Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Institutional and civic packages produced to your ILS and templates, structured for public clients who check every deliverable line by line.
Explore Build-sideCoordinated construction models and shop drawings for services-dense public buildings, where a plant room or a secure ceiling void is its own coordination project.
Explore Owner-sideOne information standard across public and mixed-use portfolios, with handover datasets your operators and their asset systems accept at first review.
ExploreGovernment clients review deliverables against the brief. Our files arrive with the evidence.
Ministries, courts and civic buildings carry documentation requirements that consume unprepared teams. 260+ engineers, every file carrying an Author-Checker-Approver record, so your compliance evidence accumulates while the project runs instead of being assembled the night before the review.




























Every service runs to ISO 19650 with ERP traceability from setup to handover, the posture government procurement expects to see.

Discipline models and drawing sets for institutional buildings, coordinated before issue and documented at every gate.
Explore service
4D and 5D on the federated model, so phasing around live civic and government operations is planned rather than improvised.
Explore service
Information management with the documentation depth public frameworks require: CDE, naming, exchanges and audit trail defined and kept.
Explore
Asset models for buildings that must run without interruption, with structured operational data for institutional FM from handover.
Explore
Model-based quantities that hold up under public-procurement scrutiny, traceable from cost line to element.
Explore
Scan to record model for older government stock, documenting buildings whose drawings stopped being accurate decades ago.
ExploreThe full BIM scope from one team, so your ministries, courts and civic buildings keep a single point of accountability.
Multidiscipline Revit production for services-dense public buildings, federated in Navisworks and clash-managed throughout design.
Technical and architectural Revit content built to your specification, naming and parameter standard.
4D phasing for live-environment construction, 5D cost for public budgets, and 6D data where your operator requires it.
Shop drawings for MEP-heavy installations, coordinated in the model before they reach site, at installation tolerance.
Existing institutional buildings scanned and modelled, giving renovation projects an accurate base to design against.
Paper and 2D archives from long-lived public institutions rebuilt as coordinated, queryable models.
Handover data structured for institutional CAFM systems, validated before delivery rather than after complaints.
Quantities from the coordinated model in the structure public procurement expects, with the source element behind every figure.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Skip the gate and institutional work exposes every weakness: review comments multiplying, compliance evidence missing, programme slipping while documents are reassembled. On JES projects the evidence is produced as a by-product of doing the work properly, because every file carries an Author-Checker-Approver trail you can put in front of the client.
Museums, metro systems and civic programmes coordinated to ISO 19650 in the Gulf under formal supervision, the Zayed National Museum among them. Run our files through your own checkers on a zero-cost pilot.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the casePackages issued to programme from a coordinated model, formatted for reviewers who check structure before they check content.
Three signatures and a dashboard entry per file, so your reporting to public clients takes an export, not an afternoon.
ISO 19650 from setup with the paper trail institutional audits expect, generated continuously rather than reconstructed at the end.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. JES produces the discipline models and drawing sets, and governs the standards: BEP, CDE and the Author-Checker-Approver gate on every file, tracked in ERP from setup to handover. Government procurement expects that posture, so you get production and governance from one accountable team rather than a consultancy that advises and a shop that draws.
Yes. We embed as your outsourced BIM team under one delivery lead on ministry and court packages, backed by 260+ engineers. Every file carries its Author-Checker-Approver record, so a secure government building's documentation no longer overruns your technical office and capacity scales with the programme rather than a permanent hire.
Yes. Our BIM consultants embed in your delivery, define the CDE, naming, exchanges and audit trail public frameworks require, and hold every discipline to ISO 19650. Before the first paid package we run our files through your own checkers on a zero-cost pilot, so one named lead proves the standard against your review before you commit.
Yes. We run scan to point cloud to record model on a standing ministry or court building, documenting stock whose drawings stopped being accurate decades ago. Every discipline coordinates against that verified base, so a secure-building renovation designs against what actually stands rather than an outdated record.
Architectural, structural and MEP. We author them in Revit and federate them in Navisworks on regular clash cycles. Every file is authored, checked and approved against your BEP before issue, so a plant room or a secure ceiling void is coordinated as its own project, the way a court or ministry fit-out demands.
Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the work rather than a flat day rate. A secure court building carries more than a standard office. Run our files through your own checkers first on a zero-cost pilot for one package before any budget commitment.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.