Federated BIM model, mixed-use development

Systematized BIM services in Hong Kong.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Hong Kong tenders move quickly from award to mobilisation. JES starts production within the week.

Retrofit towers, station works and constrained sites leave no room for a slow BIM ramp-up. Brief JES this week and production is running the next. The Dubai floor overlaps your afternoon, then keeps producing after your office closes.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Every capability, one supplier interface

Eight services from one floor, so a Hong Kong programme never adds a vendor to fill a capability gap.

  • 3D BIM modelling

    Revit production across architecture, structure and MEP, one standard from basement plant to rooftop refuge floors.

  • Revit family creation

    Custom Revit families to your library standard, from facade modules to chiller plant, at the LOD the project specifies.

  • 4D, 5D and 6D simulation

    4D sequencing for tight site logistics, 5D cost loading and 6D performance data where required.

  • Shop drawings & detailing

    Shop drawings coordinated against the federated model before issue, fit for fabrication in a market that builds fast.

  • Scan to BIM

    Point clouds processed into reliable existing-condition models for the retrofit pipeline running through older towers.

  • CAD to BIM conversion

    Decades of 2D archives rebuilt as coordinated models, giving ageing buildings a usable digital base.

  • BIM for facility management

    COBie-structured handover data, ready for the CAFM systems running high-density portfolios.

  • Quantity take-off & BOQ

    Model-based take-offs aligned to your cost codes, defensible from tender through final account.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without that gate, coordination fails in ceiling voids, programmes slip on constrained sites, and record models never match the tower. On Hong Kong's schedules those costs arrive immediately. JES files don't carry them, because each one passes Author-Checker-Approver review before issue.

Proven on dense, vertical work

Metro MEP coordination, high-rise resort towers and airport packages across the Gulf, delivered to ISO 19650 at programme pace.

View all

Common questions about BIM in Hong Kong

Both. We produce the models and drawings, and we govern the BEP, CDE and the Author-Checker-Approver gate on one programme. A single delivery lead owns both, so you are not appointing a consultancy to advise and a shop to draw. One ISO 19650 standard holds across every package, whichever side of the harbour it sits.

Yes. A named lead runs your work as an outsourced BIM team you brief this week and have producing the next, backed by 260+ engineers whose afternoon overlaps yours. The Dubai floor keeps producing after your office closes, and capacity scales with the programme, so retrofit and station works get no slow ramp-up.

Yes. Our BIM consultants embed in your delivery, author the BEP and hold the work to ISO 19650 and the CIC BIM standards that set the local baseline. One named lead stays accountable across the programme, with the Dubai floor producing after your office closes so mobilisation keeps pace with a fast tender.

Yes. We run laser scan to registered point cloud to a coordinated record model for the retrofit pipeline running through the older towers. Every discipline coordinates against that verified base, so refurbishment starts from what exists rather than what was drawn, which matters where services share minimal ceiling void.

Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles, dense enough for floors where services share minimal ceiling void. We coordinate congested vertical sites, checked and approved against the BEP, resolved in the federated model before hoisting begins on a constrained site.

Cost follows scope, disciplines, the LOD you set and programme length, so we scope each engagement to the work rather than a flat day rate. A retrofit tower carries far more than a single fit-out. A zero-cost pilot on one package is the risk-free way to see the output and QA first.