Federated BIM model, mixed-use development

Systematized BIM services in Cairo.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Cairo firms are winning GCC work. The delivery system is ready for it.

Contracts in Riyadh, Doha and Dubai write information requirements into the appointment and audit them. JES delivers to those requirements every day: 260+ engineers producing to ISO 19650 for Gulf clients, available to Cairo firms for exported work and home projects alike.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Eight capabilities, retrofit to new build

Retrofit work in the existing fabric and greenfield work in the new districts draw on the same eight capabilities, from one team.

  • 3D BIM modelling

    Full-discipline Revit, Civil 3D and Navisworks production, one standard whether the package is a refurbishment or a new build.

  • Revit family creation

    Revit family creation to your LOD and naming specification, covering facade systems through mechanical plant.

  • 4D, 5D and 6D simulation

    4D, 5D and 6D analysis layered onto the model where the programme, the budget or the operator needs the data.

  • Shop drawings & detailing

    Construction-tolerance shop drawings, coordinated against the federated model before the site office sees them.

  • Scan to BIM

    Scan to BIM for existing stock: point clouds turned into as-built models accurate enough to design against.

  • CAD to BIM conversion

    Decades of 2D drawings rebuilt as coordinated 3D models, so refurbishment starts from verified geometry.

  • BIM for facility management

    CAFM-ready asset data delivered with the model, so operations begins at handover with complete records.

  • Quantity take-off & BOQ

    Model-driven quantity take-off tied to your cost codes, keeping estimators, buyers and the model in agreement.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without the gate, the costs are predictable: missed issue dates, on-site clashes, failed information audits and handover folders nobody can work from. Every JES file ships with an Author-Checker-Approver trail, the record GCC contracts require.

Delivered where the standard is contractual

Hotels, metro packages and cultural landmarks across the UAE and Saudi Arabia, delivered under the same contractual information requirements Cairo firms now bid into.

View all

Common questions about BIM in Cairo

Both. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the Author-Checker-Approver gate. One accountable team carries the work, not a consultancy advising beside a shop that draws. You get production and governance from a single delivery lead, on exported and home work alike.

Yes. A delivery lead owns your programme, backed by 260+ engineers already producing to ISO 19650 for Gulf clients every day. That capacity is available to Cairo firms for exported packages and home projects, scaling against the programme with no permanent hire. You meet audited Gulf requirements without building the bench to match.

Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. They produce to the audited information requirements Riyadh, Doha and Dubai write into contracts. That standard travels to your exported work and your home projects alike.

Yes. We run scan to point cloud to a coordinated record model, essential on retrofit stock where archive drawings rarely match the building. That verified base is what every discipline coordinates against, so the geometry reflects as-built reality. It lets your team design against the building that stands, not the one once drawn.

We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. On tight urban and new-district sites, trade conflicts are resolved before excavation rather than after.

Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. An audited exported package carries more than a single home project. A zero-cost pilot on one package lets you see the output and the QA the GCC contract requires before you commit.