Federated BIM model, mixed-use development

Systematized BIM services in Baghdad.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Civic and infrastructure work in the capital moves faster than the hiring market behind it.

Public buildings, utilities and city infrastructure keep Baghdad's consultants and contractors at capacity, while the modellers, coordinators and information managers they need are scarce on the ground. JES adds a full production and coordination team of 260+ engineers, so a civic scheme or an infrastructure package joins a proven delivery system instead of waiting on recruitment.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Every capability, none of the overhead

The whole BIM scope delivered into Baghdad from one team, so a programme never waits on a second supplier.

  • 3D BIM modelling

    Architectural, structural, MEP and infrastructure modelling in Revit, Civil 3D and Navisworks, run to a single modelling standard.

  • Revit family creation

    Office-standard Revit families built to your specification and LOD, from architectural components to plant and equipment.

  • 4D, 5D and 6D simulation

    Construction sequencing and cost simulation for civic and infrastructure projects where the completion date is fixed before the design is finished.

  • Shop drawings & detailing

    Coordinated shop drawings at the level of detail the capital's trades install from, checked against the federation before they leave JES.

  • Scan to BIM

    Scan to BIM for Baghdad's refurbishment and rebuild work, converting existing buildings into accurate working models.

  • CAD to BIM conversion

    Older 2D drawing sets reconstructed as coordinated models, so legacy civic and infrastructure assets join the current standard.

  • BIM for facility management

    CAFM-aligned handover data that lets public facilities teams operate civic and infrastructure assets from the model immediately.

  • Quantity take-off & BOQ

    BOQs measured from coordinated geometry, keeping commercial discussions anchored to one set of numbers.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without the gate, a busy programme amplifies every weakness: late packages cascade through trades, rework consumes the margin, and compliance gaps surface exactly when a public client audits. JES issues every file with its Author-Checker-Approver record, so the discipline is documented, not asserted.

Delivered on Gulf infrastructure

Metro lines, airport terminals, towers and resort programmes delivered in the Gulf on tight schedules, run on the same ISO 19650 system a civic or infrastructure programme needs. A sample below.

View all

Common questions about BIM in Baghdad

Both. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the Author-Checker-Approver gate. One accountable team carries the work, not a consultancy advising beside a shop that draws. On civic and infrastructure packages you get production and standards from a single delivery lead.

Yes. A delivery lead owns your programme, backed by 260+ engineers on one system, so public-building and utilities work joins a proven pipeline rather than waiting on modellers who are scarce on the ground. Civic and infrastructure work in the capital keeps consultants at capacity. We add the production team to the package count and scale it against the programme.

Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. A civic scheme or infrastructure package runs on a proven system from day one, keeping your BEP operational across every supplier. Your design leads stay on the architecture while we carry the volume.

Yes. We run laser scan to point cloud to a coordinated record model for the capital's refurbishment and rebuild work. That verified base is what every discipline coordinates against, giving new and rebuilt buildings a record that matches what was actually constructed. It replaces uncertain existing drawings with geometry your team can build from.

We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model, across civic and infrastructure work. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. Conflicts are resolved in the federated model before your site team inherits them.

Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. An infrastructure package carries more than a single civic building. A zero-cost pilot on one package lets you see the output and the QA gate before a public programme commits further.