Federated BIM model, mixed-use development

Systematized BIM services in The Hague.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Government clients review deliverables against the brief. Our files arrive with the evidence.

Ministries, courts and civic buildings carry documentation requirements that consume unprepared teams. 260+ engineers, every file carrying an Author-Checker-Approver record, so your compliance evidence accumulates while the project runs instead of being assembled the night before the review.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Every capability, one accountable supplier

The full BIM scope from one team, so your ministries, courts and civic buildings keep a single point of accountability.

  • 3D BIM modelling

    Multidiscipline Revit production for services-dense public buildings, federated in Navisworks and clash-managed throughout design.

  • Revit family creation

    Technical and architectural Revit content built to your specification, naming and parameter standard.

  • 4D, 5D and 6D simulation

    4D phasing for live-environment construction, 5D cost for public budgets, and 6D data where your operator requires it.

  • Shop drawings & detailing

    Shop drawings for MEP-heavy installations, coordinated in the model before they reach site, at installation tolerance.

  • Scan to BIM

    Existing institutional buildings scanned and modelled, giving renovation projects an accurate base to design against.

  • CAD to BIM conversion

    Paper and 2D archives from long-lived public institutions rebuilt as coordinated, queryable models.

  • BIM for facility management

    Handover data structured for institutional CAFM systems, validated before delivery rather than after complaints.

  • Quantity take-off & BOQ

    Quantities from the coordinated model in the structure public procurement expects, with the source element behind every figure.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Skip the gate and institutional work exposes every weakness: review comments multiplying, compliance evidence missing, programme slipping while documents are reassembled. On JES projects the evidence is produced as a by-product of doing the work properly, because every file carries an Author-Checker-Approver trail you can put in front of the client.

Delivered for institutional clients

Museums, metro systems and civic programmes coordinated to ISO 19650 in the Gulf under formal supervision, the Zayed National Museum among them. Run our files through your own checkers on a zero-cost pilot.

View all

Common questions about BIM in The Hague

Both. JES produces the discipline models and drawing sets, and governs the standards: BEP, CDE and the Author-Checker-Approver gate on every file, tracked in ERP from setup to handover. Government procurement expects that posture, so you get production and governance from one accountable team rather than a consultancy that advises and a shop that draws.

Yes. We embed as your outsourced BIM team under one delivery lead on ministry and court packages, backed by 260+ engineers. Every file carries its Author-Checker-Approver record, so a secure government building's documentation no longer overruns your technical office and capacity scales with the programme rather than a permanent hire.

Yes. Our BIM consultants embed in your delivery, define the CDE, naming, exchanges and audit trail public frameworks require, and hold every discipline to ISO 19650. Before the first paid package we run our files through your own checkers on a zero-cost pilot, so one named lead proves the standard against your review before you commit.

Yes. We run scan to point cloud to record model on a standing ministry or court building, documenting stock whose drawings stopped being accurate decades ago. Every discipline coordinates against that verified base, so a secure-building renovation designs against what actually stands rather than an outdated record.

Architectural, structural and MEP. We author them in Revit and federate them in Navisworks on regular clash cycles. Every file is authored, checked and approved against your BEP before issue, so a plant room or a secure ceiling void is coordinated as its own project, the way a court or ministry fit-out demands.

Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the work rather than a flat day rate. A secure court building carries more than a standard office. Run our files through your own checkers first on a zero-cost pilot for one package before any budget commitment.