Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Documentation capacity that lets your practice bid larger and international work, with the BIM standard in place when the tender asks for it.
Explore Build-sideCoordination models and trade drawings that keep fast-moving sites supplied with resolved information.
Explore Owner-sideOne data standard across a growing portfolio, so the newest asset hands over as cleanly as the first.
ExploreRomania's EU-funded projects must evidence their information management at audit. We deliver with the trail attached.
Logistics parks, residential schemes and funded transport works all require structured information delivery that most local supply chains are still building up. JES supplies it ready to run: ISO 19650 from setup, Author-Checker-Approver on every file, ERP dashboards you can show your client or your funder.




























No ramp-up period: each service arrives with QA gates, ERP tracking and ISO 19650 configuration already running.

Full-discipline modelling and drawing production, federated and clash-checked, issued at construction tolerance.
Explore service
4D programme and 5D cost analysis that gives developers and funders model-backed answers.
Explore service
ISO 19650 information management as a service: EIR drafted or interpreted, BEP authored, CDE run, suppliers held to it.
Explore
Structured asset data at handover, giving new assets the operational baseline older stock never had.
Explore
Quantities from the coordinated model for BOQs, funding claims and variations: one number that survives scrutiny.
Explore
Scan-verified record models documenting what was delivered, the kind of evidence funded projects increasingly require.
ExploreEight capabilities from one supplier, so a programme adds services as it grows without adding vendors.
Multidiscipline Revit and Civil 3D production under one standard, from residential blocks to transport infrastructure.
Revit families authored to your conventions and LOD targets, building a library your future projects reuse.
4D sequencing, 5D cost models and 6D performance data, applied where each project genuinely needs them.
Shop drawings coordinated against the federated model and issued for fabrication, not reinterpretation.
As-built capture turned into dependable models for retrofit, extension and industrial schemes.
Legacy 2D sets converted into structured 3D models, bringing older assets into the same data environment as new ones.
Asset registers and maintenance data structured for CAFM, handed over complete.
Model-based take-off aligned to your cost structure, keeping estimates, tenders and claims on a single source.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Build fast without these controls and the costs surface late: packages reissued mid-programme, clashes found during excavation, failed information audits and handovers with no usable data. On funded work the documentation consequences follow. JES prevents the pattern with named review on every file and a permanent ERP trail.
Gulf metro packages, airport programmes and large resorts, delivered to ISO 19650 at speed. The portfolio below shows the system Romania engages.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseConstruction-ready packages issued against the programme from a clash-free federated model, keeping fast sites supplied.
ERP dashboards show deliverable status and review history continuously, so progress reporting comes from the record.
ISO 19650 installed at project start, giving your team an implementation you can show auditors and funders.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the full-discipline models and drawings and we govern the standards: ISO 19650 from setup, the EIR drafted or interpreted, the BEP authored, the CDE run. One accountable team does both, so a supply chain still building up structured delivery gets production and governance together, not a consultancy that advises beside a separate drawing shop.
Yes. You get a dedicated outsourced BIM team under one named lead, supplying ISO 19650 from setup so a supply chain still building its own capability can deliver to that standard now. Capacity scales against the programme, not a permanent hire. Every file clears Author-Checker-Approver review, with ERP dashboards you can show your client or your funder.
Yes. Our consultants embed in your delivery, draft or interpret the EIR, author the BEP and LOD schedule and hold the work to ISO 19650, with suppliers held to it. One named lead stays accountable across the programme, keeping the audit trail that funded transport and residential schemes must evidence when the funder inspects the information management.
Yes. We turn as-built capture into a registered point cloud and a coordinated record model, the kind of evidence funded projects increasingly require. Architectural, structural and MEP coordinate against that verified base. For retrofit, extension and industrial schemes it gives new work a dependable record of what already stands on site.
Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles on one model, authored, checked and approved against the BEP before issue. Coordination keeps fast-moving sites, from logistics parks to funded transport works, supplied with resolved information rather than clashes found during excavation.
Cost follows scope, the disciplines involved, the LOD you need and the programme length, so we scope each engagement to the actual work rather than a day rate. A funded transport scheme carries more than a single logistics park. The zero-cost pilot on one package lets you see the output and the audit trail first.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.