Federated BIM model, mixed-use development

Systematized BIM services in Portugal.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Lean Portuguese studios win work that demands the output of much larger firms. We add the production depth.

A lean studio can hold the design intent on a large project, but the drawing list outgrows the team. JES carries the production: 260+ engineers behind yours, coordinated through our Ortenberg office on your working day, with three-stage QA on every file.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

The full scope, one engagement

Eight services from one supplier, so your studio can take international scope without growing its payroll.

  • 3D BIM modelling

    Revit production across all major disciplines, run to a single documented standard from first model to final issue.

  • Revit family creation

    Component libraries built to your office template, with the parametric behaviour and LOD your projects need.

  • 4D, 5D and 6D simulation

    Sequencing, cost and performance dimensions added to the model where they sharpen decisions: 4D, 5D and 6D as the brief requires.

  • Shop drawings & detailing

    Shop drawings coordinated and dimensioned for the fabricator, checked against the federated model before they leave us.

  • Scan to BIM

    Point clouds from survey partners converted into dependable existing-condition models for renovation work.

  • CAD to BIM conversion

    Flat 2D archives redrawn as structured 3D models, so older documentation becomes usable project data.

  • BIM for facility management

    Operations-ready asset data assembled during delivery, structured for CAFM import at handover.

  • Quantity take-off & BOQ

    Model-based measurement aligned to your cost framework, keeping estimates current as the design develops.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Lose that control and the costs stack: missed issue dates, conflicting trade drawings, a BEP that fails review and asset data missing at completion. In a lean practice each one lands on the same few desks. The JES gate names an author, a checker and an approver on every file, logged in ERP.

Carried to handover

Airports, metro lines and resort programmes in the Gulf, taken through coordination and handed over under ISO 19650. A selection below.

View all

Common questions about BIM in Portugal

Both. We produce the discipline models, federation and drawings and we govern the standards behind them: the CDE administered, the naming convention held, the exchanges run. One accountable team does both, so a two-person BIM function performs like a department. You are not managing a consultancy that advises beside a separate shop that draws.

Yes. You get a dedicated outsourced BIM team under one named lead, 260+ engineers behind yours, so a lean studio can hold a large project without the drawing list outgrowing it. Capacity scales against the programme, not a permanent hire. Coordination runs through our Ortenberg office on your working day, with three-stage QA on every file.

Yes. Our consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650, coordinated through our Ortenberg office on your working day. One named lead stays accountable across the programme, and every file clears the author, checker and approver gate before the set you issue meets a foreign client's audit.

Yes. We convert survey-partner point clouds into a scan-verified record model that documents the building as it stands, not as the design assumed. Architectural, structural and MEP coordinate against that base. For the renovation work behind much of Portugal's pipeline, it gives your team a dependable existing condition to start from.

Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles on one model, authored, checked and approved against the BEP before issue. Coordination models and trade drawings are resolved against every discipline before mobilisation, for contractors delivering at home and abroad where the set has to survive a client's audit.

Cost follows scope, the disciplines involved, the LOD you need and the programme length, so we scope each engagement to the actual work rather than a day rate. A large project's drawing list carries more than a single package. The zero-cost pilot on one package lets you see the output and the QA first.