Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.
Design and tender packages produced to your BEP while your senior engineers stay on design intent. Production capacity that holds through the whole package, regardless of staff turnover.
Explore Build-sideCoordination and shop drawings across structure, architecture and MEP for large-format sites, with clashes closed in the model before they reach the slab.
Explore Owner-sidePortfolio-wide information governance: your standards written into the EIR and enforced on every consultant and contractor, district after district.
ExploreEgypt's strongest BIM engineers keep being recruited into the Gulf. Your capacity doesn't have to leave with them.
New-capital districts, coastal developments and national infrastructure all need documentation at once, while senior modellers move abroad. One delivery system, 260+ engineers deep, gives Egyptian teams the same production floor Gulf programmes already use, without competing for the same CVs.




























From Cairo to the coast, every deliverable runs through identical QA gates, ERP tracking and an ISO 19650 baseline before it leaves the floor.

Discipline modelling, federation and clash resolution issued to construction tolerance, so packages reach an Egyptian site fully coordinated.
Explore service
4D and 5D analysis that tests the programme and the budget in the model, before mobilisation makes every correction expensive.
Explore service
CDE management, naming discipline and exchange control run as a service, so the BEP governs every supplier on the project.
Explore
Asset information models with operations-ready data, structured so the building can be run from the model from the day it opens.
Explore
Quantities extracted from the coordinated model and tied to your cost plan, giving the commercial team one dataset across the programme.
Explore
Scan to record-model verification that documents the building as built and flags deviation while it can still be corrected on site.
ExploreThe full BIM scope handled by a single supplier, so an Egyptian programme runs on one contract instead of three offshore vendors.
Architecture, structure and MEP production in Revit, Civil 3D and Navisworks under one modelling standard.
Parametric Revit families built to your LOD specification and your naming rules, from joinery to plant rooms.
Programme in 4D, cost in 5D and performance in 6D, applied where the project brief justifies the data.
Shop drawings at construction tolerance, verified against the federated model before issue.
Point clouds converted into dependable as-built models for retrofit, extension and record purposes.
Flat 2D archives rebuilt as coordinated 3D models, so legacy assets join the same information environment as new ones.
Handover data structured for CAFM systems, giving facilities teams a working model from day one of operations.
Model-based take-off mapped to the cost codes your QS team runs, one number across the programme.
Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.
Lose the gate and the symptoms appear fast: programme slip, contradictory drawings, audit findings and a handover file the operator can't use. JES deliverables move with a full Author-Checker-Approver record, evidence you can put in front of a client, a lender or an auditor.
Metro systems, giga-projects and landmark cultural buildings across the UAE and Saudi Arabia, all delivered through the system now open to Egyptian programmes.

Terminal-scale design packages for Dar Al-Handasah on Dubai World Central's next…
Read the case
MEP modelled and coordinated across Blue Line stations and depots for MNG Esmas,…
Read the case
Over 100 people at peak across MEP, structural and interior fit-out packages on …
Read the case
Every N+1 and 2N redundancy path verified in 3D against Tier-rating requirements…
Read the case
Mechanical, electrical and plumbing threaded through Foster + Partners' steel-fe…
Read the case
Shop drawing release synced to the tower pour cycle on AFE's fast-track golf-fac…
Read the case
Every consultant and contractor on Al-Futtaim's master-planned villa and low-ris…
Read the caseIssue-ready drawing packages produced from a clash-free federated model and released against the construction programme.
Every file signed by a named author, checker and approver, tracked in ERP dashboards your team can read at any hour.
ISO 19650 in place from project setup, so the information structure exists before the first model element does.
Why "coordinated" models still cause site rework, and the handoff that fixes it.
ReadThe difference between a filed document and a working agreement is five sections.
ReadZero hard-clash is table stakes. Here is the tolerance standard we hold a federated model to before sign-off.
ReadWhen quantities come straight from the model, variations stop being arguments and become deltas.
ReadRetrofitting an as-built at practical completion is a tax. Updating it weekly is a habit.
ReadBoth. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the gate. That means one accountable team, not a consultancy that advises next to a shop that draws. You get production and standards from the same delivery lead across the programme.
Yes. A delivery lead owns your programme, backed by 260+ engineers on one system, so new-capital districts and coastal work get capacity without competing for the CVs the Gulf is already hiring. The team scales against the programme, with no permanent hire. Senior modellers moving abroad no longer thin the bench mid-package.
Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. Running on one delivery system keeps standards steady even as staff turnover pulls at the local market. Your senior engineers stay on design intent while we carry the volume.
Yes. We run laser scan to point cloud to a coordinated record model for retrofit, extension and record work. That verified base is what every discipline coordinates against, so the model matches the building as it stands. It gives existing-asset work dependable geometry rather than archive drawings that no longer match.
We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. On large-format sites, clashes are closed in the model before they reach the slab.
Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. A new-capital district carries more than a single coastal development. A zero-cost pilot on one package lets you see the output and the QA gate before you commit.
The full ACA framework PDF, the Responsibility Matrix template, and the EIR / BEP checklist we use on every project.
We'll walk you through a live ERP dashboard from an active project and you'll walk away with our ACA template, whether or not we work together.
We run the ACA framework on a single package. You get ERP visibility from day one. Zero-cost pilot, capped scope, clear exit.