Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Production support across schematic, detailed design and tender packages, modelled to your BEP and your office standard. Your engineers keep the design decisions; we carry the modelling volume.
Explore Build-sideMulti-trade coordination and shop drawings for dense urban sites with tight tolerances. Clashes resolved in the federated model before work starts on site.
Explore Owner-sideYour information requirements enforced across every consultant and contractor feeding the model. Asset data structured for operations from the first exchange, not rebuilt at handover.
ExploreYour engineers already work model-first. What runs out is production hours.
Light rail packages, towers and data centre programmes peak together, and recruitment can't close the gap in time. 260+ engineers behind one QA system add production capacity to your projects without a single local hire. Coordination calls happen live, inside your working day.




























Each service passes the same Author-Checker-Approver gates and the same ERP tracking before issue, whether the project sits in Tel Aviv, Haifa or Jerusalem.

Architecture, structure and MEP modelled and coordinated to construction tolerance, with shop drawings issued from the federated model rather than redrawn beside it.
Explore service
4D sequencing and 5D cost analysis test the programme and the budget in the model, where corrections cost hours instead of weeks on site.
Explore service
CDE setup, naming conventions and exchange workflows run for you, so your EIR and BEP are enforced on every supplier across the project.
Explore
Operational asset models with structured, CAFM-ready data, so your FM team runs the building from the model after handover.
Explore
Quantities taken directly from the coordinated model, giving cost planners, procurement and commercial teams one defensible number.
Explore
Scan-verified record models that document what was built rather than what was drawn, with deviation flagged early enough to correct.
ExploreEvery BIM discipline delivered from a single production floor, so an Israeli project adds capacity without adding vendors.
Revit, Civil 3D and Navisworks production across all disciplines, run to a single modelling standard whatever the package.
Revit families built to your LOD specification and naming convention, from facade components to mechanical plant.
4D programme simulation, 5D cost linkage and 6D performance data added where the project brief demands them.
Shop drawings coordinated against the federated model and issued at construction tolerance, ready for fabrication.
Point cloud processing into as-built models for retrofit and densification work in established urban fabric.
Legacy 2D archives rebuilt as coordinated 3D models, so refurbishment work starts from reliable geometry.
Asset data structured to COBie and CAFM requirements, so operations teams start from the model on day one.
Model-based quantity take-off mapped to your cost structure, keeping BOQs and variations on one number.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Skip the gate and the failure modes are familiar: late packages, drawings that contradict each other on site and asset data that arrives at handover as a folder of PDFs. Every JES deliverable carries a named author, checker and approver, a record you can put in front of your client or your auditor.
Metro MEP packages, airport-scale work and waterfront resorts, coordinated and handed over under the system now available to Israeli teams.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseCoordinated drawing sets issued against the programme from a federated model that has already passed clash resolution.
Every drawing leaves with its author, checker and approver named, and ERP dashboards show where each package sits in the workflow.
ISO 19650 structure from project setup: EIR, BEP and CDE configured on day one, before the first model element is produced.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the Author-Checker-Approver gate. That means one accountable team carries your project, not a consultancy that advises alongside a shop that draws. You get production and standards from the same delivery lead.
Yes. A dedicated delivery lead owns your programme and coordination calls run live inside your working day, backed by 260+ engineers on one QA system. Capacity scales as light rail, tower and data centre peaks land together, without a single local hire. You add production hours when the work demands them and release them when it eases.
Yes. Our BIM consultants embed in your delivery, set the BEP and LOD schedule and hold the work to ISO 19650, with one named lead accountable across the programme. Coordination happens live inside your working day rather than across a delay. Your engineers keep the design decisions while we carry the modelling volume.
Yes. We run laser scan to registered point cloud to a coordinated record model that matches the fabric as it actually stands. On retrofit and densification work in established urban stock, that verified base is what every discipline coordinates against. It replaces guesswork with geometry your team can design and build from.
We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. On dense urban sites conflicts are resolved in the federated model before work starts on the ground.
Cost follows scope, disciplines, the LOD you need and programme length, so we price each engagement to the actual work rather than a flat day rate. A data centre programme carries more than a single tower. A zero-cost pilot on one package lets you see the output and the QA gate before you commit.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.