Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Production packages for towers, interiors and infrastructure, built to your standards and your sheet conventions in a market where CIC BIM standards set the baseline.
Explore Build-sideMulti-trade coordination and shop drawings for congested vertical sites, resolved in the federated model before hoisting begins.
Explore Owner-sideOne information standard across your project teams, so portfolio assets hand over with structured data rather than scattered files.
ExploreHong Kong tenders move quickly from award to mobilisation. JES starts production within the week.
Retrofit towers, station works and constrained sites leave no room for a slow BIM ramp-up. Brief JES this week and production is running the next. The Dubai floor overlaps your afternoon, then keeps producing after your office closes.




























Every service runs through the same QA gates, ERP tracking and ISO 19650 baseline, whichever side of the harbour the project sits.

Architecture, structure and MEP modelled and federated to construction tolerance, dense enough for floors where services share minimal ceiling void.
Explore service
4D sequencing for constrained sites and 5D cost analysis on the model, so logistics and budget risk surface before mobilisation.
Explore service
CDE management, naming and exchanges to ISO 19650, holding one information structure across consultants, contractors and subcontractors.
Explore
Asset models for high-density buildings, with operational data structured for the FM teams who will run them for decades.
Explore
Quantities from the coordinated model mapped to your cost breakdown, one number across tender, procurement and variation.
Explore
Laser scan to record model across ageing stock and live sites, so retrofit starts from what exists rather than what was drawn.
ExploreEight services from one floor, so a Hong Kong programme never adds a vendor to fill a capability gap.
Revit production across architecture, structure and MEP, one standard from basement plant to rooftop refuge floors.
Custom Revit families to your library standard, from facade modules to chiller plant, at the LOD the project specifies.
4D sequencing for tight site logistics, 5D cost loading and 6D performance data where required.
Shop drawings coordinated against the federated model before issue, fit for fabrication in a market that builds fast.
Point clouds processed into reliable existing-condition models for the retrofit pipeline running through older towers.
Decades of 2D archives rebuilt as coordinated models, giving ageing buildings a usable digital base.
COBie-structured handover data, ready for the CAFM systems running high-density portfolios.
Model-based take-offs aligned to your cost codes, defensible from tender through final account.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without that gate, coordination fails in ceiling voids, programmes slip on constrained sites, and record models never match the tower. On Hong Kong's schedules those costs arrive immediately. JES files don't carry them, because each one passes Author-Checker-Approver review before issue.
Metro MEP coordination, high-rise resort towers and airport packages across the Gulf, delivered to ISO 19650 at programme pace.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseClash-resolved drawings issued from the federated model against your programme, so site teams build instead of querying.
Author-Checker-Approver sign-off on every file with live ERP dashboards, so status is visible without a request.
ISO 19650 in place from setup, with EIR, BEP and CDE established before the first model file and structured for audit.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models and drawings, and we govern the BEP, CDE and the Author-Checker-Approver gate on one programme. A single delivery lead owns both, so you are not appointing a consultancy to advise and a shop to draw. One ISO 19650 standard holds across every package, whichever side of the harbour it sits.
Yes. A named lead runs your work as an outsourced BIM team you brief this week and have producing the next, backed by 260+ engineers whose afternoon overlaps yours. The Dubai floor keeps producing after your office closes, and capacity scales with the programme, so retrofit and station works get no slow ramp-up.
Yes. Our BIM consultants embed in your delivery, author the BEP and hold the work to ISO 19650 and the CIC BIM standards that set the local baseline. One named lead stays accountable across the programme, with the Dubai floor producing after your office closes so mobilisation keeps pace with a fast tender.
Yes. We run laser scan to registered point cloud to a coordinated record model for the retrofit pipeline running through the older towers. Every discipline coordinates against that verified base, so refurbishment starts from what exists rather than what was drawn, which matters where services share minimal ceiling void.
Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles, dense enough for floors where services share minimal ceiling void. We coordinate congested vertical sites, checked and approved against the BEP, resolved in the federated model before hoisting begins on a constrained site.
Cost follows scope, disciplines, the LOD you set and programme length, so we scope each engagement to the work rather than a flat day rate. A retrofit tower carries far more than a single fit-out. A zero-cost pilot on one package is the risk-free way to see the output and QA first.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.