Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design production and tender documentation to the BEP your client mandates, whether the project sits in Lahore or the client sits in Riyadh.
Explore Build-sideCoordination and shop drawing output at the pace Gulf-funded sites demand, with clashes closed in the federated model before work begins.
Explore Owner-sideInformation governance over your full supply chain, so every consultant and contractor on the scheme delivers to a single named standard.
ExploreGulf contracts assume a delivery system behind the bid. JES supplies that system.
Firms in Karachi, Lahore and Islamabad win work from Gulf clients whose information requirements are contractual and audited. 260+ engineers, ISO 19650 built into the workflow and an evidence trail on every file put that delivery system behind your projects without a single new hire.




























One QA regime covers everything we issue: gated review by named engineers, ERP tracking and ISO 19650 from setup, the same terms our Gulf clients hold us to.

Modelling, federation and clash resolution across all disciplines, issued at construction tolerance with coordination already complete.
Explore service
4D programme and 5D cost simulation that test the plan in the model, while corrections carry no site cost.
Explore service
CDE administration, naming discipline and exchange control run for you, so the BEP holds across every party on the project.
Explore
Asset information models with CAFM-ready data, structured for the operator who takes over the building.
Explore
Model-based quantities mapped to your measurement system, so the commercial team works from a single dataset.
Explore
Point cloud to record model documentation of the asset as built, with deviation flagged before it becomes a dispute.
ExploreThe full BIM scope from one organisation, so a Pakistani firm scales delivery for a Gulf client without growing its vendor list.
Discipline modelling in Revit, Civil 3D and Navisworks under a single standard, from villa clusters to infrastructure.
Revit families produced to your LOD specification and library conventions, consistent across every package.
4D sequencing, 5D cost linkage and 6D performance data where the project justifies them.
Shop drawings checked against the federated model and issued at construction tolerance, fabrication-ready.
Scan to BIM modelling for existing structures, from heritage stock to operating industrial sites.
Legacy CAD libraries converted into coordinated 3D models, delivered back ready for design use.
FM-ready asset data structured into the handover model for direct CAFM import.
Take-off generated from the model and aligned to your BOQ structure, consistent across packages.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Skip the gate and the costs are familiar: missed deadlines, clashing trades, audit non-conformance and handover folders that go straight to archive. JES deliverables ship with named Author-Checker-Approver sign-off, the record that supports repeat work with Gulf clients.
Dubai metro MEP, Saudi giga-projects and island resorts, delivered for the same client pool many Pakistani firms bid into.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseIssue-ready packages produced from a federated, clash-resolved model and released against the agreed programme.
Live ERP dashboards plus a named author, checker and approver on every file, so your team sees status directly.
EIR, BEP and CDE established at kickoff, so ISO 19650 compliance is built into the project from the start.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models and coordination, and we govern the BEP, CDE and the Author-Checker-Approver gate on one programme, the same terms our Gulf clients hold us to. A single delivery lead owns both, so you are not appointing a consultancy to advise and a shop to draw. One standard holds across every package.
Yes. A named lead runs your work as an outsourced BIM team backed by 260+ engineers, with ISO 19650 built into the workflow and an evidence trail on every file. Capacity scales with the programme, so firms winning audited Gulf work deliver to those information requirements without a single new hire on the payroll.
Yes. Our BIM consultants embed in your delivery, author the BEP and work with ISO 19650 built into the workflow and an evidence trail on every file. One named lead holds the work to the BEP your client mandates across the programme, whether the project sits in Lahore or the client sits in Riyadh.
Yes. We run laser scan to registered point cloud to a coordinated record model for existing structures, from heritage stock through to operating industrial sites. Every discipline coordinates against that verified base, with deviation flagged before it becomes a dispute, so the record documents the asset as it actually stands.
Architectural, structural and MEP. We author them in Revit and federate them in Navisworks with regular clash cycles. We coordinate output at the pace Gulf-funded sites demand, checked and approved against the BEP, with clashes closed in the federated model before work begins, so audit non-conformance never surfaces on site.
Cost follows scope, disciplines, the LOD you set and programme length, so we scope each engagement to the work rather than a flat day rate. An audited Gulf package carries far more than a single home project. A zero-cost pilot on one package is the risk-free way to see the output and QA first.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.