that predate any reliable drawing.
Paper and 2D archives rebuilt as structured models, giving older buildings a dependable digital record.
Handover data shaped for operators: structured, CAFM-ready and complete before practical completion.
Model-based quantities tied to your measurement rules, so commercial control survives design change.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Take the gate away and a conversion project fails in known places: programme slip on documentation, trades clashing inside the existing structure, audit findings against the BEP and operator handovers missing half their data. Every JES file carries its named author, checker and approver, logged in ERP.
Resort destinations, museum structures and metro infrastructure in the Gulf, delivered under ISO 19650 against fixed opening dates. A selection follows.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the casePackages issued on programme from a federated, clash-resolved model, so your site builds instead of raising queries.
The ERP dashboard shows every deliverable, its reviewer and its status the moment you look.
ISO 19650 from the project's opening week, with the EIR translated into a BEP your supply chain can follow.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and coordination and we govern the standards: the EIR, BEP and CDE run as working instruments, exchanges checked and naming verified. One accountable team does both. You are not coordinating a consultancy that advises and a separate shop that draws, which matters when a conversion moves fast against a fixed opening date.
Yes. You get a dedicated outsourced BIM team under one named lead behind your project, a 260+ engineer floor, so survey, design and documentation no longer stretch your studio at once. Capacity scales against the programme, not a permanent bench. Coordination runs on European hours through our German office, with Author-Checker-Approver review on every file.
Yes. Our consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650, coordinated on European hours through our German office. One named lead stays accountable across the programme, and every file passes the author, checker and approver gate before it reaches your site team or the operator.
Yes. We run laser scan to registered point cloud to a coordinated record model, documenting the existing structure and the new works together. Architectural, structural and MEP coordinate against that base. For hospitality conversions inside buildings that predate any reliable drawing, it gives your team a verified existing condition rather than a guess.
Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles on one model, authored, checked and approved against the BEP before issue. On tight urban sites where the laydown area is a street, clashes are resolved in the model because there is no room to resolve them on site.
Cost follows scope, the disciplines involved, the LOD you need and the programme length, so we scope each engagement to the actual work rather than a flat rate. A hospitality conversion carries more than a new-build scheme. The zero-cost pilot on one package lets you test the output and the QA before committing.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.