Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Production capacity that scales with your workload, so a rebuild deadline or a development surge never forces a permanent hire in a difficult market.
Explore Build-sideTrade coordination and shop drawing volume absorbed offshore, with clashes resolved in the model before they cost time on a site where every input is dear.
Explore Owner-sideA single information standard enforced across your consultants and contractors, so every asset in a portfolio hands over with data your operations team can actually use.
ExploreRebuild and private development need capacity without carrying the payroll.
A stretched market makes a permanent BIM department hard to justify, yet rebuild schemes and private development still demand modellers, coordinators and information managers. JES supplies that capacity as a delivered team of 260+ engineers, billed against the packages you send rather than held on your payroll between projects.




























Each service runs through the same Author-Checker-Approver gates and ERP tracking, against a single ISO 19650 baseline that holds from a single rebuilt block to a mixed-use development.

Coordinated models and construction drawings produced to your BEP across all disciplines, checked before they reach your reviewers.
Explore service
4D and 5D analysis that puts programme and cost questions in front of the team while the sequence and the budget can still be changed cheaply.
Explore service
Your CDE, naming protocol and exchange workflows administered day to day, so your information manager governs the project instead of policing uploads.
Explore
Operational asset models with structured data at handover, built for the FM contract that starts the day construction ends.
Explore
Model-based quantities tied to your cost plan, so the QS, the contractor and the client meeting all read from one number.
Explore
Laser-scan verification and record modelling that document what was actually built and what stands of existing structures, not what was once drawn.
ExploreThe whole BIM scope from one team, so adding a service never means onboarding another supplier mid-programme.
Full-discipline Revit production with Navisworks federation, run to a single modelling standard your reviewers learn once.
Office-standard Revit families authored to your graphics, parameters and LOD specification, from joinery to plant.
Sequencing, cost and performance data linked to the model, giving planners and commercial teams one model to work from.
Shop drawings detailed to fabrication tolerance and checked against the federation before they leave JES.
Point clouds processed into as-built models for rebuild, refurbishment and retrofit work across existing assets.
Flat 2D archives converted into coordinated 3D models, so existing buildings get the same single source of truth as new ones.
Handover data structured for CAFM import, so the building's operating model exists before it is occupied.
Take-off straight from the coordinated model, mapped to your measurement rules and cost codes.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Without that discipline the costs land where a tight budget feels them most: senior staff checking junior work after hours, rework consuming margin on fee-sensitive jobs, and information gaps surfacing at handover or audit. JES files clear three review stages before they reach your CDE, and the record of who authored, checked and approved each one travels with the file.
Towers, transit packages and resort programmes delivered in the Gulf on tight schedules, run on the same ISO 19650 system a rebuild or development programme needs. A sample below.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseCoordinated, clash-checked packages issued against your programme dates, so review and site time goes to the build rather than to correcting the model.
Deliverable status lives on an ERP dashboard, not in a chain of chasing emails between your office and ours.
ISO 19650 wired in from kick-off, with EIR, BEP and CDE structure agreed before modelling starts.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the Author-Checker-Approver gate. One accountable team carries the work, not a consultancy advising beside a shop that draws. You get production and standards from the same delivery lead, without carrying a permanent department to do it.
Yes. A delivery lead owns your programme, backed by 260+ engineers on one system, and the team is billed against the packages you send rather than held on payroll between projects. A stretched market makes a permanent BIM department hard to justify, yet rebuild and private development still need capacity. You add it when the work is there and release it when it eases.
Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. A rebuild scheme gets full coordination without a standing department a difficult market cannot support. Your reviewers govern the project rather than police uploads.
Yes. We run laser scan to point cloud to a coordinated record model for rebuild, refurbishment and retrofit work across existing assets. That verified base documents what actually stands, not what was once drawn, and every discipline coordinates against it. It gives rebuild work reliable geometry on stock where old drawings rarely match.
We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. On rebuild and private-development work, conflicts are resolved in the model before they cost time on a site where every input is dear.
Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. A rebuild scheme carries more than a single private development. A zero-cost pilot on one package lets you see the output and the QA gate before you commit margin on a fee-sensitive job.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.