Federated BIM model, mixed-use development

Systematized BIM services in Egypt.

Production, coordination and governance to ISO 19650, delivered as a full BIM team for consultants, contractors and developers. No internal hire, no management overhead.

Egypt's strongest BIM engineers keep being recruited into the Gulf. Your capacity doesn't have to leave with them.

New-capital districts, coastal developments and national infrastructure all need documentation at once, while senior modellers move abroad. One delivery system, 260+ engineers deep, gives Egyptian teams the same production floor Gulf programmes already use, without competing for the same CVs.

Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood
Prestige One
Al-Futtaim
AECOM
Dar Al-Handasah
Arup
WA International
SCDA
Dezigntechnic
H2R Design
Innovo
M4
MNG
Günal
ALEC
ALEMCO
Voltas
ALEC Fitout
DEPA
Al Tayer Stocks
Abaad Wood

Everything BIM, one team to brief

The full BIM scope handled by a single supplier, so an Egyptian programme runs on one contract instead of three offshore vendors.

  • 3D BIM modelling

    Architecture, structure and MEP production in Revit, Civil 3D and Navisworks under one modelling standard.

  • Revit family creation

    Parametric Revit families built to your LOD specification and your naming rules, from joinery to plant rooms.

  • 4D, 5D and 6D simulation

    Programme in 4D, cost in 5D and performance in 6D, applied where the project brief justifies the data.

  • Shop drawings & detailing

    Shop drawings at construction tolerance, verified against the federated model before issue.

  • Scan to BIM

    Point clouds converted into dependable as-built models for retrofit, extension and record purposes.

  • CAD to BIM conversion

    Flat 2D archives rebuilt as coordinated 3D models, so legacy assets join the same information environment as new ones.

  • BIM for facility management

    Handover data structured for CAFM systems, giving facilities teams a working model from day one of operations.

  • Quantity take-off & BOQ

    Model-based take-off mapped to the cost codes your QS team runs, one number across the programme.

Three sets of eyes before it leaves.

Every JES deliverable moves through a fixed Author-Checker-Approver gate, tracked in the CDE. The same standard whether it's engineer 3 or engineer 250.

Author
Model and documentation produced to the MIDP task card. Self-review against the project QA checklist before submission.
Status: WIP
Checker
Independent review against the BEP and federated model. Defects logged, deviation report returned to Author.
Output: Deviation report
Approver
Signed off against EIR and LOIN. Promoted from WIP to Shared or Published in the CDE.
Status: Published

Lose the gate and the symptoms appear fast: programme slip, contradictory drawings, audit findings and a handover file the operator can't use. JES deliverables move with a full Author-Checker-Approver record, evidence you can put in front of a client, a lender or an auditor.

Delivered at mega-project scale

Metro systems, giga-projects and landmark cultural buildings across the UAE and Saudi Arabia, all delivered through the system now open to Egyptian programmes.

View all

Common questions about BIM in Egypt

Both. We produce the models, drawings and coordination, and we govern them through the BEP, the CDE and the gate. That means one accountable team, not a consultancy that advises next to a shop that draws. You get production and standards from the same delivery lead across the programme.

Yes. A delivery lead owns your programme, backed by 260+ engineers on one system, so new-capital districts and coastal work get capacity without competing for the CVs the Gulf is already hiring. The team scales against the programme, with no permanent hire. Senior modellers moving abroad no longer thin the bench mid-package.

Yes. Our BIM consultants embed in your delivery, set the BEP and LOD and hold the work to ISO 19650, with one named lead accountable across the programme. Running on one delivery system keeps standards steady even as staff turnover pulls at the local market. Your senior engineers stay on design intent while we carry the volume.

Yes. We run laser scan to point cloud to a coordinated record model for retrofit, extension and record work. That verified base is what every discipline coordinates against, so the model matches the building as it stands. It gives existing-asset work dependable geometry rather than archive drawings that no longer match.

We model architectural, structural and MEP in Revit, federate in Navisworks and run regular clash cycles on one model. Every file is authored, checked and approved against the BEP before issue, at construction tolerance. On large-format sites, clashes are closed in the model before they reach the slab.

Cost follows scope, disciplines, the LOD you need and programme length, so we scope each engagement to the actual work rather than a flat day rate. A new-capital district carries more than a single coastal development. A zero-cost pilot on one package lets you see the output and the QA gate before you commit.