Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Production capacity matched to your project list, so a rebuild package or a private development never forces a permanent hire in a stretched market.
Explore Build-sideTrade coordination and shop drawing volume absorbed offshore, with clashes resolved in the model before they cost time on a Beirut site where every input is dear.
Explore Owner-sideA single information standard enforced across your consultants and contractors, so every asset on your Beirut plots hands over with data your operations team can actually use.
ExploreRebuild and private development in the city need capacity without the standing payroll.
A stretched market makes a permanent BIM department hard to justify, yet Beirut's rebuild schemes and private developments still demand modellers, coordinators and information managers. JES adds a full production and coordination team of 260+ engineers, billed against the packages you send rather than held on your payroll between projects.




























The full JES scope reaches Beirut through one ERP-tracked, ISO 19650 pipeline, with the same checks on a rebuilt block as on a mixed-use development.

Coordinated models and construction drawings produced to your BEP across all disciplines, checked before they reach your reviewers.
Explore service
4D and 5D modelling that shows a project its programme and cost exposure while both can still be changed cheaply.
Explore service
CDE and exchange management run by people who do nothing else, keeping your BEP operational across every supplier on a scheme.
Explore
Operational asset models with structured data at handover, built for the FM contract that starts the day construction ends.
Explore
Quantity take-off from the coordinated model, aligned to your cost structure so tender and variation use the same numbers.
Explore
Scan-verified as-builts and record modelling that document what was actually built and what stands of existing structures, not what was once drawn.
ExploreThe whole BIM scope delivered into Beirut from one team, so a programme never waits on a second supplier.
Architectural, structural and MEP modelling in Revit and Navisworks, run to a single modelling standard your reviewers learn once.
Office-standard Revit families built to your specification and LOD, from joinery profiles to plant-room equipment.
Construction sequencing and cost simulation for projects where the opening date is fixed before the design is finished.
Coordinated shop drawings at the level of detail the city's fit-out and MEP trades install from, checked against the federation before they leave JES.
Scan to BIM for Beirut's rebuild and refurbishment work, converting existing buildings into accurate working models.
Older 2D drawing sets reconstructed as coordinated models, so legacy assets join the current standard.
CAFM-aligned handover data that lets facilities teams operate the building from the model immediately.
BOQs measured from coordinated geometry, keeping commercial discussions anchored to one set of numbers.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without the gate, a tight budget feels every weakness: senior staff checking junior work after hours, rework consuming margin on fee-sensitive jobs, and information gaps surfacing at handover or audit. JES issues every file with its Author-Checker-Approver record, so the discipline is documented, not asserted.
Towers, transit packages and resort programmes delivered in the Gulf on tight schedules, run on the same ISO 19650 system a rebuild or development programme needs. A sample below.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the casePackages arrive coordinated and submission-ready, paced to your Beirut programme rather than to a supplier's backlog.
ERP dashboards replace the follow-up email, so your project managers see deliverable status at any point in the day.
ISO 19650 structure from kick-off: EIR response, BEP, CDE and naming conventions in place before the first model is opened.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the Author-Checker-Approver gate. One accountable team carries the work, not a consultancy advising beside a shop that draws. Your architects keep the design of the city's fabric while we supply the production and the standards behind it.
Yes. A delivery lead owns your programme, backed by 260+ engineers, and we take on the modelling one commission at a time so a boutique practice can win a mixed-use or hospitality development it could not otherwise resource. Capacity turns on for the award and off afterward. Nothing sits idle on a payroll between projects.
Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. A tight-plot Beirut development gets full coordination without adding a standing BIM function to a small studio. Your reviewers direct the project rather than chase file uploads.
Yes. We run laser scan to point cloud to a coordinated record model, which matters most on Beirut's older and heritage-street buildings where drawings rarely survived or matched. That verified base is what every discipline coordinates against, so restoration and infill design work from the fabric that actually stands rather than an assumption.
Architectural, structural and MEP. We author them in Revit and federate them in Navisworks on regular clash cycles for tight urban plots. Every file is authored, checked and approved against the BEP before issue, so on a site wedged between neighbours the trade conflicts are settled in the model rather than discovered during the build.
Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. A hospitality development carries more than a single apartment infill. A zero-cost pilot on one package lets you see the output and the QA gate before you commit on a fee-tight job.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.