Federated BIM model, mixed-use development

Systematized BIM services in Belgium.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Institutional clients review line by line. Our files arrive with evidence.

Hospitals and public buildings carry documentation requirements that consume unprepared teams. Every JES file ships with an Author-Checker-Approver record, so your compliance evidence accumulates as the project runs instead of being assembled for the review.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Every capability, one accountable supplier

The full BIM scope from one team, so your hospitals, labs and public buildings keep a single point of accountability.

  • 3D BIM modelling

    Multidiscipline Revit production for services-dense buildings, federated in Navisworks and clash-managed throughout design.

  • Revit family creation

    Medical, technical and architectural Revit content built to your specification and parameter standard.

  • 4D, 5D and 6D simulation

    4D phasing for live-environment construction, 5D cost for public budgets, 6D data where your operator requires it.

  • Shop drawings & detailing

    Shop drawings for MEP-heavy installations, coordinated in the model before they reach site, at installation tolerance.

  • Scan to BIM

    Existing institutional buildings scanned and modelled, giving renovation projects an accurate base to design against.

  • CAD to BIM conversion

    Paper and 2D archives from long-lived institutions rebuilt as coordinated, queryable models.

  • BIM for facility management

    Handover data structured for healthcare and institutional CAFM systems, validated before delivery.

  • Quantity take-off & BOQ

    Quantities from the coordinated model in the structure public procurement expects, with the source element behind every figure.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without the gate, institutional work exposes every weakness: review comments multiplying, compliance evidence missing, programme slipping while documents are reassembled. The system produces the evidence as a by-product of doing the work properly.

Delivered for institutional clients

Museums, metro systems and resort programmes delivered to ISO 19650 in the Gulf under formal supervision, the Zayed National Museum among them.

View all

What changes when delivery runs to a system

  • Construction-ready output

    Packages issued to programme from a coordinated model, formatted for reviewers who check structure before they check content.

  • Your team stops chasing deliverables

    Three signatures and a dashboard entry per file, so your reporting to institutional clients takes an export, not an afternoon.

  • Runs to standard

    ISO 19650 from setup with the paper trail institutional audits expect, generated continuously rather than reconstructed.

Common questions about BIM in Belgium

Both. JES produces the discipline models and drawing sets, and governs the standards: BEP, CDE and the Author-Checker-Approver gate on every file, tracked in ERP. On institutional work that posture is what procurement expects, so you get production and governance from one accountable team rather than a consultancy that advises and a shop that draws.

Yes. We embed as your outsourced BIM team under one delivery lead on healthcare and public packages, delivered to ISO 19650. Every file ships with its Author-Checker-Approver record, so a hospital's documentation load no longer consumes an unprepared team and capacity scales with the programme rather than a permanent hire.

Yes. Our BIM consultants embed in your delivery, define the roles, exchanges and audit trail institutional frameworks require, and hold every discipline to ISO 19650. One named lead stays accountable across the programme, so your compliance evidence accumulates while the work runs instead of being assembled the night before a line-by-line review.

Yes. We run scan to point cloud to record model for older institutional stock, documenting hospitals and public buildings whose drawings stopped being accurate decades ago. Every discipline coordinates against that verified base, so a renovation designs against the building that stands rather than a record no one trusts.

Architectural, structural and MEP. We author them in Revit and federate them in Navisworks on regular clash cycles for services-heavy buildings. Every file is authored, checked and approved against your BEP before issue and documented at every gate, so a hospital ceiling void, its own coordination project, is resolved before installation.

Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the work rather than a flat day rate. A services-dense hospital package carries more than a standard office. See the output and QA that public procurement demands first on a zero-cost pilot for one package.