Federated BIM model, mixed-use development

Systematized BIM services in Madrid.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Madrid's consultancies are winning commissions their studios were not staffed for. The production moves to us.

Tower refurbishments, office quarters and large urban schemes are pulling capital-city practices into bigger packages of documentation. JES adds production capacity in weeks, with the Author-Checker-Approver gate on every deliverable and ERP visibility from day one.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Eight capabilities, one accountable team

Everything a programme needs from the model side, delivered by one supplier rather than assembled vendor by vendor.

  • 3D BIM modelling

    Architecture, structure and MEP modelled in Revit under a single standard, with Navisworks federation as the default.

  • Revit family creation

    Office-standard Revit families created and maintained for you, parametric where it pays, at the LOD your specification calls for.

  • 4D, 5D and 6D simulation

    Construction sequencing in 4D, cost modelling in 5D and performance overlays in 6D when the project warrants them.

  • Shop drawings & detailing

    Fabrication-level shop drawings checked against the federated model, so the workshop cuts from coordinated geometry.

  • Scan to BIM

    Existing buildings captured by point cloud and rebuilt as reliable as-built models for retrofit design.

  • CAD to BIM conversion

    Decades of 2D archive converted into structured 3D models that your current projects can reference.

  • BIM for facility management

    Handover information organised around operations: asset codes, warranties and maintenance data in CAFM-ready form.

  • Quantity take-off & BOQ

    Take-offs generated from the model under your measurement convention, keeping the cost plan tied to the design as it moves.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without that gate, documentation slips behind the programme, trades clash in the riser, the BEP fails its audit and the FM team inherits a model it cannot use. On a tower those failures surface in the most expensive phase. JES prevents them with named accountability on every file, tracked in ERP before anything is issued.

Delivered at metro scale

Gulf metro packages, museum-grade structures and resort programmes, each carried to handover under ISO 19650. The portfolio below is the reference.

View all

Common questions about BIM in Madrid

Both. We produce the full-discipline models and drawings and we govern the standards: your EIR and BEP enforced across the supply chain, the CDE administered, exchanges checked. One accountable team runs both, so your BIM manager directs instead of chasing. You are not stitching together a consultancy that advises and a separate shop that draws.

Yes. You get a dedicated outsourced BIM team under one named lead that absorbs the documentation your tower refurbishments and large urban schemes generate before it buries your technical office. Capacity is added in weeks and scales with the commission. Every deliverable clears the Author-Checker-Approver gate, tracked in the ERP from day one.

Yes. Our consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650 across every plot and supplier. One named lead stays accountable across the programme. The gate sits on every deliverable and the review chain is visible in the ERP before anything is issued, so nothing surfaces late.

Yes. We capture existing buildings by laser scan, register the point cloud and rebuild it into a coordinated record model that documents what was built and flags what deviated. Architectural, structural and MEP coordinate against that base. On a tower refurbishment it gives your retrofit design a reliable existing condition to work from.

Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles on one model, authored, checked and approved against the BEP before issue. Multi-trade conflicts are settled in the federated model rather than on a capital-city site, where on a tower those failures would surface in the most expensive phase.

Cost follows scope, the disciplines involved, the LOD you need and the programme length, so we scope each engagement to the actual work rather than a flat rate. A tower refurbishment carries more than a single office quarter. The zero-cost pilot on one package lets you test the gate and the ERP visibility first.