Federated BIM model, mixed-use development

Systematized BIM services in Stuttgart.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Stuttgart engineers to fine tolerances. So does our QA.

In an industrial and automotive region, your reviewers expect the last package to match the first, so we remove the variance before issue. 260+ engineers, and three signatures on every file: Author, Checker, Approver. The deliverable is inspected before it ships, and the inspection record ships with it.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

The full scope, one supplier

Eight capabilities from one team and one QA system, so your project never coordinates across multiple BIM vendors.

  • 3D BIM modelling

    Multidiscipline Revit and Civil 3D production with Navisworks federation, run to a single modelling standard across every package.

  • Revit family creation

    Parametric Revit families to your LOD and naming specification, from facade components to plant-room equipment.

  • 4D, 5D and 6D simulation

    4D programme simulation and 5D cost on the coordinated model, with 6D performance data where your brief calls for it.

  • Shop drawings & detailing

    Trade shop drawings coordinated against the federated model and issued at construction tolerance, ready for your site office.

  • Scan to BIM

    Scan to BIM for the renovation pipeline: point clouds converted into reliable as-built models for retrofit and conversion work.

  • CAD to BIM conversion

    Archive 2D drawings rebuilt into coordinated 3D models, giving older assets a single current source of truth.

  • BIM for facility management

    Asset data structured to COBie or your CAFM schema at handover, so operations starts with information instead of a search.

  • Quantity take-off & BOQ

    Model-based quantity take-off mapped to your cost codes, keeping tender, procurement and variations on one number.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Remove the inspection and the defects ship: clashes surface during installation, drawing revisions contradict each other, and the handover dataset fails its first audit. On JES work no file leaves without its three signatures.

Delivered on engineering-led builds

Airports, metro systems and industrial-scale developments coordinated to ISO 19650 across the Gulf, with the QA records to match. The Ortenberg office brings that method to Germany.

View all

What changes when delivery runs to a system

  • Construction-ready output

    Coordinated drawing sets issued against the programme from a clash-checked federated model. Site queries drop because the answers are already modelled.

  • Your team stops chasing deliverables

    Author-Checker-Approver sign-off on every file, visible in ERP dashboards. You read where each deliverable sits instead of writing chasing emails.

  • Runs to standard

    ISO 19650 structure from kick-off: EIR interpreted, BEP written, CDE configured. The audit trail builds as the project runs.

Common questions about BIM in Stuttgart

Both. We produce the models, drawings and coordination, and we govern the information through BEP authorship, the CDE and the ISO 19650 gate. One accountable team owns both, not a consultancy advising beside a shop that draws. In a region that expects the fiftieth package to match the first, that single ownership is what keeps the tolerance consistent across the programme.

Yes. A delivery lead owns your programme and embeds in your coordination, backed by 260+ engineers producing to a fixed method. Every file carries three signatures, Author, Checker and Approver, so the variance your industrial reviewers watch for is caught before issue. Capacity scales with the programme rather than sitting on your payroll, and one name stays accountable throughout.

Yes. Our consultants embed in your delivery, author the BEP, hold your LOD and check each package against your specification before it ships. Your review cycles shorten rather than multiply, because the inspection happens on our floor first. One named lead is accountable to ISO 19650 across the programme, so the fine tolerance your region works to is met on every issue.

Yes. We laser scan the existing facility, register the point cloud and produce a coordinated record model measured against what stands, useful for industrial and plant refurbishment. That verified base is what architecture, structure and MEP coordinate against, so deviation is caught in the model rather than at the installation front. It removes the measurement uncertainty before design begins.

Architecture, structure and MEP, authored in Revit and federated in Navisworks for regular clash cycles on one model. For industrial and infrastructure builds, deviation is caught in the model rather than at the installation front. Every file passes the Author-Checker-Approver gate against your BEP, and the inspection record ships with it, so your site team builds from a checked set.

Scope, disciplines, LOD and programme length drive it. A tightly checked industrial model to a high LOD carries more hours than a single package, so we scope to the actual work rather than a flat rate. The clearest way to judge the QA before committing is a zero-cost pilot on one package, inspection record included, so you see the gate in action.