Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design and documentation production absorbed at peak load, modelled to your BEP, so your design leads stay on the architecture while the modelling volume lands on JES.
Explore Build-sideCoordination and shop drawings for the capital's civic and infrastructure builds, resolved in the model before your site team inherits the clash.
Explore Owner-sideA single information standard across the consultants and contractors on your Baghdad schemes, enforced rather than just written into the EIR.
ExploreCivic and infrastructure work in the capital moves faster than the hiring market behind it.
Public buildings, utilities and city infrastructure keep Baghdad's consultants and contractors at capacity, while the modellers, coordinators and information managers they need are scarce on the ground. JES adds a full production and coordination team of 260+ engineers, so a civic scheme or an infrastructure package joins a proven delivery system instead of waiting on recruitment.




























The full JES scope reaches Baghdad through one ERP-tracked, ISO 19650 pipeline, with the same checks on a civic building package as on a utilities scheme.

Coordinated models and construction drawings for civic and infrastructure work, issued to your submission calendar and checked before they reach your reviewers.
Explore service
4D and 5D modelling that shows a project its programme and cost exposure while both can still be changed cheaply.
Explore service
CDE and exchange management run by people who do nothing else, keeping your BEP operational across every supplier on a scheme.
Explore
Asset data and operational models prepared for the public bodies and operators who will run civic and infrastructure assets long term.
Explore
Quantity take-off from the coordinated model, aligned to your cost structure so tender and variation use the same numbers.
Explore
Scan-verified as-builts that give the capital's new and rebuilt buildings a record matching what was actually constructed.
ExploreThe whole BIM scope delivered into Baghdad from one team, so a programme never waits on a second supplier.
Architectural, structural, MEP and infrastructure modelling in Revit, Civil 3D and Navisworks, run to a single modelling standard.
Office-standard Revit families built to your specification and LOD, from architectural components to plant and equipment.
Construction sequencing and cost simulation for civic and infrastructure projects where the completion date is fixed before the design is finished.
Coordinated shop drawings at the level of detail the capital's trades install from, checked against the federation before they leave JES.
Scan to BIM for Baghdad's refurbishment and rebuild work, converting existing buildings into accurate working models.
Older 2D drawing sets reconstructed as coordinated models, so legacy civic and infrastructure assets join the current standard.
CAFM-aligned handover data that lets public facilities teams operate civic and infrastructure assets from the model immediately.
BOQs measured from coordinated geometry, keeping commercial discussions anchored to one set of numbers.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without the gate, a busy programme amplifies every weakness: late packages cascade through trades, rework consumes the margin, and compliance gaps surface exactly when a public client audits. JES issues every file with its Author-Checker-Approver record, so the discipline is documented, not asserted.
Metro lines, airport terminals, towers and resort programmes delivered in the Gulf on tight schedules, run on the same ISO 19650 system a civic or infrastructure programme needs. A sample below.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the casePackages arrive coordinated and submission-ready, paced to your Baghdad programme rather than to a supplier's backlog.
ERP dashboards replace the follow-up email, so your project managers see deliverable status at any point in the day.
ISO 19650 structure from kick-off: EIR response, BEP, CDE and naming conventions in place before the first model is opened.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the Author-Checker-Approver gate. One accountable team carries the work, not a consultancy advising beside a shop that draws. On civic and infrastructure packages you get production and standards from a single delivery lead.
Yes. A delivery lead owns your programme, backed by 260+ engineers on one system, so public-building and utilities work joins a proven pipeline rather than waiting on modellers who are scarce on the ground. Civic and infrastructure work in the capital keeps consultants at capacity. We add the production team to the package count and scale it against the programme.
Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. A civic scheme or infrastructure package runs on a proven system from day one, keeping your BEP operational across every supplier. Your design leads stay on the architecture while we carry the volume.
Yes. We run laser scan to point cloud to a coordinated record model for the capital's refurbishment and rebuild work. That verified base is what every discipline coordinates against, giving new and rebuilt buildings a record that matches what was actually constructed. It replaces uncertain existing drawings with geometry your team can build from.
We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model, across civic and infrastructure work. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. Conflicts are resolved in the federated model before your site team inherits them.
Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. An infrastructure package carries more than a single civic building. A zero-cost pilot on one package lets you see the output and the QA gate before a public programme commits further.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.