Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Mixed-use and transit-adjacent packages produced to your ILS and templates, so a lean studio documents like a practice several times its size.
Explore Build-sideTrade coordination and shop drawings for dense, rail-constrained sites, where logistics and phasing around live infrastructure shape the programme.
Explore Owner-sideConsistent information across mixed portfolios of new build, retail and residential, with handover data that holds up in operation.
ExploreCentral-hub programmes rarely pause for recruitment. A delivered team keeps pace.
Station-district densification and mixed-use development move faster than a studio can responsibly hire. 260+ engineers working to your ILS and your BEP, expanding and contracting with your project pipeline instead of your payroll.




























From station-district blocks to mixed-use developments, every deliverable clears the same QA gates and the same ISO 19650 baseline.

Full-discipline modelling coordinated and issued as packages your site team can build from directly, held to your information delivery specification.
Explore service
4D sequencing for constrained, transport-adjacent sites, and 5D cost that keeps mixed-use budgets honest through design development.
Explore service
CDE operation, naming discipline and exchange management to ISO 19650, so a compact studio gets big-office information governance without hiring for it.
Explore
Asset models with structured handover data, built for owners who will run these mixed-use buildings for decades.
Explore
Quantities from the coordinated model, so cost discussions across repeated unit types stay grounded in one number set.
Explore
Scan to BIM for the reuse pipeline, from historic centre fabric to post-war stock measured into reliable models.
ExploreEight capabilities from a single team, matched to each commission rather than to a retainer.
Architecture, structure and MEP modelled and federated to one standard, from compact infill plots to full mixed-use blocks.
Custom Revit content to your naming and parameter conventions, so families drop into your project environment without rework.
4D logistics simulation for tight sites, 5D cost per unit type, and 6D data where your operators request it.
Shop drawings coordinated in the model first, so installation on constrained, transport-adjacent sites goes to plan.
Point clouds of existing buildings processed into as-built models accurate enough to design conversions on.
Old drawing sets rebuilt as intelligent models, giving reuse and refurbishment projects a dependable starting point.
Structured handover data for mixed-use and residential operators, ready for CAFM import on day one.
Model-based take-off across repeated unit types, where small measurement errors multiply across hundreds of units.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Skip the gates and a lean team pays twice: rework eats the fee, coordination errors surface during installation, and handover data needs rebuilding. On JES projects the three-signature rule on every file is what keeps your margin intact, and the record of who authored, checked and approved each one travels with the file.
Residential towers, transit systems and resort programmes coordinated to ISO 19650 in the Gulf. A zero-cost pilot lets you test the method on one package and run our files through your own checkers.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseDocumentation issued to programme from a coordinated model, so your permit deadlines and contractor mobilisations stop competing.
Live dashboards carry each file's author, checker and approver, so a compact office never burns hours on supplier management.
ISO 19650 stood up from project start, proportionate to the project rather than imposed as bureaucracy.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. JES produces the discipline models, drawings and coordination, and governs the standards: your BEP, CDE and the Author-Checker-Approver gate on every file. A compact studio gets big-office information governance without hiring for it, so you have one accountable team rather than a consultancy that advises and a shop that draws.
Yes. We embed as your outsourced BIM team under one delivery lead, producing to your ILS and your BEP, with 260+ engineers behind the work. Capacity expands and contracts with your pipeline, so station-district densification no longer moves faster than a studio can responsibly hire.
Yes. Our BIM consultants embed in your delivery, work to your ILS and your BEP, and hold every discipline to ISO 19650 through the CDE. One named lead stays accountable across the programme, so the standard is administered as mixed-use work runs rather than assumed and audited late on a transport-adjacent site.
Yes. We run scan to point cloud to record model for the reuse pipeline, measuring historic-centre fabric and post-war stock into a verified base. Every discipline coordinates against that record, so a conversion near the station district designs against the building that stands rather than drawings that no longer match it.
Architectural, structural and MEP, authored in Revit and federated in Navisworks on regular clash cycles for dense, rail-constrained sites. Every file is authored, checked and approved against your BEP before issue, where phasing around live infrastructure shapes the programme. You receive packages your site team can build from directly.
Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the work rather than a flat day rate. A rail-constrained mixed-use scheme carries more than a single block. Test the method first on a zero-cost pilot for one package and run our files through your own checkers.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.