Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design and production packages built to your standards and the submission discipline Singapore practice demands, while your team stays on design and client work.
Explore Build-sideMulti-trade coordination and shop drawings resolved in the federated model before they reach a Singapore site, sequenced to your programme.
Explore Owner-sideOne information standard enforced across consultants and contractors, so every asset hands over with structured, usable data.
ExploreSingapore has required BIM on submissions for years. JES delivers to that standard.
Years of CORENET-era mandates have made structured BIM the baseline of Singapore practice. Every JES deliverable passes a named Author-Checker-Approver gate before issue. Dubai runs four hours behind Singapore, so a query raised after lunch is answered inside the same working day.




























Every service runs the same QA gates and the same ERP traceability, with Dubai's working day overlapping your afternoon.

Multidiscipline modelling, federation and documentation issued to construction tolerance, with the consistency a mandate-mature market expects.
Explore service
4D sequencing and 5D cost analysis on the live model, surfacing programme and budget risk while it is still cheap to act on.
Explore service
CDE governance, naming and exchange workflows run to ISO 19650, so the EIR and BEP hold on site and at submission.
Explore
Asset models structured for dense, long-life buildings: operational data at handover that an FM team can run with immediately.
Explore
Quantities from the coordinated model mapped to your cost codes, keeping tender, procurement and variations on one number.
Explore
Laser scan to record model for existing and completed work, so the record set matches the building, not the intent.
ExploreThe full BIM scope from one floor, with a working day that overlaps yours from noon.
Revit production across architecture, structure and MEP, one modelling standard from basement carparks to tower crowns.
Custom Revit families to your template and LOD specification, from precast components to AHU assemblies.
4D sequencing, 5D cost loading and 6D performance data where the project brief requires it.
Shop drawings coordinated against the federated model before issue, so fabrication and installation run off settled geometry.
Point clouds processed into accurate existing-condition models for retrofit work across mature building stock.
Legacy 2D drawings rebuilt as coordinated 3D models, giving older assets a dependable digital record.
COBie-structured asset data at handover, ready for the building's CAFM system from the first day of operation.
Model-based quantity take-off aligned to your cost plan, one quantity set across the project's commercial life.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
When that gate is missing, submissions bounce, coordination errors surface during fit-out, and handover data fails the employer's information requirements. In a market this regulated, those failures are found quickly. JES files carry their Author-Checker-Approver trail as standard.
Metro MEP packages, airport programmes and museum structures across the Gulf, handed over to ISO 19650. The same delivery standard now serves Singapore teams.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseDrawings issued from a federated, clash-free model against your programme, ready for submission rather than another internal pass.
Author-Checker-Approver on every file, with ERP dashboards that put each deliverable's position one glance away.
EIR, BEP and CDE structured to ISO 19650 before modelling starts, so compliance is built in, not bolted on.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models and documentation, and we govern the BEP, CDE and the Author-Checker-Approver gate on one programme. A single delivery lead owns both, so you are not appointing a consultancy to advise and a shop to draw. In a market where structured BIM is the baseline, one standard holds across every package.
Yes. A named lead runs your work as an outsourced BIM team four hours behind Singapore, backed by 260+ engineers whose day overlaps your afternoon. A query raised after lunch is answered inside the same working day, and capacity scales with the programme, so mandate-mature submissions keep moving without a permanent local bench.
Yes. Our BIM consultants embed in your delivery, author the BEP and hold the work to ISO 19650, so the EIR and BEP govern the job on site and at submission. One named lead stays accountable across the programme, and every deliverable passes the named Author-Checker-Approver gate before issue in this regulated market.
Yes. We run laser scan to registered point cloud to a coordinated record model for the retrofit work across mature building stock. Every discipline coordinates against that verified base, so the record set matches the building rather than the intent, which matters where submissions are checked closely against reality.
Architectural, structural and MEP, authored in Revit and federated in Navisworks with regular clash cycles. We coordinate multi-trade packages, checked and approved against the BEP, resolved in the federated model before they reach a Singapore site. Coordination errors settle before fit-out rather than bouncing a submission in a heavily regulated market.
Cost follows scope, disciplines, the LOD you set and programme length, so we scope each engagement to the work rather than a flat day rate. A regulated submission package carries far more than a standard one. A zero-cost pilot on one package is the risk-free way to see the output and QA first.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.