Federated BIM model, mixed-use development

Systematized BIM services in Manchester.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Manchester's schemes outgrew the local hiring pool. Delivered capacity closes the gap.

City-centre towers, campus masterplans and regeneration phases all draw on the same northern market for senior BIM staff. JES puts the engineers, the QA and the tracking behind your packages instead. You scope the work; the system produces it.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Eight capabilities, one supplier to onboard

All eight sit on one floor, so winning a bigger Manchester scheme never means assembling a supplier chain first.

  • 3D BIM modelling

    Revit and Navisworks production across disciplines, one standard whether the package is a refurb or a tower.

  • Revit family creation

    Custom families to your template and naming, built once and reused across every project we run for you.

  • 4D, 5D and 6D simulation

    Programme, cost and performance linked to geometry, so the model answers the planner's and the QS's questions too.

  • Shop drawings & detailing

    Construction-tolerance shop drawings coordinated against the federation before the site office prints them.

  • Scan to BIM

    Point clouds from existing northern building stock converted into accurate models for retrofit and reuse.

  • CAD to BIM conversion

    Legacy 2D sets rebuilt as intelligent 3D models, bringing older assets into the same environment as new work.

  • BIM for facility management

    Structured handover data ready for CAFM, so the operations story starts at completion, not six months after.

  • Quantity take-off & BOQ

    Model-based take-off mapped to your measurement rules, keeping commercial conversations on a single set of numbers.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Skip it and growth gets expensive: the bigger job exposes thin checking, drawings slip as the team stretches, and the quality you sold at tender drifts in delivery. Author-Checker-Approver review on every JES file means the standard holds at twice your current volume, with the evidence to show for it.

Proven at programme scale

Metro lines, terminals and mixed-use developments delivered in the Gulf show what the system carries. A few examples below.

View all

Common questions about BIM in Manchester

Yes, architectural, structural and MEP modelling is our main output. We author it in Revit to your standards and LOD specification, scaling up for a city-centre tower and back down after it, and coordinate it on one federated model before issue. With 260+ engineers behind the packages, you get the modelling volume a big scheme needs without drawing on the northern market for senior staff you would then carry.

Both. JES is a BIM modelling company in Manchester that produces the models and drawings and governs the standards they run to. We author the BEP, run the CDE and hold the Author-Checker-Approver gate on every file, so you scope the work and the system produces it, with production hours and information governance coming from one accountable team rather than a consultancy plus a drafting shop.

Yes. We carry construction-stage BIM coordination for the contractors building out Manchester's regeneration schemes, running regular clash cycles on a federated model so conflicts are resolved before site rather than after steel is set. One named lead owns the coordination across the packages, tracking each clash to closure against your BEP so the phase mobilises on settled information.

Yes. We laser-scan the existing northern building stock, register the point cloud and model it into an accurate record model for the retrofit and reuse work regeneration depends on. That verified base becomes what every discipline coordinates against, so an adaptive-reuse scheme starts from what actually stands rather than from drawings that no longer match the building.

Yes. BIM outsourcing to us runs on a stable offshore floor under one delivery lead, so you keep the same engineers on your packages from the first month to the last without a local hire. Capacity scales up for the big scheme and back down afterward, so a regional staff shortage never sets the pace of your delivery.

Cost follows scope, the disciplines involved, the LOD you need and the programme length, so a regeneration phase carries far more modelling than a single fit-out. We scope each engagement to the actual work rather than a day rate. The zero-cost pilot on one package lets you test the modelling standard and QA on a real deliverable before committing.