Federated BIM model, mixed-use development

Systematized BIM services in France.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

French clients expect model-based delivery, and senior production staff remain scarce. We supply the capacity.

Since the Plan BIM push, digital delivery requirements have outgrown the supply of experienced production staff in large groups and mid-size practices alike. JES closes the gap with delivered capacity, not recruitment: your conventions respected, your CDE used, every file checked twice before you see it.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Eight capabilities, one documented standard

The full model-side scope from one supplier, each capability run to the standard your reviewers expect.

  • 3D BIM modelling

    Revit and Civil 3D production across disciplines, conforming to your convention down to annotation and sheet standards.

  • Revit family creation

    Object libraries authored to your classification and LOD requirements, consistent across every project we run for you.

  • 4D, 5D and 6D simulation

    Programme simulation in 4D, cost integration in 5D and performance data in 6D where the brief requires.

  • Shop drawings & detailing

    Execution-level drawings coordinated against the federated model, ready for fabrication without interpretation.

  • Scan to BIM

    Point cloud processing into faithful existing-condition models for renovation and heritage interventions.

  • CAD to BIM conversion

    Legacy 2D documentation reconstructed as structured models, ready for use in a current data environment.

  • BIM for facility management

    Operations-ready asset data: classified, complete and importable into the FM systems your operators run.

  • Quantity take-off & BOQ

    Model-derived quantities aligned to your measurement method, holding one number through estimate, tender and variation.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Remove that rigour and the failure modes are predictable: packages behind programme, synthesis conflicts surfacing on site, non-conformities at BIM audit and operations data arriving incomplete. JES prevents them the same way on every project: a named author, checker and approver on each deliverable, logged in ERP.

Documented to the standard

Metro infrastructure, airport packages and cultural landmarks in the Gulf, carried to handover under ISO 19650. The projects below are the evidence.

View all

Common questions about BIM in France

Both. We produce the multidiscipline models and drawings and we govern the standards: the CDE administered, exchanges controlled, convention compliance checked as a service. One accountable team does both, coordinated on European hours from our office in Ortenberg. You are not managing a consultancy that advises beside a separate shop that draws to your charter.

Yes. You get a dedicated outsourced BIM team under one named lead, so Plan BIM delivery requirements no longer outrun the supply of experienced production staff. We close the gap with delivered capacity rather than recruitment, scaling against the programme. Your conventions are respected, your CDE used, and every file is checked twice before you see it.

Yes. Our consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650 across every contributor. One named lead stays accountable across the programme. We run the CDE administration, exchange control and compliance checking, respecting your convention and graphic charter exact to the line weight while your engineers validate.

Yes. We run laser scan to registered point cloud to a coordinated record model, with deviation caught during the works and the final record matching the built condition. Architectural, structural and MEP coordinate against that base. For renovation and heritage interventions it gives your team faithful existing geometry rather than an assumed one.

Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles on one model, authored, checked and approved against the BEP before issue. Synthesis-grade coordination across all trades is documented and traceable rather than settled verbally, so the resolution behind each package can be evidenced at a French BIM audit.

Cost follows scope, the disciplines involved, the LOD you need and the programme length, so we scope each engagement to the actual work rather than a day rate. A heritage intervention carries more than a standard build. The zero-cost pilot on one package lets your engineers see the output and the QA first.