Federated BIM model, mixed-use development

Systematized BIM services in Lebanon.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Rebuild and private development need capacity without carrying the payroll.

A stretched market makes a permanent BIM department hard to justify, yet rebuild schemes and private development still demand modellers, coordinators and information managers. JES supplies that capacity as a delivered team of 260+ engineers, billed against the packages you send rather than held on your payroll between projects.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Every capability, none of the overhead

The whole BIM scope from one team, so adding a service never means onboarding another supplier mid-programme.

  • 3D BIM modelling

    Full-discipline Revit production with Navisworks federation, run to a single modelling standard your reviewers learn once.

  • Revit family creation

    Office-standard Revit families authored to your graphics, parameters and LOD specification, from joinery to plant.

  • 4D, 5D and 6D simulation

    Sequencing, cost and performance data linked to the model, giving planners and commercial teams one model to work from.

  • Shop drawings & detailing

    Shop drawings detailed to fabrication tolerance and checked against the federation before they leave JES.

  • Scan to BIM

    Point clouds processed into as-built models for rebuild, refurbishment and retrofit work across existing assets.

  • CAD to BIM conversion

    Flat 2D archives converted into coordinated 3D models, so existing buildings get the same single source of truth as new ones.

  • BIM for facility management

    Handover data structured for CAFM import, so the building's operating model exists before it is occupied.

  • Quantity take-off & BOQ

    Take-off straight from the coordinated model, mapped to your measurement rules and cost codes.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Without that discipline the costs land where a tight budget feels them most: senior staff checking junior work after hours, rework consuming margin on fee-sensitive jobs, and information gaps surfacing at handover or audit. JES files clear three review stages before they reach your CDE, and the record of who authored, checked and approved each one travels with the file.

The evidence, from Gulf projects

Towers, transit packages and resort programmes delivered in the Gulf on tight schedules, run on the same ISO 19650 system a rebuild or development programme needs. A sample below.

View all

Common questions about BIM in Lebanon

Both. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the Author-Checker-Approver gate. One accountable team carries the work, not a consultancy advising beside a shop that draws. You get production and standards from the same delivery lead, without carrying a permanent department to do it.

Yes. A delivery lead owns your programme, backed by 260+ engineers on one system, and the team is billed against the packages you send rather than held on payroll between projects. A stretched market makes a permanent BIM department hard to justify, yet rebuild and private development still need capacity. You add it when the work is there and release it when it eases.

Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. A rebuild scheme gets full coordination without a standing department a difficult market cannot support. Your reviewers govern the project rather than police uploads.

Yes. We run laser scan to point cloud to a coordinated record model for rebuild, refurbishment and retrofit work across existing assets. That verified base documents what actually stands, not what was once drawn, and every discipline coordinates against it. It gives rebuild work reliable geometry on stock where old drawings rarely match.

We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. On rebuild and private-development work, conflicts are resolved in the model before they cost time on a site where every input is dear.

Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. A rebuild scheme carries more than a single private development. A zero-cost pilot on one package lets you see the output and the QA gate before you commit margin on a fee-sensitive job.