Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design development and tender documentation produced to your BEP and to the drawing conventions your client expects. Your studio keeps design direction; we carry production volume.
Explore Build-sideTrade coordination and shop drawings for stadium, hospitality and infrastructure work, resolved in the federated model before steel is cut or ducts are hung.
Explore Owner-sideA single information standard across mixed consultant teams, local and international, so your portfolio's data reads the same whichever firm produced it.
ExploreStadium, rail and hotel programmes are all peaking at once. Capacity on demand keeps them on programme.
Stadiums, rail upgrades, hotels and new urban districts are landing on a market still building its BIM bench. 260+ engineers and one delivery system give Moroccan and international teams production depth on demand, with no recruitment race and no drop in standard between packages.




























Whether the site is in Casablanca, Rabat or Tangier, every deliverable moves through the same QA gates, the same ERP tracking and the same ISO 19650 baseline.

Full-discipline modelling and coordination issued to construction tolerance, so packages arrive on site already reconciled against each other.
Explore service
Programme rehearsed in 4D and cost tested in 5D before mobilisation, while a sequencing mistake is still a model edit rather than a claim.
Explore service
We set up and run the CDE, the naming and the information exchanges, so the standards in your BEP are applied on every package across the project.
Explore
Asset models structured for operations, carrying CAFM-ready data into handover so the operator starts with complete information.
Explore
Model-derived quantities aligned to your cost plan, so the BOQ, the procurement schedule and the variation log work from one dataset.
Explore
Laser scanning processed into record models that match the building as constructed, with deviation caught early in the build.
ExploreThe whole BIM scope from one team in Jebel Ali, so a Moroccan programme adds capacity without adding a vendor-management workload.
Multi-discipline production in Revit, Civil 3D and Navisworks, held to one modelling standard across every package.
Custom Revit families to your specification and LOD requirement, from architectural detail to plant and equipment.
4D sequencing for programme certainty, 5D for cost control and 6D performance data where the brief calls for it.
Fabrication-ready shop drawings checked against the coordinated model before they reach a site office.
Scan to BIM for existing buildings entering refurbishment, with point clouds converted into reliable as-built geometry.
CAD to BIM conversion that turns flat legacy drawings into coordinated, queryable 3D models.
Facilities data built into the model and structured for CAFM import, ready for the operations team at handover.
Quantity take-off generated from the model and mapped to your cost codes, keeping commercial and technical teams on one dataset.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without that discipline, a fast-scaling market produces the same failures faster: packages slipping behind programme, uncoordinated drawings meeting on site and handover data nobody can operate from. JES files carry an Author-Checker-Approver trail, so quality questions are settled by the record.
Resort, transport and giga-project packages delivered across the UAE and Saudi Arabia under the system now offered to Moroccan projects. A selection below.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseDrawings released from a clash-checked federated model on the dates the programme names.
Named author, checker and approver on every file, with ERP visibility down to the deliverable. Your managers manage the project rather than the supplier.
ISO 19650 applied from kickoff: EIR, BEP and CDE stood up before modelling starts, so the audit finds structure already in place.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the gate. One accountable team carries the standard, rather than a consultancy that advises beside a shop that draws. You get production and governance from a single delivery lead.
Yes. A delivery lead owns your programme, backed by 260+ engineers on one system, so stadium and rail packages get capacity without a recruitment race. The team scales up and down against the programme, with no permanent hire in a market still building its bench. Standards hold steady from one package to the next.
Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead across the whole programme. Because everyone runs on one delivery system, there is no drop in standard between packages. Your studio keeps design direction while we carry production volume.
Yes. We run scan to point cloud to a coordinated record model for existing buildings entering refurbishment. That verified base is what each discipline coordinates against, so the geometry matches what actually stands. It gives refurbishment work a reliable starting point rather than assumptions from old drawings.
We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. On stadium, hospitality and infrastructure work, clashes are resolved in the federated model before steel is cut or ducts are hung.
Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. A stadium package carries more than a single hotel. A zero-cost pilot on one package lets you see the output and the QA before you commit anything further.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.