Federated BIM model, mixed-use development

Systematized BIM services in Syria.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Early reconstruction needs modelling capacity before the market can rebuild it.

The engineers, coordinators and information managers a national rebuild will consume cannot be hired at the pace the programme demands, and much of that skill base has to be rebuilt alongside the country. JES brings a delivered team of 260+ engineers to the work, so a masterplan, a housing scheme or an infrastructure package runs on a proven system from day one instead of waiting on recruitment.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Every capability, none of the overhead

The whole BIM scope from one team, so adding a service never means onboarding another supplier mid-programme.

  • 3D BIM modelling

    Full-discipline Revit production with Navisworks federation, run to a single modelling standard your reviewers learn once.

  • Revit family creation

    Office-standard Revit families authored to your graphics, parameters and LOD specification, from joinery to plant.

  • 4D, 5D and 6D simulation

    Sequencing, cost and performance data linked to the model, giving planners and commercial teams one model to work from.

  • Shop drawings & detailing

    Shop drawings detailed to fabrication tolerance and checked against the federation before they leave JES.

  • Scan to BIM

    Point clouds processed into as-built models, so existing and partially standing structures enter the programme as accurate, working models.

  • CAD to BIM conversion

    Flat 2D archives converted into coordinated 3D models, so legacy records and older assets get the same single source of truth as new work.

  • BIM for facility management

    Handover data structured for CAFM import, so a rebuilt asset has a working operating model before it is occupied.

  • Quantity take-off & BOQ

    Take-off straight from the coordinated model, mapped to your measurement rules and cost codes.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without that discipline the costs land where a reconstruction budget can least absorb them: a recurring modelling error multiplying across a programme, rework consuming scarce funding, and information gaps surfacing when a scheme is audited or handed to an operator. JES files clear three review stages before they reach your CDE, and the record of who authored, checked and approved each one travels with the file.

The record so far, on Gulf programmes

Towers, transit packages and resort programmes delivered in the Gulf on tight schedules, run on the same ISO 19650 system a reconstruction programme needs. A sample below.

View all

Common questions about BIM in Syria

Both. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the Author-Checker-Approver gate. One accountable team carries the work, not a consultancy that advises beside a shop that draws. For early reconstruction, that means production and standards start on a clean information base from the same delivery lead.

Yes. A delivery lead owns your programme, backed by 260+ engineers on one system, so a masterplan, housing or infrastructure package runs from day one rather than waiting on hiring. The engineers a national rebuild will consume cannot be recruited at the pace the work demands. We bring the team to the work and scale it against the programme.

Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. A masterplan or housing scheme joins a proven system while the local skill base is rebuilt alongside the country. Your reviewers govern the project rather than carry the modelling load.

Yes. We run laser scan to point cloud to a coordinated record model that documents what actually stands, including partially standing structures. That verified base is what every discipline coordinates against as existing fabric enters the programme. It gives reconstruction work accurate geometry rather than drawings that no longer match the ground.

We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. On reconstruction and new-build work alike, conflicts are resolved in the model before they reach a site where materials and access are constrained.

Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. A national masterplan carries more than a single housing scheme. A zero-cost pilot on one package lets you see the output and the QA gate before a reconstruction budget commits to more.